Amendment to the construction hours in respect to condition 15 of the approved Golden Ears Forcemain (GDEFM) (PER No. 20-163)

The proposed amendment 

Metro Vancouver proposes to carry out physical works associated with the approved Golden Ears Forcemain (GDEFM) project to perform horizontal directional drilling (HDD) operations continuously (24 hours a day, 7 days a week), excluding statutory holidays. This would require an amendment to condition 15 of the approved project permit, which states: 

All general construction and physical activities related to the project shall be conducted from Monday to Saturday between the hours of 7:00 AM and 8:00 PM. These hours are not to be modified without prior approval of the port authority. Permission for variance must be submitted with a written request at least 30 business days prior to the desired start date. 

The Vancouver Fraser Port Authority understands that these works are not anticipated to generate significant noise and that Metro Vancouver is committed to applying general noise reduction and mitigation practices to prevent and minimize disturbances. 

More


Latest update

Notice of Determination 

Maple Ridge, B.C. – November 30, 2022 – The Vancouver Fraser Port Authority has determined that the proposed amendment to the construction hours in respect to condition 15 of the approved Golden Ears Forcemain (GDEFM) (PER No. 20-163) located at approximately 250 metres west of the Golden Ears Bridge is not likely to cause significant adverse environmental effects.

Participate

Key documents

Key documents
Document Number Document Title File Date
2 Notice of Determination - November 30, 2022
1 Amendment to the construction hours in respect to condition 15 of the approved Golden Ears Forcemain (GDEFM) (PER No. 20-163) - November 1, 2022

Contacts

Project and Environmental Review
Vancouver Fraser Port Authority
100 The Pointe, 999 Canada Place
Vancouver, British Columbia V6C 3T4
Email: per@portvancouver.com


  • Location

    • Amendment to the construction hours in respect to condition 15 of the approved Golden Ears Forcemain (GDEFM) (PER No. 20-163) (British Columbia)
  • Nature of Activity

    • Water Management
    • Other, not otherwise specified
  • Assessment Status

    Completed
  • Start Date

    2022-11-01
  • Proponent

    Metro Vancouver
  • Authorities

    • Vancouver Fraser Port Authority
  • Assessment Type

    Project on federal lands
  • Reference Number

    84083
Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Nearby assessments

...within 200 kilometres
Date modified: