Petro Canada Wildfire Rebuild
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The Petro Canada gas station located at 701 Connaught Drive in Jasper, Alberta, was destroyed by the 2024 wildfire. Debris demolition is complete, and Suncor Energy has submitted an application to redevelop the site into a gas station with a six channel pump island, convenience store and quick-service restaurant. The redevelopment will also include the installation of four underground storage tanks in a new tank nest location and a series of groundwater monitoring wells.
Latest update
Participate
Key documents
| Document Number | Document Title | File | Date |
|---|---|---|---|
| 1 | New project being assessed by Parks Canada – Public comments invited from November 21 2025 to December 21 2025 | - | November 21, 2025 |
Contacts
Jasper National ParkBox 10
Jasper, Alberta T0E 1E0
Telephone: 780-852-6141
Email: evaluationdimpactjasper-jasperimpactassessment@pc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Jasper National Park of Canada (Alberta)
-
Nature of Activity
- Building and Property Development
- Oil and Gas
-
Assessment Status
In progress -
Start Date
2025-11-21 -
Proponent
Suncor -
Authorities
- Parks Canada Agency
-
Assessment Type
Project on federal lands -
Reference Number
90017
Nearby assessments
...within 200 kilometres-
Trans Mountain Corporation Sleepy Hollow Line Replacement
Jasper National Park -
Tekarra Lodge Wildfire Rebuild
Jasper National Park of Canada -
ATCO Electric - Pyramid Bench Underground Conversion
Jasper National Park -
Biocontrol of Linaria dalmatica (Dalmatian Toadflax) using the agent Mecinus janthiniformis (Stem-boring weevil) in Jasper National Park
Jasper National Park of Canada -
Parks Canada Pyramid Bench Wildfire Risk Reduction 2025-2030
Jasper National Park -
Parks Canada Agency Pyramid Bench Fire Guard Prescribed Burn
Jasper National Park of Canada -
Pine Bungalows Master Plan 2021
Jasper National Park -
Parks Canada Agency - Trail 8c Re-route in Jasper National Park
Jasper National Park -
Parks Canada Agency Connaught East Waterway Restructure
Jasper National Park -
Jasper Park Lodge Maintenance and Golf Maintenance Compounds, General Manager's Cabin & Superintendent's Cabin Rebuild - Post-Wildfire
Jasper National Park -
Jasper House Bungalows Wildfire Rebuild Master Plan
Jasper National Park of Canada -
Jasper House Bungalows Master Plan
Jasper National Park -
Anticipatory Proposed Site Development for Municipality of Jasper Interim Housing Outside Townsite
Jasper National Park -
Trail 1a Jasper National Park
Jasper National Park -
Parks Canada Agency Whistlerville Housing Rebuild and Utilities to Marmot Meadows
Jasper National Park -
JTA - Hochimini Trail Realignment
Jasper National Park -
Parks Canada Agency Douglas Fir Slopes Prescribed Burn
Jasper National Park -
Parks Canada Agency Highway Operations Unit Marmot Pit Expansion-Winter Abrasives
Jasper National Park -
Parks Canada Agency Highway Operations Unit Marmot Pit Expansion-Winter Abrasives
Jasper National Park -
Trans Mountain Miette River Encroachment 2 (KP386.75)
Jasper National Park of Canada -
Parks Canada Agency Valley of the Five Lakes Trail Restoration
Jasper National Park of Canada -
Trans Mountain Pipeline Site KP387 Bioremediation
Jasper National Park of Canada -
Trail 8c Realignment
Jasper National Park of Canada -
Trans Mountain Fibre Gaps Project
Jasper National Park -
Caribou Conservation Breeding and Augmentation Project in Jasper National Park
Jasper National Park, Detailed Impact Assessment -
Parks Canada Agency Backcountry Meadows Prescribed Burn
Jasper National Park -
Jacques Lake Realignment
Jasper National Park of Canada -
