Alexander First Nation under CHRT 41 is building a new office building project, called the Mamawatoskewin Prevention Building. It will be a new two-storey building (CFS Centre) with no basement structure and with an approximate footprint of 1,500 m2. Additionally, there will be an unheated garage building with an approximate footprint of 500 m2, an outdoor gazebo, plaza area, and a firefighting pond measuring approximately 15 x 35 m and 3 m deep. Associated access roads and parking areas will also be constructed.
Latest update
Participate
Key documents
| Document Number | Document Title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination for the Alexander First Nation Mamawatoskewin Prevention Building | - | April 28, 2025 |
| 1 | Alexander First Nation Mamawatoskewin Prevention Building - Public Comments Invited | - | March 20, 2025 |
Contacts
Environmental Review Process Alberta RegionLands, Environment and Economic Development
630 Canada Place, 9700 Jasper Avenue
Edmonton, Alberta T5J 4G2
Email: paeab-erpab@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Alexander First Nation (Alberta)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
Completed -
Start Date
2025-03-20 -
Proponent
Alexander First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
89375
Nearby assessments
...within 200 kilometres-
Alexander Wastewater System Upgrades
Biofilter Wetland System -
Alexander Wastewater System Upgrades
Sewage Lagoon Rehab and Addition -
Alexander Public Works and Fire hall Building Project
Alexander First Nation -
Alexander Wastewater System Upgrades
East Lift Station -
Alexander Wastewater System Upgrades
West Lift Station -
Alexander First Nation Waste Transfer/Diversion Station Rehabilitation
Alexander First Nation -
Alexander First Nation: BF 77352 Replacement and Twp Rd 562 Improvements
Alexander First Nation -
Alexander First Nation - Big Hills Estate Subdivision
Big Hills Estate Subdivision -
Construct Land Vehicle Crew Training System Facility- 3rd Canadian Division Support Base Edmonton
3 Canadian Division Support Base (CDSB) Edmonton -
Construction of Canadian Forces Housing Agency (CFHA) Apartments, Row Houses, Duplexes, Access Roads and Site Services, 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base -
1 Combat Engineer Regiment (CER) Compound Expansion - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
Concept Design and Performance Specification for Edmonton Waveguide Bridge and Foundation Piers - 3rd Canadian Division Support Group, Edmonton
3rd Canadian Division Support Group, Edmonton -
Design and Construct Dry Gap Bridge Training Aide, Canadian Forces Base Edmonton
Canadian Forces Base Edmonton -
Design and Construct Armored Combat Support Vehicle (ACSV) Facility- 3rd Canadian Division Support Group, Edmonton
3rd Canadian Division Support Group, Edmonton -
Construct Transition Centre - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
Skate Park Expansion - 3rd Canadian Division Support Group, Edmonton
3rd Canadian Division Support Base Edmonton -
Repair Normandy Road - Canadian Forces Base Edmonton
Canadian Forces Base Edmonton -
Remediation of a Royal Canadian Mounted Police Property in Stony Plain, Alberta
Town of Stony Plain -
Enoch Cree Nation Housing Development Project
Enoch Cree Nation -
Replacement of the Carvel Weather Radar
1529 Parkland Hwy, Carvel, Alberta, T0E 0H0 -
Xplornet Telecommunications Tower Project
Alberta Beach -
ATCO Removal of 35m 42.2 mm Transmission Line on Enoch Cree Nation
Enoch Cree Nation -
ATCO Removal of 1 km of 42 mm Pipeline on Enoch Cree Nation Phase 2
Enoch Cree Nation -
Enoch Village Water and Wastewater Rehabilitation
Enoch Cree Nation -
Enoch Cree Nation mnn Childhood Family Services Administration Building Project
Enoch Cree Nation -
Enoch Cree Nation 2 Unit Housing Project
Enoch Cree Nation -
Enoch Nation Embers Addition to River Cree Casino & Hotel
Enoch Cree Nation -
Enoch Phase 27 Housing Project 2020 (5 Units)
Enoch Cree Nation -
Enoch Cree Nation ATCO 1121399 Removal Phase 3 Project
Enoch Cree Nation -
Enoch River Cree Hotel Expansion
Enoch Cree Nation -
Enoch Cree Nation Wastewater System Upgrades
Enoch Cree Nation -
ATCO Gate Station Project
ATCO Gate Station -
ATCO Gas Main Installation for NEDA Commercial Stage 1, Millennium Phase 1, and Community Recovery Center
Enoch Cree Nation -
Enoch Cree Nation Medical Treatment Centre Project
Enoch Cree Nation -
RHI 20 Unit Subdivision
Enoch Cree Nation -
Parking Lot Resurfacing for the Entire Complex along with Line Painting at the RCMP K Division
Edmonton -
Enoch Cree Nation Traditional Lands Development Project
Enoch Cree Nation -
Enoch Recovery Center Project
Enoch Cree Nation -
Alexander First Nation Campground Project
Alexander First Nation -
Waheeba Solar Energy Project
Alexis First Nation -
Trans Mountain Expansion Project
Edmonton -
Alexis Nakota Sioux Junior and Senior High School - Educational dock
Alexis Nakota Sioux Nation -
Rapid Housing Initiative 3 - Hill Plain
Alexis Nakota Sioux Nation -
Pasa Tibi Village Elder's Living Facility
Alexis Nakota Sioux Nation -
Alexander First Nation CU360 Drinking Water Supply Project
Alexander First Nation -
Alexis Gas Distribution to New Town Subdivision (30 Lots) Project
Alexis Nakota Sioux Nation -
Alexis Nakota Sioux Nation Youth Transitional House Project
Alexis Nakota Sioux Nation -
Paul First Nation 2-unit Housing Project
Paul First Nation -
Paul First Nation CFS Admin Building
Paul First Nation -
Paul First Nation Driveway Repairs Project
Paul First Nation -
Paul First Nation Gas Station Project
Paul First Nation -
Paul First Nation Culvert Replacement Project
Paul First Nation -
Potential Regional Assessment of a Western Energy Corridor from Alberta to Manitoba
Fort Saskatchewan -
Beacon AI Centers Heartland Project
Sturgeon County, about 7 kilometres east of Gibbons -
Cando Sturgeon Rail Terminal West Expansion Project
Sturgeon County -
Base Line Terminal Project
Edmonton -
Greenlight Electricity Centre Project
10 km east of Gibbons, Sturgeon County -
Cando Sturgeon Rail Terminal Project
Sturgeon County -
Sturgeon Petrochemical Rail Yard Project
Six kilometres north of Fort Saskatchewan -
Fort Saskatchewan Rail Facility Project
Fort Saskatchewan -
Redwater Facility Rail Yard Project
Near Redwater -
Heartland Petrochemical Complex Rail Yard Project
North of Fort Saskatchewan -
Josephburg Condensate Fractionation Project
22 kilometres northeast of Edmonton -
Paul First Nation Solar Project
Paul First Nation -
Paul First Nation Solar Energy Project Interconnection Line
Paul First Nation -
Enbridge Northern Gateway Project
Bruderheim -
Sundance 7 Generating Station Project
Wabamun -
Heartland Generating Station Project
Fort Saskatchewan, Bruderheim -
Value Chain Solutions - Heartland Complex Expansion Project
18 kilometres north east of Fort Saskatchewan -
ATCO Salt Cavern Storage Expansion Project
14 kilometres northeast of Fort Saskatchewan -
Strathcona Salt Cavern Storage Project
near Fort Saskatchewan -
NAV CANADA Navigation Tower Facilities Replacement Project located West of the Edmonton International Airport in Leduc County
NAV CANADA Navigation Tower Facilities Tower 2 -
NAV CANADA Navigation Tower Facilities Replacement Project located West of the Edmonton International Airport in Leduc County
NAV CANADA Navigation Tower Facilities Tower 1 -
NAV CANADA Navigation Tower Facilities Replacement Project located West of the Edmonton International Airport in Leduc County
NAV CANADA Navigation Tower Facilities Tower 3 -
NAV CANADA Navigation Tower Facilities Replacement Project located West of the Edmonton International Airport in Leduc County
NAV CANADA Navigation Tower Facilities Tower 4 -
GroHERE at Edmonton International Airport
Edmonton International Airport -
Airport Perimeter Road South Extension at Edmonton International Airport
Edmonton International Airport -
Cargo and Apron Development at Edmonton International Airport
Edmonton International Airport (Alberta) -
Alberta Zero Emissions Truck Electrification Collaboration Fueling Station
Edmonton International Airport -
Cargo and Apron Development at Edmonton International Airport
