Neptune Terminal maintenance dredging at Berth 2 and 3

The Proposed Project

Neptune Bulk Terminals (Canada) Ltd. proposes to conduct maintenance dredging at Berth 2 and 3 of its terminal in North Vancouver. The purpose of the project is to dredge and remove accumulated sediment to achieve appropriate vessel clearance at the berth. The scope of works includes dredging of approximately 18 cubic metres of sediment at both Berth 2 and 3. Dredging is proposed to be completed by clamshell environmental bucket to mitigate increased turbidity. Dredge material will be disposed of at an appropriate upland facility. The project is proposed to commence in late August 2020 and would be completed within the least risk fish window for Burrard Inlet.


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Latest update

End of Public Comment Period

The public comment period on the project is closed. The Vancouver Fraser Port Authority is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects.

List all records

Contacts

  • Project and Environmental Review
  • 100 The Pointe, 999 Canada Place
  • Vancouver, BC, V6C 3T4
  • Email: per@portvancouver.com

  • Location

    • Neptune Terminal maintenance dredging at Berth 2 and 3 (British Columbia)
  • Project Type

    • Ports and Harbours
    • Waste Management
  • Status

    In progress
  • Start Date

    2020-06-22
  • Proponent

    Neptune Bulk Terminals (Canada) Ltd.
  • Authorities

    • Vancouver Fraser Port Authority
  • Assessment Type

    Project on federal lands
  • Reference Number

    80797