Proposed Wellsite Expansion within 11-06-043-09W5M and associated Borrow Pit in Sunchild Indian Reserve

The proposed wellsite expansion by TAQA North Ltd  is being constructed within 11-06-43-9W5M in Sunchild Reserve to allow for the drilling of 2 additional gas wells from an existing lease. The borrow pit is located entirely within the footprint of an existing borrow pit. Additional footprint for this project will be 0.73 ha yielding to a total of 2.22 ha (existing plus new footprint).


Latest update

March 9, 2025 – The public comment period on the project is closed. IOGC is considering comments received to help inform its determination on whether carrying out of the project is likely to cause significant adverse environmental effects.

Participate

Key documents

Key documents
Document number Document title File Date
1 Notice of Intent to Make a Determination - Start of Public Comment Period - February 5, 2025

Contacts

Indian Oil and Gas Canada
Joseph Kimetu, Environmental Analyst
9911 Chiila Boulevard Suite 100
Tsuu T'ina, AB, Alberta T3T 0E1
Telephone: 403-702-2351
Email: joseph.kimetu@sac-isc.gc.ca


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

  • Location

    • Sunchild Reserve (Alberta)
  • Nature of Activity

    • Oil and Gas
  • Assessment Status

    Completed
  • Start Date

    2025-02-05
  • Proponent

    TAQA North Ltd
  • Authorities

    • Indigenous Services Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    89229