GCT Deltaport Expansion - Berth Four Project

GCT Canada Limited Partnership is proposing to expand its existing GCT Deltaport Container Terminal, a container storage and handling facility located in Delta, British Columbia, approximately 35 kilometres south of Vancouver. As proposed, the GCT Deltaport Expansion - Berth Four Project would add a fourth berth on the east side of the Roberts Bank Causeway, include an expansion of the intermodal rail yard along the causeway (Roberts Bank Way) and dredging to provide safe access for ships. The additional land-based container storage and handling facilities would provide an additional two million 20-foot long storage containers (otherwise referred to as 20-foot equivalent units or TEUs) per year at the existing terminal.


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Latest update

November 23, 2021 — The public comment period on the draft Joint Guidelines and the draft Joint Assessment Plan has been extended by 15 days and will now end on January 7, 2022.

 

November 3, 2021 — The Minister of the Environment and Climate Change has referred the impact assessment to a review panel.

 

October 28, 2021 — The Impact Assessment Agency of Canada has decided that an impact assessment is required for the GCT Deltaport Expansion – Berth Four Project. The Agency has accepted the proponent's Detailed Project Description and a summary of the Detailed Project Description is also available. The Agency has also resumed and extended the timeline for the impact assessment.

Participate

Key documents

Key documents
Document Number Document Title File Date
86 Agenda for Joint Virtual Information Sessions PDF (185 KB) November 22, 2021
84 Updated Assessment Boundaries Proposed by GCT (see Reference #78) PDF (8.8 MB) November 17, 2021
83 Public Comment Period - Supporting Documents - November 10, 2021
82 Public Notice: Public Comment Period & Virtual Information Sessions (Updated November 23, 2021) - November 10, 2021
81 Draft Joint Indigenous Engagement and Partnership Plan PDF (912 KB) November 8, 2021
80 Draft Joint Permitting Plan/Regulatory Coordination Plan PDF (1.4 MB) November 8, 2021
79 Draft Joint Assessment Plan PDF (525 KB) November 8, 2021
78 Draft Joint Guidelines (also see Reference #84) PDF (3 MB) November 8, 2021
76 Notice of Referral to Review Panel - November 3, 2021
74 Notice of Time Limit Extension with Reasons - October 28, 2021
73 Notice of Time Limit Resuming - October 28, 2021
72 Notice of Impact Assessment Decision with Reasons - October 28, 2021
71 Summary of the Detailed Project Description PDF (7.3 MB) October 28, 2021
62 Notice of Time Limit Suspension with Reasons - January 8, 2021
61 Joint Summary of Issues and Engagement PDF (728 KB) December 23, 2020
2 Summary of an Initial Project Description of a Designated Project PDF (5.3 MB) September 18, 2020
1 Initial Project Description of a Designated Project PDF (9.8 MB) September 18, 2020

List all records

Contacts

GCT Deltaport Expansion - Berth Four Project
Impact Assessment Agency of Canada
160 Elgin Street
22nd Floor
Ottawa, Ontario K1A 0H3
Telephone: 343-572-7144
Email: deltaport@iaac-aeic.gc.ca


  • Location

    • Delta (British Columbia)
  • Nature of Activity

    • Ports and Harbours
  • Assessment Status

    In progress
  • Start Date

    2020-09-28
  • Proponent

    GCT Canada Limited Partnership
  • Authorities

    • Impact Assessment Agency of Canada
  • Assessment Type

    Planning Phase for Impact Assessment
  • Reference Number

    81010

Nearby assessments

..within 200 kilometres
Date modified: