Evelyn Creek trail re-adoption into official trail network
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The project consists of reconstructing the Evelyn Creek trail to be re-adopted into the official trail network in Jasper National Park. The Evelyn Creek trail is an old road (double tracked) and was trackset for cross-country skiing in the 1990s. It was an official trail until 2010, but was removed from the official trail network in order to reduce maintenance costs. The Evelyn Creek trail is 2.1 km long and approximately 5 m wide and will provide a connection between the Bald Hills trail and the Skyline (See attached). It will be a hiking trail only and no horses and bikes will be permitted. Work will be conducted after the Bird Nesting Period and proposed work includes transport of materials using quad or truck to get to start of trail on Bald Hills fire road, Use of chainsaw and brush cutter, clearing of deadfall, brushing of shrubs that may have grown in on the trail tread as required, rehabilitation of all disturbed areas at trail edges, installation of directional signs at both ends of the trail, and maintenance of trail conditions as necessary. The project footprint corresponds to the width of the existing trail and no new trail clearing is required. This work will be completed by Trail crew and Visitor Experience staff.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 1 | New Project Being Assessed by Parks Canada - Public Comments Invited 9 July to 8 August, 2020 | - | July 9, 2020 |
Contacts
Jasper National ParkBox 10
Jasper, Alberta T0E 1E0
Telephone: 780-852-6141
Email: evaluationdimpactjasper-jasperimpactassessment@pc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Jasper National Park (Alberta)
-
Nature of Activity
- Recreation and Tourism
-
Assessment Status
In progress -
Start Date
2020-07-09 -
Proponent
Parks Canada -
Authorities
- Parks Canada Agency
-
Assessment Type
Project on federal lands -
Reference Number
80829
Nearby assessments
...within 200 kilometres-
Parks Canada 8-Mile Pit Expansion and Aggregate Extraction
Jasper National Park -
Parks Canada Agency Backcountry Meadows Prescribed Burn
Jasper National Park -
Caribou Conservation Breeding and Augmentation Project in Jasper National Park
Jasper National Park, Detailed Impact Assessment -
Trans Mountain Fibre Gaps Project
Jasper National Park -
Parks Canada Agency Valley of the Five Lakes Trail Restoration
Jasper National Park of Canada -
Jacques Lake Realignment
Jasper National Park of Canada -
Parks Canada Agency Highway Operations Unit Marmot Pit Expansion-Winter Abrasives
Jasper National Park -
Parks Canada Agency Highway Operations Unit Marmot Pit Expansion-Winter Abrasives
Jasper National Park -
Trail 8c Realignment
Jasper National Park of Canada -
Trail 1a Jasper National Park
Jasper National Park -
Parks Canada Agency Douglas Fir Slopes Prescribed Burn
Jasper National Park -
Parks Canada Agency Whistlerville Housing Rebuild and Utilities to Marmot Meadows
Jasper National Park -
Anticipatory Proposed Site Development for Municipality of Jasper Interim Housing Outside Townsite
Jasper National Park -
Jasper House Bungalows Master Plan
Jasper National Park -
Jasper House Bungalows Wildfire Rebuild Master Plan
Jasper National Park of Canada -
Marmot Basin Knob Chair Lift Line Replacement
Jasper National Park of Canada -
Tekarra Lodge Wildfire Rebuild
Jasper National Park of Canada -
Jasper Park Lodge Maintenance and Golf Maintenance Compounds, General Manager's Cabin & Superintendent's Cabin Rebuild - Post-Wildfire
Jasper National Park -
Marmot Basin Knob Area Avalanche Berm
Jasper National Park of Canada -
Petro Canada Wildfire Rebuild
Jasper National Park of Canada -
Redevelopment of 702 Connaught Drive - 7-Eleven Convenience Store and Gas Bar
Jasper National Park of Canada -
Trans Mountain Corporation Sleepy Hollow Line Replacement
Jasper National Park -
Pine Bungalows Master Plan 2021
Jasper National Park -
Parks Canada Agency Connaught East Waterway Restructure
Jasper National Park -
ATCO Electric - Pyramid Bench Underground Conversion
Jasper National Park -
Biocontrol of Linaria dalmatica (Dalmatian Toadflax) using the agent Mecinus janthiniformis (Stem-boring weevil) in Jasper National Park
Jasper National Park of Canada -
Pyramid Lake Resort Wastewater Treatment Plant and Disposal System
Jasper National Park -
Parks Canada Agency Pyramid Bench Fire Guard Prescribed Burn
Jasper National Park of Canada -
Parks Canada Pyramid Bench Wildfire Risk Reduction 2025-2030
Jasper National Park -
Parks Canada Agency - Trail 8c Re-route in Jasper National Park
Jasper National Park -
JTA - Hochimini Trail Realignment
Jasper National Park -
Pyramid Bench Wildfire Risk Reduction
Jasper National Park of Canada -
Trans Mountain Miette River Encroachment 1.25
Jasper National Park of Canada -
Trans Mountain Miette River Encroachment 2 (KP386.75)
Jasper National Park of Canada -
Trans Mountain Pipeline Site KP387 Bioremediation
Jasper National Park of Canada -
Parks Canada Agency Snaring River Bridge Rehabilitation
Jasper National Park of Canada -
Parks Canada Agency Prescribed Burns- Southesk, Talbot Lake
Jasper National Park -
Depth of Cover Mitigation at four sites on the 114.3 mm Jasper Transmission Pipeline in Proximity to the Fiddle River
Jasper National Park -
ATCO Miette 5L215 Rebuild
Jasper National Park -
Trans Mountain Derr Creek Bridge Replacement
Jasper National Park of Canada -
Trans-Mountains KP400.2 Derr Creek - TMPL 24" Depth of Cover and Bank Protection Mitigation
Jasper National Park -
Trans Mountain Miette River Bridge Replacement
Jasper National Park -
Miette Road Rehabilitation - Part C - Morris Creek Culvert Replacement
Jasper National Park of Canada -
Parks Canada Agency Miette Road Rehabilitation - Part B - Washout
Jasper National Park -
Trans Mountain Miette River Encroachment Site 6
Jasper National Park of Canada -
Trans Mountain Pipeline ULC KP404 Integrity Dig
Jasper National Park of Canada -
Trans Mountain Miette River Encroachment 6.5
Jasper National Park of Canada -
Parks Canada Agency Brazeau Lake Bridge Replacement
Jasper National Park of Canada -
Pursuit - Columbia Icefield Discovery Centre - Wastewater Treatment System and Building Replacement
Jasper National Park -
Pursuit Miette Mountain Cabins Redevelopment
Jasper National Park -
Pursuit - Columbia Icefield Adventure Tour Road Maintenance Program
Jasper National Park of Canada -
Robb Trend Coal Mine Expansion Project
Robb -
Highway 93 N 2020 Rip Rap Sourcing Program
Banff National Park -
Vista Coal Mine Phase II Expansion Project
Hinton -
Vista Coal Underground Mine Project and Vista Mine Phase II Expansion Project
10 kilometres east of Hinton -
Coalspur Vista Coal Mine Phase II Expansion Project
3.5 kilometres east of Hinton -
Alexandra Patrol Cabin Demolition and Removal
Banff National Park -
Trans Mountain Pipeline Fiddle River Hazard Remediation
Jasper National Park -
Rampart Creek Culvert Replacement
Banff National Park of Canada -
Stoney Big Horn Fire Hall
Big Horn Reserve -
Big Horn Reserve Water System
Big Horn Reserve No. 144A -
Stoney Big Horn AORHS and Health Center Project
Stoney Nakoda Nation -
New Fibre Installation
Big Horn 144A - site 1(BH-POP) -
New Fibre Installation
Big Horn 144A - site 2(BH-FSA) -
Stoney Nation Big Horn Wastewater System
Big Horn No. 144A -
Owen Creek Warden Cabin Decommissioning
Banff National Park -
Cascade Power Plant Project
Yellowhead County -
Highway 947 Extension Project
Edson -
Edson Mainline Expansion Project
Drayton Valley -
Water Survey Canade Silverhorn Water Meter Station
Banff National Park -
Edson Mainline Expansion Project
Drayton Valley -
Ruddock Creek Mine Project
Avola -
Lodge at Bow Lake Staff Accommodation, Dining Tent, and Parking Lot
Banff National Park of Canada -
Wildfire Risk Reduction Project 2023-2026- FireSmart work at several facilities in the Lake Louise, Yoho, and Kootenay Field Unit
Banff National Park of Canada -
O'Chiese Culvert 2 Replacement Project
O'Chiese First Nation -
Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1
Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1 -
OS-7256 oil and gas surface lease O'Chiese IR203
OS-7256 oil and gas surface lease O'Chiese IR203 -
RW-4853 oil and gas pipeline O'Chiese IR203
RW-4853 oil and gas pipeline O'Chiese IR203 -
Proposed Pipeline from 15-27 to 09-28-044-10W5M in O'Chiese Indian Reserve No. 203
Proposed Pipeline from 15-27 to 09-28-044-10W5M in O'Chiese Indian Reserve No. 203 -
Sunchild First Nation Child and Family Services Temporary Emergency Placement Home and Offices
Sunchild First Nation -
Margaret Creek Fish Barrier Creation
Banff National Park -
Proposed Pipeline from 03-15 to14-10-043-10W5 located in Sunchild Indian Reserve No. 202
Sunchild First Nation Reserve #202 -
O'Chiese Culvert 1 Replacement Project
O'Chiese First Nation -
Proposed Wellsite Expansion within 15-27-044-10W5M and associated Borrow Pit in O'Chiese First Nation Reserve
O'Chiese First Nation Reserve No. 203 -
O'Chiese Culvert 3 Replacement Project
O'Chiese First Nation -
Sunchild 202 Reserve oil and gas development OS-7243
Sunchild Reserve 202 -
Sunchild Culvert 2 Replacement Project
Sunchild First Nation -
Sunchild First Nation: Community Wastewater Lagoon and Access Road
Sunchild First Nation -
Sunchild First Nation: Community Roads, Residences, and Service Infrastructure Buildout
Sunchild First Nation -
Sunchild Gas Distribution Line
Sunchild -
Sunchild Indian Reserve Pipeline
Sunchild Indian Reserve -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve 203 -
Emerald Lake Lodge Water Permit
Yoho National Park of Canada -
Sunchild First Nation Package Water Treatment Plant
Sunchild First Nation -
Hazard Spruce Tree Removal
Glacier National Park -
O'Chiese First Nation New School Road Culvert Replacements and Installation Project
O’Chiese First Nation -
O'Chiese First Nation
O'Chiese First Nation -
Sunchild Culvert 1 Replacement Project
Sunchild First Nation -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve -
O'Chiese First Nation Former Landfills Closure and Remediation Plan
O'Chiese First Nation -
O'Chiese First Nation Powwow Arbor Replacement
O'Chiese First Nation -
O'Chiese First Nation Education Way North End Subdivision
O'Chiese First Nation -
Proposed Pipeline from 11-06 to 03-02-043-10W5M in Sunchild First Nation Reserve
Sunchild First Nation Reserve #202 -
Summit Mine 14 Project
Grande Cache -
Proposed Wellsite Expansion within 11-06-043-09W5M and associated Borrow Pit in Sunchild Indian Reserve
Sunchild Reserve -
O'Chiese Indian Reserve 203
O'Chiese Indian Reserve 203 -
New Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1
New Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1 -
OS-5844 oil and gas well site Sunchild IR202
OS-5844 Sunchild IR 202 -
Emerald Canoes Dock Replacement
Yoho National Park of Canada -
O'Chiese First Nation (OCFN) - Baptiste River Bridge Replacement
O'Chiese No. 203 IR -
Edson Mainline Expansion Project
Rocky Mountain House -
NOVA Gas Transmission Ltd. - 2021 NGTL System Expansion Project
Grande Prairie -
Parks Canada Staff Accommodation 210 Stephen Avenue, Field, BC.
Yoho National Park of Canada -
Wildfire Risk Reduction Maintenance Activities - Yoho, Kootenay, and Banff National Parks (2023-2034)
Yoho National Park of Canada -
New Fibre Installation
Cassimayooks (Mayook) 5, Tobacco Plains 2, Yoho National Park Of Canada - Site 5 -
Mt. Stephen Trail Reroute
Yoho National Park of Canada -
Great Divide Lodge Contaminated Site Remediation
Yoho National Park of Canada -
CP Rail Mountain Subdivision, Mile 3.8 Boulder Creek Bridge Rehab and Bedload Removal
Yoko National Park -
BC Hydro Field Energy Storage Facility Temporary Generator
Yoko National Park -
Ross Lake Fire Guard
Yoho National Park of Canada -
Highway 947 Extension Project
-
Skoki Lodge Outhouse Replacement
Banff National Park of Canada -
Lake Louise Community Fire Guard
Banff National Park -
Fairmont Chateau Lake Louise Pool Demolition
Banff National Park -
Fairmont Chateau Lake Louise Cooling Unit Installation
Banff National Park -
Lake Louise Heliport
Kootenay/Yoho/Lake Louise National Parks -
Chateau Lake Louise New Parking Lot Construction
Banff National Park of Canada -
Fairmont Chateau Lake Louise Water Permit Renewal
Banff National Park of Canada -
Hostelling International Staff Accommodation
Banff National Park of Canada -
Chateau Lake Louise Pool Rebuild
Banff National Park -
Lake Louise Inn Generator and Exit Stairs
Banff National Park -
Village of Lake Louise Utilities Selected System Upgrades
Banff National Park -
Deer Lodge Redevelopment
Banff National Park -
Fortis Line Rebuild at Lake Louise Ski Area
Banff National Park -
PCA Clearwater Prescribe Burn
Banff National Park of Canada -
Louise Creek Bank Stabilization
Banff National Park of Canada -
Lake Louise Inn Staff Accommodation
Banff National Park of Canada -
Deer Lodge Staff Accommodation
Banff National Park of Canada -
Lake Louise Ski Area Village Road Staff Accommodation
Banff National Park of Canada -
Lake Louise Ski Area Hector Road Accommodation
Banff National Park of Canada -
Moraine Lake Lodge Staff Accommodation
Banff National Park -
Mountaineer Lodge Staff Accommodation - 221 Hector Road
Banff National Park -
Lake Louise Drive Upgrades - Phase 2
Banff National Park of Canada -
Abbot Pass Refuge Cabin National Historic Site Removal
Yoko National Park, Detailed Impact Assessment -
Ya Ha Tinda Ranch Solar Array
Banff National Park -
Parks Canada Agency Ya Ha Tinda Ranch Staff Housing and Utility Upgrade
Banff National Park of Canada -
Parks Canada Repeater installation on North Shoulder of Lipalian Mountain
Parks Canada Repeater installation on North Shoulder of Lipalian Mountain -
Mount Revelstoke Telemetry Tower
Mount Revelstoke National Park of Canada -
Moraine Lake Lodge Duplex Cabins
Banff National Park -
Harper Creek Mine Project
Vavenby -
Small-scale habitat enhancement for bears near Lake Louise, Alberta
Banff National Park -
Parks Canada Rocky Mountain House National Historic Site Fiber communication installation 2025
Rocky Mountain House National Historic Site -
OS-7255 Authorization to Construct and Operate a Surface Lease for a Borrow Pit, a multi-well pad and log deck.
Alexander First Nation 134A -
RW-4852 and OS-7246 Authorization to Construct and Operate a Right of Way for a natural gas Pipeline and associated riser
Alexander First Nation -
Fortis Line Install at CP Mile 108
Banff National Park -
Yoho Administration Building Parking Lot Expansion
Yoho National Park -
Protection Mountain Fire Guard
Banff National Park -
Snowforest Campground Upgrades
Mount Revelstoke National Park of Canada -
Badger Lake Non-Native Trout Removal
Banff National Park -
Parking Lot repave
301 3rd Street West, Revelstoke -
Lake Louise Fire Hall and Multi-Unit Residential Development
Banff National Park of Canada -
Yellowhead Copper Project
150 kilometres northeast of Kamloops