Suncor Dredging - West Dock Berth

Suncor Energy Products Partnership proposes to undertake maintenance dredging within the West Dock berth pocket at the Burrard Products Terminal in Burrard Inlet, British Columbia. The project is intended to restore and maintain navigational depth for vessel operations at the existing berth. Suncor selected a target dredge elevation of approximately -13.0 m Chart Datum based on recent vessel operating data and a tidal analysis of 2026 water levels, which indicated that dredging to this elevation would reduce the number of instances where vessels need to wait for an acceptable tide. The project does not propose new marine infrastructure or structural modifications to the existing wharf and berthing dolphins.

The proposed dredge footprint is approximately 1,500 m², with an estimated neat dredge volume of approximately 700 m³. Dredging would remove sediment to a target elevation of approximately -13.0 m CD, with the estimated dredge depth ranging from 0 to 1.9 m. The current design is at the permitting level and does not yet include side slopes or final dredging tolerances.

The dredging program would involve mobilization of marine-based equipment, mechanical dredging using a clamshell dredge mounted on a barge, temporary handling of dredged material, transportation of the material, and demobilization. Equipment is expected to include a clamshell dredge, barge, tugboats, and scows. No land-based heavy equipment is anticipated for the dredging operations.

Dredged material would be transported to an approved upland facility for treatment and disposal or placement. Disposal at sea is not proposed. Any required dewatering or stabilization would be undertaken in accordance with the Construction Environmental Management Plan and the requirements of the receiving facility.

The project is proposed to occur between November and December 2026, with dredging activities anticipated to take approximately one to two weeks. The work is proposed within the DFO least-risk timing window for Burrard Inlet of August 16 to February 28.

Environmental management measures will be implemented to address potential effects associated with sediment disturbance, turbidity, fish and fish habitat, underwater noise, and marine vessel operations.

More


Latest update

Public notice

Suncor Dredging - West Dock Berth – Public comments invited

September 23, 2026 - As part of its Project and Environmental Review process, the Vancouver Fraser Port Authority must determine whether the Suncor Dredging - West Dock Berth are likely to cause significant adverse environmental effects. Written comments to be received by October 22nd, 2026.

Participate

Key documents

Key documents
Document number Document title File Date
1 Notice of Intent to Make a Determination - Suncor Dredging West Dock Berth - Vancouver Fraser Port Authority - September 23, 2026

Contacts

Project and Environmental Review
Vancouver Fraser Port Authority
100 The Pointe, 999 Canada Place
Vancouver BC V6C 3T4
Email: per@portvancouver.com


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

  • Location

    • Suncor Dredging - West Dock Berth (British Columbia)
  • Nature of activity

    • Ports and Harbours
  • Assessment status

    In progress
  • Start date

    2026-09-23
  • Proponent

    Suncor Energy Products Partnership
  • Authorities

    • Vancouver Fraser Port Authority
  • Assessment type

    Project on federal lands
  • Reference number

    90797

Nearby assessments

...within 200 kilometres
Date modified: