Parks Canada Agency - Trail 8c Re-route in Jasper National Park
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
This project will be assessed with a basic impact assessment. Trail 8c, in its current condition, is impassable. The project footprint is about 2225m long x 1.5m large. The route is not fixed as it can be altered to avoid tree removal. It is expected that 15-20 smaller trees will require removal. Small excavator, skid steer and track dumper will be used in construction. Hand tools will be needed for trail shaping and more detailed work.
Project under reconsideration as of May 1 2020.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Parks Canada has issued a notice of determination and decided that the project is not likely to cause significant adverse environmental effects | - | September 6, 2022 |
1 | New project being assessed by Parks Canada - Public comments invited from 22 january to 21 february 2020 | - | January 22, 2020 |
Contacts
Jasper National ParkBox 10
Jasper, Alberta T0E 1E0
Telephone: 780-852-6141
Email: evaluationdimpactjasper-jasperimpactassessment@pc.gc.ca
-
Location
- Jasper National Park (Alberta)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
Completed -
Start Date
2020-01-22 -
Proponent
Parks Canada -
Authorities
- Parks Canada Agency
-
Assessment Type
Project on federal lands -
Reference Number
80425
Nearby assessments
...within 200 kilometres-
Parks Canada Agency Pyramid Bench Fire Guard Prescribed Burn
Jasper National Park of Canada -
Trans Mountain Corporation Sleepy Hollow Line Replacement
Jasper National Park -
JTA - Hochimini Trail Realignment
Jasper National Park -
Pine Bungalows Master Plan 2021
Jasper National Park -
Trail 1a Jasper National Park
Jasper National Park -
Parks Canada Agency Douglas Fir Slopes Prescribed Burn
Jasper National Park -
Trail 8c Realignment
Jasper National Park of Canada -
Trans Mountain Fibre Gaps Project
Jasper National Park -
Caribou Conservation Breeding and Augmentation Project in Jasper National Park
Jasper National Park, Detailed Impact Assessment -
Jacques Lake Realignment
Jasper National Park of Canada -
Marmot Basin Knob Chair Lift Line Replacement
Jasper National Park of Canada -
Parks Canada Agency Backcountry Meadows Prescribed Burn
Jasper National Park -
Parks Canada Agency Snaring River Bridge Rehabilitation
Jasper National Park of Canada -
Trans-Mountains KP400.2 Derr Creek - TMPL 24" Depth of Cover and Bank Protection Mitigation
Jasper National Park -
Trans Mountain Pipeline ULC KP404 Integrity Dig
Jasper National Park of Canada -
Evelyn Creek trail re-adoption into official trail network
Jasper National Park -
ATCO Miette 5L215 Rebuild
Jasper National Park -
Pyramid Lake Resort Wastewater Treatment Plant and Disposal System
Jasper National Park -
Depth of Cover Mitigation at four sites on the 114.3 mm Jasper Transmission Pipeline in Proximity to the Fiddle River
Jasper National Park -
Parks Canada Agency Prescribed Burns- Southesk, Talbot Lake
Jasper National Park -
Coalspur Vista Coal Mine Phase II Expansion Project
3.5 kilometres east of Hinton -
Coalspur Vista Coal Underground Mine and Expansion Activities Project
10 kilometres east of Hinton -
Trans Mountain Pipeline Fiddle River Hazard Remediation
Jasper National Park -
Robb Trend Coal Mine Expansion Project
Robb -
Highway 93 N 2020 Rip Rap Sourcing Program
Banff National Park -
Alexandra Patrol Cabin Demolition and Removal
Banff National Park -
Cascade Power Plant Project
Yellowhead County -
Highway 947 Extension Project
Edson -
Summit Mine 14 Project
Grande Cache -
Ruddock Creek Mine Project
Avola -
Big Horn Reserve Water System
Big Horn Reserve No. 144A -
Big Horn Fire Hall
Big Horn Reserve -
New Fibre Installation
Big Horn 144A - site 2(BH-FSA) -
New Fibre Installation
Big Horn 144A - site 1(BH-POP) -
Stoney Nation Big Horn Wastewater System
Big Horn No. 144A -
Owen Creek Warden Cabin Decommissioning
Banff National Park -
Edson Mainline Expansion Project
Drayton Valley -
Water Survey Canade Silverhorn Water Meter Station
Banff National Park -
Edson Mainline Expansion Project
Drayton Valley -
Highway 947 Extension Project
-
Lodge at Bow Lake Staff Accommodation, Dining Tent, and Parking Lot
Banff National Park of Canada -
O'Chiese Culvert 2 Replacement Project
O'Chiese First Nation -
Harper Creek Mine Project
Vavenby -
Hazard Spruce Tree Removal
Glacier National Park -
O'Chiese Culvert 1 Replacement Project
O'Chiese First Nation -
O'Chiese Culvert 3 Replacement Project
O'Chiese First Nation -
Sunchild 202 Reserve oil and gas development
Sunchild Reserve 202 -
Sunchild Culvert 2 Replacement Project
Sunchild First Nation -
Margaret Creek Fish Barrier Creation
Banff National Park -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve 203 -
Sunchild Gas Distribution Line
Sunchild -
Sunchild First Nation Lagoon and Residential Access Road Project
Sunchild First Nation -
Sunchild First Nation Subdivision Planning
Sunchild First Nation -
O'Chiese Indian Reserve Pipeline
Sunchild Indian Reserve -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve -
O'Chiese First Nation
O'Chiese First Nation -
Sunchild Culvert 1 Replacement Project
Sunchild First Nation -
O'Chiese Indian Reserve 203
O'Chiese Indian Reserve 203 -
RW-4852 and OS-7246 Authorization to Construct and Operate a Right of Way for a natural gas Pipeline and associated riser
Alexander First Nation -
Edson Mainline Expansion Project
Rocky Mountain House -
NOVA Gas Transmission Ltd. - 2021 NGTL System Expansion Project
Grande Prairie