Installation of no anchor sign

Metro Vancouver proposes to install one sign on piles on the south bank of the Fraser River, approximately 500 metres west of the Port Mann Bridge. The sign is required to notify marine users of a no anchor zone near the Metro Vancouver Port Mann Water Main crossing No. 2. The sign would be an approximately 1.8-metre-wide aluminum panel and would attach to two 324-millimetre diameter steel piles. Piles would be driven to an approximate depth of 10 metres. Works will be completed with a marine spud derrick equipped with a vibratory hammer or from the upland.


Latest update

End of public comment period 

The public comment period on the project is closed. The Vancouver Fraser Port Authority is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects.

Participate

Contacts

Project and Environmental Review
Vancouver Fraser Port Authority
100 The Pointe, 999 Canada Place
Vancouver, British Columbia V6C 3T4
Email: per@portvancouver.com


  • Location

    • Installation of no anchor sign (British Columbia)
  • Nature of Activity

    • Ports and Harbours
  • Assessment Status

    In progress
  • Start Date

    2023-08-22
  • Proponent

    Metro Vancouver
  • Authorities

    • Vancouver Fraser Port Authority
  • Assessment Type

    Project on federal lands
  • Reference Number

    85858
Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 