Marmot Basin Knob Chair Lift Line Replacement
Jasper National Park of Canada -
Marmot Basin Knob Area Avalanche Berm
Jasper National Park of Canada -
Parks Canada 8-Mile Pit Expansion and Aggregate Extraction
Jasper National Park -
Parks Canada Agency Snaring River Bridge Rehabilitation
Jasper National Park of Canada -
Trans Mountain Derr Creek Bridge Replacement
Jasper National Park of Canada -
Trans-Mountains KP400.2 Derr Creek - TMPL 24" Depth of Cover and Bank Protection Mitigation
Jasper National Park -
Trans Mountain Miette River Bridge Replacement
Jasper National Park -
Trans Mountain Miette River Encroachment Site 6
Jasper National Park of Canada -
Trans Mountain Pipeline ULC KP404 Integrity Dig
Jasper National Park of Canada -
Evelyn Creek trail re-adoption into official trail network
Jasper National Park -
Pyramid Bench Wildfire Risk Reduction
Jasper National Park of Canada -
Pyramid Lake Resort Wastewater Treatment Plant and Disposal System
Jasper National Park -
ATCO Miette 5L215 Rebuild
Jasper National Park -
Parks Canada Agency Miette Road Rehabilitation - Part B - Washout
Jasper National Park -
Miette Road Rehabilitation - Part C - Morris Creek Culvert Replacement
Jasper National Park of Canada -
Depth of Cover Mitigation at four sites on the 114.3 mm Jasper Transmission Pipeline in Proximity to the Fiddle River
Jasper National Park -
Parks Canada Agency Prescribed Burns- Southesk, Talbot Lake
Jasper National Park -
Coalspur Vista Coal Mine Phase II Expansion Project
3.5 kilometres east of Hinton -
Vista Coal Mine Phase II Expansion Project
Hinton -
Vista Coal Underground Mine Project and Vista Mine Phase II Expansion Project
10 kilometres east of Hinton -
Trans Mountain Pipeline Fiddle River Hazard Remediation
Jasper National Park -
Parks Canada Agency Brazeau Lake Bridge Replacement
Jasper National Park of Canada -
Robb Trend Coal Mine Expansion Project
Robb -
Pursuit - Columbia Icefield Discovery Centre - Wastewater Treatment System and Building Replacement
Jasper National Park -
Pursuit - Columbia Icefield Adventure Tour Road Maintenance Program
Jasper National Park of Canada -
Highway 93 N 2020 Rip Rap Sourcing Program
Banff National Park -
Alexandra Patrol Cabin Demolition and Removal
Banff National Park -
Cascade Power Plant Project
Yellowhead County -
Rampart Creek Culvert Replacement
Banff National Park of Canada -
Highway 947 Extension Project
Edson -
Big Horn Reserve Water System
Big Horn Reserve No. 144A -
Stoney Big Horn Fire Hall
Big Horn Reserve -
Stoney Big Horn AORHS and Health Center Project
Stoney Nakoda Nation -
Ruddock Creek Mine Project
Avola -
New Fibre Installation
Big Horn 144A - site 1(BH-POP) -
New Fibre Installation
Big Horn 144A - site 2(BH-FSA) -
Stoney Nation Big Horn Wastewater System
Big Horn No. 144A -
Summit Mine 14 Project
Grande Cache -
Owen Creek Warden Cabin Decommissioning
Banff National Park -
Edson Mainline Expansion Project
Drayton Valley -
Water Survey Canade Silverhorn Water Meter Station
Banff National Park -
Edson Mainline Expansion Project
Drayton Valley -
Lodge at Bow Lake Staff Accommodation, Dining Tent, and Parking Lot
Banff National Park of Canada -
Wildfire Risk Reduction Project 2023-2026- FireSmart work at several facilities in the Lake Louise, Yoho, and Kootenay Field Unit
Banff National Park of Canada -
Highway 947 Extension Project
-
Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1
Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1 -
O'Chiese Culvert 2 Replacement Project
O'Chiese First Nation -
RW-4853 oil and gas pipeline O'Chiese IR203
RW-4853 oil and gas pipeline O'Chiese IR203 -
OS-7256 oil and gas surface lease O'Chiese IR203
OS-7256 oil and gas surface lease O'Chiese IR203 -
Hazard Spruce Tree Removal
Glacier National Park -
Harper Creek Mine Project
Vavenby -
Proposed Pipeline from 15-27 to 09-28-044-10W5M in O'Chiese Indian Reserve No. 203
Proposed Pipeline from 15-27 to 09-28-044-10W5M in O'Chiese Indian Reserve No. 203 -
New Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1
New Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1 -
O'Chiese Culvert 1 Replacement Project
O'Chiese First Nation -
Proposed Wellsite Expansion within 15-27-044-10W5M and associated Borrow Pit in O'Chiese First Nation Reserve
O'Chiese First Nation Reserve No. 203 -
O'Chiese Culvert 3 Replacement Project
O'Chiese First Nation -
Sunchild First Nation Child and Family Services Temporary Emergency Placement Home and Offices
Sunchild First Nation -
Proposed Pipeline from 03-15 to14-10-043-10W5 located in Sunchild Indian Reserve No. 202
Sunchild First Nation Reserve #202 -
Sunchild 202 Reserve oil and gas development OS-7243
Sunchild Reserve 202 -
Margaret Creek Fish Barrier Creation
Banff National Park -
Sunchild Culvert 2 Replacement Project
Sunchild First Nation -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve 203 -
Sunchild Gas Distribution Line
Sunchild -
Sunchild First Nation: Community Wastewater Lagoon and Access Road
Sunchild First Nation -
Sunchild First Nation: Community Roads, Residences, and Service Infrastructure Buildout
Sunchild First Nation -
Sunchild Indian Reserve Pipeline
Sunchild Indian Reserve -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve -
Emerald Lake Lodge Water Permit
Yoho National Park of Canada -
Sunchild First Nation Package Water Treatment Plant
Sunchild First Nation -
O'Chiese First Nation
O'Chiese First Nation -
O'Chiese First Nation Education Way North End Subdivision
O'Chiese First Nation -
Sunchild Culvert 1 Replacement Project
Sunchild First Nation -
O'Chiese Indian Reserve 203
O'Chiese Indian Reserve 203 -
O'Chiese First Nation Former Landfills Closure and Remediation Plan
O'Chiese First Nation -
O'Chiese First Nation Powwow Arbor Replacement
O'Chiese First Nation -
Proposed Pipeline from 11-06 to 03-02-043-10W5M in Sunchild First Nation Reserve
Sunchild First Nation Reserve #202 -
Proposed Wellsite Expansion within 11-06-043-09W5M and associated Borrow Pit in Sunchild Indian Reserve
Sunchild Reserve -
OS-7255 Authorization to Construct and Operate a Surface Lease for a Borrow Pit, a multi-well pad and log deck.
Alexander First Nation 134A -
RW-4852 and OS-7246 Authorization to Construct and Operate a Right of Way for a natural gas Pipeline and associated riser
Alexander First Nation -
OS-5844 oil and gas well site Sunchild IR202
OS-5844 Sunchild IR 202 -
Emerald Canoes Dock Replacement
Yoho National Park of Canada -
O'Chiese First Nation (OCFN) - Baptiste River Bridge Replacement
O'Chiese No. 203 IR -
Yellowhead Copper Project
150 kilometres northeast of Kamloops -
Edson Mainline Expansion Project
Rocky Mountain House -
NOVA Gas Transmission Ltd. - 2021 NGTL System Expansion Project
Grande Prairie -
Parks Canada Staff Accommodation 210 Stephen Avenue, Field, BC.
Yoho National Park of Canada -
Wildfire Risk Reduction Maintenance Activities - Yoho, Kootenay, and Banff National Parks (2023-2034)
Yoho National Park of Canada -
New Fibre Installation
Cassimayooks (Mayook) 5, Tobacco Plains 2, Yoho National Park Of Canada - Site 5 -
Mt. Stephen Trail Reroute
Yoho National Park of Canada -
CP Rail Mountain Subdivision, Mile 3.8 Boulder Creek Bridge Rehab and Bedload Removal
Yoko National Park -
Great Divide Lodge Contaminated Site Remediation
Yoho National Park of Canada -
BC Hydro Field Energy Storage Facility Temporary Generator
Yoko National Park