Fibreco Terminal Enhancement Project Amendment (Stormwater Design)

Fibreco Export Incorporated is proposing to undertake stormwater utility works related to the Fibreco Terminal Enhancement Project that were not originally included in the approved scope of works. The proposed amended works are as follows:

  • Excavation of a 20 square metre area to a depth of approximately 2 metres
  • Installation of a 450 millimetre PVC pipe, approximately 20 metres in length
  • Installation of a new stormwater outfall along the southern boundary of the site, to discharge stormwater directly into Burrard Inlet.
  • Installation of rip rap (approximately 1 metre wide by 1 metre depth) with 150 millimetre filter rock and concrete grouting between rip rap and new outlet pipe to tie into existing armouring

Latest update

July 20, 2020 - The assessment decision statement has been issued to the proponent.

Participate

Contacts

Project and Environmental Review
Vancouver Fraser Port Authority
100 The Pointe, 999 Canada Place
Vancouver, British Columbia V6C 3T4
Email: per@portvancouver.com


  • Location

    • North Vancouver (British Columbia)
  • Nature of Activity

    • Water Management
  • Assessment Status

    Completed
  • Start Date

    2020-01-24
  • Proponent

    Fibreco Export Incorporated
  • Authorities

    • Vancouver Fraser Port Authority
  • Assessment Type

    Project on federal lands
  • Reference Number

    80453