Debris Deflector Installation

The Vancouver Fraser Port Authority's Engineering & Asset Management Department proposes to install a debris deflector between Berth 1 and 2's a damaged training wall. The debris deflector is required to deter the ingress of debris through the wall breach and prevent potential damage to terminal infrastructure (i.e., concrete piles and dock structures) and berthing vessels. The project consists of using a vibratory hammer to drive two 900-millimetre steel piles. The piles will form end supports for five deflector logs. In addition, a 90-metre-long log chain will be installed and held in place with two 23-metre-long restraint chains tied to two concrete lock blocks near the shoreline.


Latest update

Notice of Determination

Delta, B.C.July 28, 2023– The Vancouver Fraser Port Authority has determined that the proposed Debris Deflector Installation located at #100, 820 Dock Road, Delta, BC is not likely to cause significant adverse environmental effects.

Participate

Contacts

Project and Environmental Review
Vancouver Fraser Port Authority
100 The Pointe, 999 Canada Place
Vancouver, British Columbia V6C 3T4
Email: per@portvancouver.com


  • Location

    • Debris Deflector Installation (British Columbia)
  • Nature of Activity

    • Ports and Harbours
  • Assessment Status

    Completed
  • Start Date

    2023-05-24
  • Proponent

    The Vancouver Fraser Port Authority's Engineering & Asset Management Department
  • Authorities

    • Vancouver Fraser Port Authority
  • Assessment Type

    Project on federal lands
  • Reference Number

    84620