Registry Search Mobile

Registry Search

New Pile Installation for Recreational Dock

Blue Water Systems on behalf of the upland property owner proposes to conduct maintenance and repair works to an existing recreational dock located in Burrard Inlet at 4505 Belcarra Bay Road, Village of Belcarra. The proposed works include the installation of two steel piles to support and secure the existing float. The dock is currently anchored to the seabed by chains and anchors, which will be removed following the installation of new support piles. The piles are anticipated to be installed by barge and crane and driven by vibratory and/or drop hammer.


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Latest update

End of Public Comment Period

The public comment period on the project is closed. The Vancouver Fraser Port Authority is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects.

List all records

Contacts

Project and Environmental Review
Vancouver Fraser Port Authority
100 The Pointe, 999 Canada Place
Vancouver, BC V6C 3T4
Email: per@portvancouver.com


  • Location

    • New Pile Installation for Recreational Dock (British Columbia)
  • Project Type

    • Recreation and Tourism
    • Ports and Harbours
  • Status

    In progress
  • Start Date

    2020-08-14
  • Proponent

    Blue Water Systems
  • Authorities

    • Vancouver Fraser Port Authority
  • Assessment Type

    Project on federal lands
  • Reference Number

    80937

Nearby projects

..within 200 kilometres
Date modified: