LaPointe Pier Repairs - GCT Vanterm

Legacy Environmental on behalf of Global Container Terminals Inc. proposes to conduct maintenance and structural rehabilitation of the LaPointe Pier located at GCT Vanterm in Burrard Inlet, Vancouver. The works are required to address localized failure and ongoing corrosion of sheet piles along the pier, including approximately 40 metres of collapsed sheet piles that have reduced berth depth and compromised structural integrity. The objective is to restore berth functionality, maintain safe operations, and stabilize existing infrastructure without expanding the footprint of the pier.

Proposed in-water works include removal of collapsed sheet piles from the seabed, installation of approximately 75 square metres of gabion baskets along the western pier face, and placement of approximately 490 square metres of riprap at the northeast corner of the structure. Additional activities may include re-securing existing sheet piles with anchor rods and steel strapping, installation of corrosion protection anodes, and underwater welding and drilling associated with these repairs.

Construction will be undertaken using divers working from the pier and/or a barge-mounted crane, with supporting equipment such as hydraulic tools, welding equipment, and material placement from barge or land-based staging. Works will proceed in phases including demolition/removal, inspection, installation of stabilization measures, and armouring. In-water works are anticipated to occur over approximately 10 weeks.

More


Latest update

End of Public Comment Period 

The public comment period on the project is closed. The Vancouver Fraser Port Authority and Fisheries and Oceans Canada are considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects.

Participate

Key documents

Key documents
Document number Document title File Date
1 Notice of Intent to Make a Determination - LaPointe Pier Repairs - Vancouver Fraser Port Authority and Fisheries and Oceans Canada - June 29, 2026

Contacts

Project and Environmental Review
Vancouver Fraser Port Authority
100 The Pointe, 999 Canada Place
Vancouver, British Columbia V6C 3T4
Email: per@portvancouver.com


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

  • Location

    • LaPointe Pier Repairs - GCT Vanterm (British Columbia)
  • Nature of activity

    • Ports and Harbours
  • Assessment status

    In progress
  • Start date

    2026-06-29
  • Proponent

    GCT Vanterm
  • Authorities

    • Fisheries and Oceans Canada
    • Vancouver Fraser Port Authority
  • Assessment type

    Project on federal lands
  • Reference number

    90587

Nearby assessments

...within 200 kilometres
Date modified: