Trans Mountain Pipeline Site KP387 Bioremediation
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
During a reactivation dig in 2021, historical petroleum hydrocarbon contamination was discovered at a site on the Trans Mountain pipeline right of way (RoW) located 8 km west of Jasper and next to the Miette River. Further assessment delineated contamination along the right of way and adjacent wetland, fen and marsh. The Remedial Action Plan recommends in-situ bioremediation as the best option to reduce contaminants to acceptable levels in both soil and groundwater, while minimizing further impacts to the area. Bioremediation involves using microbes to naturally degrade hydrocarbons, turning them into H2O and CO2. The proposed bioremediation method involves adding microbes to the site that resemble the local microbial populations.
Trans Mountain proposes to begin the microbial treatment in May 2024, and possibly re-apply in October 2024. The treatment will be applied by digging shallow hand auger holes to 1.0 – 2.5 m below surface and injecting the microbes into the subsurface. Post injection of the microbial treatment, site monitoring of soil and groundwater will occur for two years to verify performance of the microbial treatment.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Parks Canada has issued a notice of determination and decided that the project is not likely to cause significant adverse environmental effects | - | July 21, 2024 |
| 1 | New project being assessed by Parks Canada - Public comments invited from April 17 to May 17, 2024 | - | April 17, 2024 |
Contacts
Jasper National ParkBox 10
Jasper, Alberta T0E 1E0
Telephone: 780-852-6141
Email: evaluationdimpactjasper-jasperimpactassessment@pc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Jasper National Park of Canada (Alberta)
-
Nature of Activity
- Remediation and conservation
-
Assessment Status
Completed -
Start Date
2024-04-17 -
Proponent
External Proponent -
Authorities
- Parks Canada Agency
-
Assessment Type
Project on federal lands -
Reference Number
88500
Nearby assessments
...within 200 kilometres-
Trans Mountain Miette River Encroachment 2 (KP386.75)
Jasper National Park of Canada -
Trans Mountain Miette River Encroachment 1.25
Jasper National Park of Canada -
Biocontrol of Linaria dalmatica (Dalmatian Toadflax) using the agent Mecinus janthiniformis (Stem-boring weevil) in Jasper National Park
Jasper National Park of Canada -
Parks Canada Agency - Trail 8c Re-route in Jasper National Park
Jasper National Park -
Parks Canada Pyramid Bench Wildfire Risk Reduction 2025-2030
Jasper National Park -
Trans Mountain Corporation Sleepy Hollow Line Replacement
Jasper National Park -
Petro Canada Wildfire Rebuild
Jasper National Park of Canada -
Redevelopment of 702 Connaught Drive - 7-Eleven Convenience Store and Gas Bar
Jasper National Park of Canada -
ATCO Electric - Pyramid Bench Underground Conversion
Jasper National Park -
Parks Canada Agency Pyramid Bench Fire Guard Prescribed Burn
Jasper National Park of Canada -
JTA - Hochimini Trail Realignment
Jasper National Park -
Tekarra Lodge Wildfire Rebuild
Jasper National Park of Canada -
Jasper House Bungalows Wildfire Rebuild Master Plan
Jasper National Park of Canada -
Jasper House Bungalows Master Plan
Jasper National Park -
Anticipatory Proposed Site Development for Municipality of Jasper Interim Housing Outside Townsite
Jasper National Park -
Parks Canada Agency Whistlerville Housing Rebuild and Utilities to Marmot Meadows
Jasper National Park -
Parks Canada Agency Connaught East Waterway Restructure
Jasper National Park -
Marmot Basin Knob Area Avalanche Berm
Jasper National Park of Canada -
Pine Bungalows Master Plan 2021
Jasper National Park -
Marmot Basin Knob Chair Lift Line Replacement
Jasper National Park of Canada -
Jasper Park Lodge Maintenance and Golf Maintenance Compounds, General Manager's Cabin & Superintendent's Cabin Rebuild - Post-Wildfire
Jasper National Park -
Trail 1a Jasper National Park
Jasper National Park -
Trans Mountain Derr Creek Bridge Replacement
Jasper National Park of Canada -
Parks Canada Agency Highway Operations Unit Marmot Pit Expansion-Winter Abrasives
Jasper National Park -
Parks Canada Agency Highway Operations Unit Marmot Pit Expansion-Winter Abrasives
Jasper National Park -
Trans-Mountains KP400.2 Derr Creek - TMPL 24" Depth of Cover and Bank Protection Mitigation
Jasper National Park -
Trans Mountain Miette River Bridge Replacement
Jasper National Park -
Parks Canada Agency Douglas Fir Slopes Prescribed Burn
Jasper National Park -
Parks Canada Agency Valley of the Five Lakes Trail Restoration
Jasper National Park of Canada -
Trans Mountain Miette River Encroachment Site 6
Jasper National Park of Canada -
Trans Mountain Pipeline ULC KP404 Integrity Dig
Jasper National Park of Canada -
Trans Mountain Miette River Encroachment 6.5
Jasper National Park of Canada -
Parks Canada 8-Mile Pit Expansion and Aggregate Extraction
Jasper National Park -
Trail 8c Realignment
Jasper National Park of Canada -
Trans Mountain Fibre Gaps Project
Jasper National Park -
Caribou Conservation Breeding and Augmentation Project in Jasper National Park
Jasper National Park, Detailed Impact Assessment -
Parks Canada Agency Backcountry Meadows Prescribed Burn
Jasper National Park -
Jacques Lake Realignment
Jasper National Park of Canada -
Parks Canada Agency Snaring River Bridge Rehabilitation
Jasper National Park of Canada -
Pyramid Bench Wildfire Risk Reduction
Jasper National Park of Canada -
Pyramid Lake Resort Wastewater Treatment Plant and Disposal System
Jasper National Park -
Evelyn Creek trail re-adoption into official trail network
Jasper National Park -
Parks Canada Agency Miette Road Rehabilitation - Part B - Washout
Jasper National Park -
ATCO Miette 5L215 Rebuild
Jasper National Park -
Miette Road Rehabilitation - Part C - Morris Creek Culvert Replacement
Jasper National Park of Canada -
Pursuit Miette Mountain Cabins Redevelopment
Jasper National Park -
Depth of Cover Mitigation at four sites on the 114.3 mm Jasper Transmission Pipeline in Proximity to the Fiddle River
Jasper National Park -
Parks Canada Agency Prescribed Burns- Southesk, Talbot Lake
Jasper National Park -
Coalspur Vista Coal Mine Phase II Expansion Project
3.5 kilometres east of Hinton -
Vista Coal Mine Phase II Expansion Project
Hinton -
Vista Coal Underground Mine Project and Vista Mine Phase II Expansion Project
10 kilometres east of Hinton -
Trans Mountain Pipeline Fiddle River Hazard Remediation
Jasper National Park -
Parks Canada Agency Brazeau Lake Bridge Replacement
Jasper National Park of Canada -
Pursuit - Columbia Icefield Discovery Centre - Wastewater Treatment System and Building Replacement
Jasper National Park -
Robb Trend Coal Mine Expansion Project
Robb -
Pursuit - Columbia Icefield Adventure Tour Road Maintenance Program
Jasper National Park of Canada -
Highway 93 N 2020 Rip Rap Sourcing Program
Banff National Park -
Alexandra Patrol Cabin Demolition and Removal
Banff National Park -
Rampart Creek Culvert Replacement
Banff National Park of Canada -
Cascade Power Plant Project
Yellowhead County -
Ruddock Creek Mine Project
Avola -
Summit Mine 14 Project
Grande Cache -
Highway 947 Extension Project
Edson -
Big Horn Reserve Water System
Big Horn Reserve No. 144A -
Stoney Big Horn Fire Hall
Big Horn Reserve -
Stoney Big Horn AORHS and Health Center Project
Stoney Nakoda Nation -
Owen Creek Warden Cabin Decommissioning
Banff National Park -
New Fibre Installation
Big Horn 144A - site 2(BH-FSA) -
New Fibre Installation
Big Horn 144A - site 1(BH-POP) -
Stoney Nation Big Horn Wastewater System
Big Horn No. 144A -
Edson Mainline Expansion Project
Drayton Valley -
Water Survey Canade Silverhorn Water Meter Station
Banff National Park -
Edson Mainline Expansion Project
Drayton Valley -
Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1
Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1 -
Harper Creek Mine Project
Vavenby -
Lodge at Bow Lake Staff Accommodation, Dining Tent, and Parking Lot
Banff National Park of Canada -
Wildfire Risk Reduction Project 2023-2026- FireSmart work at several facilities in the Lake Louise, Yoho, and Kootenay Field Unit
Banff National Park of Canada -
Highway 947 Extension Project
-
Hazard Spruce Tree Removal
Glacier National Park -
O'Chiese Culvert 2 Replacement Project
O'Chiese First Nation -
New Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1
New Rogers Communications Inc. Telecommunication Tower Project in Glacier National Park along Highway 1 -
Yellowhead Copper Project
150 kilometres northeast of Kamloops -
RW-4853 oil and gas pipeline O'Chiese IR203
RW-4853 oil and gas pipeline O'Chiese IR203 -
OS-7256 oil and gas surface lease O'Chiese IR203
OS-7256 oil and gas surface lease O'Chiese IR203 -
Margaret Creek Fish Barrier Creation
Banff National Park -
Proposed Pipeline from 15-27 to 09-28-044-10W5M in O'Chiese Indian Reserve No. 203
Proposed Pipeline from 15-27 to 09-28-044-10W5M in O'Chiese Indian Reserve No. 203 -
Emerald Lake Lodge Water Permit
Yoho National Park of Canada -
O'Chiese Culvert 1 Replacement Project
O'Chiese First Nation -
Proposed Wellsite Expansion within 15-27-044-10W5M and associated Borrow Pit in O'Chiese First Nation Reserve
O'Chiese First Nation Reserve No. 203 -
O'Chiese Culvert 3 Replacement Project
O'Chiese First Nation -
Sunchild First Nation Child and Family Services Temporary Emergency Placement Home and Offices
Sunchild First Nation -
Proposed Pipeline from 03-15 to14-10-043-10W5 located in Sunchild Indian Reserve No. 202
Sunchild First Nation Reserve #202 -
Sunchild 202 Reserve oil and gas development OS-7243
Sunchild Reserve 202 -
Sunchild Culvert 2 Replacement Project
Sunchild First Nation -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve 203 -
Sunchild Gas Distribution Line
Sunchild -
Sunchild First Nation: Community Roads, Residences, and Service Infrastructure Buildout
Sunchild First Nation -
Sunchild First Nation: Community Wastewater Lagoon and Access Road
Sunchild First Nation -
Sunchild Indian Reserve Pipeline
Sunchild Indian Reserve -
Emerald Canoes Dock Replacement
Yoho National Park of Canada -
O'Chiese First Nation New School Road Culvert Replacements and Installation Project
O’Chiese First Nation -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve -
Sunchild First Nation Package Water Treatment Plant
Sunchild First Nation -
OS-7255 Authorization to Construct and Operate a Surface Lease for a Borrow Pit, a multi-well pad and log deck.
Alexander First Nation 134A -
RW-4852 and OS-7246 Authorization to Construct and Operate a Right of Way for a natural gas Pipeline and associated riser
Alexander First Nation -
O'Chiese First Nation
O'Chiese First Nation -
O'Chiese First Nation Education Way North End Subdivision
O'Chiese First Nation -
Sunchild Culvert 1 Replacement Project
Sunchild First Nation -
O'Chiese First Nation Former Landfills Closure and Remediation Plan
O'Chiese First Nation -
O'Chiese Indian Reserve 203
O'Chiese Indian Reserve 203 -
O'Chiese First Nation Powwow Arbor Replacement
O'Chiese First Nation -
Proposed Pipeline from 11-06 to 03-02-043-10W5M in Sunchild First Nation Reserve
Sunchild First Nation Reserve #202 -
Proposed Wellsite Expansion within 11-06-043-09W5M and associated Borrow Pit in Sunchild Indian Reserve
Sunchild Reserve -
OS-5844 oil and gas well site Sunchild IR202
OS-5844 Sunchild IR 202