Edmonton International Airport -
Runway End Safety Areas at Edmonton International Airport
Edmonton International Airport -
Runway End Safety Areas at Edmonton International Airport
Edmonton International Airport -
Shell Service Station at Edmonton International Airport
Edmonton International Airport -
AIRPORT CITY SOLAR PROJECT at Edmonton International Airport
Edmonton International Airport -
International Cargo Hub Development at Edmonton International Airport
Edmonton International Airport -
Leduc County Fire Services (fire Station) at Edmonton International Airport
Edmonton International Airport -
Airside Pavement Repairs at Edmonton International Airport
Edmonton International Airport -
Taxiway B4 Pavement Rehabilitation at Edmonton International Airport
Edmonton International Airport -
Quick Park Improvements at Edmonton International Airport
Edmonton International Airport -
Groundside Roads Rehabilitation at Edmonton International Airport
Edmonton International Airport -
Construction and Rehabilitation to Existing Parking Lots, Parkade and Roadways at the Edmonton International Airport
Edmonton International Airport -
Groundside Roads Rehabilitation at Edmonton International Airport
Edmonton International Airport -
Reservoir 1 Gravel Road Construction and Parking Lot Regrading at Edmonton International Airport
Edmonton International Airport -
Value Park Pavement at the Edmonton International Airport
Edmonton Regional Airports Authority -
AirPoint 2 Development at the Edmonton International Airport
Edmonton International Airport -
North Tower Expansion at Edmonton International Airport
Edmonton International Airport -
Arrivals Level Pavement Repairs at Edmonton International Airport
Edmonton International Airport -
Sanitary Mainline, Manhole, Waterline and Valve Repairs and Replacement at Edmonton International Airport
Edmonton International Airport -
Cold Storage Facility Construction at Edmonton International Airport
Edmonton International Airport -
International Cargo Hub Development at Edmonton International Airport
Edmonton International Airport -
Reconstruct Asphalt Fitness Trails Phase 1 - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
Construct a new Mock Jump Tower training facility – Canadian Forces Base Edmonton
Canadian Forces Base Edmonton -
Enoch ATCO Plastic Mains Replacement Project
Enoch Cree Nation -
Culvert Replacement with Larger Diameter
Elk Island National Park -
Decoy Beaver Dam Pilot Project for Beaver Coexistence Management
Elk Island National Park of Canada -
Lamont Railcar Storage Project
Northwest of Lamont -
Bear and Moss Trails Restoration, Elk Island National Park
Elk Island National Park -
Pedestrian Bridge Replacement on Simmons Trail
Elk Island National Park -
Astotin Lake Dock Replacement
Elk Island National Park -
Culvert Clearing
Elk Island National Park -
Fortis Alberta Underground Powerline Installation
Elk Island National Park -
Alberta Transportation Culvert Installation on Highway 16 near Main Park Entrance EINP
Elk Island National Park -
Genesee Generating Station Expansion Project
Near Warburg -
Pigeon Lake Recreation Centre Water and Sewer Line Replacement Project
Pigeon Lake -
New Fibre Installation
Pigeon Lake 138A, Elk Island National Park -
Meanook National Wildlife Area Buildings Demolition
Meanook National Wildlife Area -
New (Single) Tower Construction & Upgrade (Single) Tower
project site 1: Louis Bull 138B -
Louis Bull Water Treatment Plant Upgrades
Louis Bull Tribe -
Louis Bull Kikinow Housing Project
Louis Bull Tribe -
Ermineskin Solar Project
Ermineskin Cree Nation No. 138 -
Louis Bull Tribe - 2020 Septic System Improvements
Louis Bull Tribe -
Louis Bull Tribe Water System Project/Water Treatment Plant and Reservoir
Louis Bull Tribe -
New (Single) Tower Construction & Upgrade (Single) Tower
project site 2: Ermineskin 138 -
Ermineskin Drainage Improvements (Culvert Replacement - Small Boy Road, Buffalo Avenue, 3 Mile Road) Project
Ermineskin Cree Nation -
Xplore Inc., external modification to existing radiocommunications tower on Ermineskin No. 138 reserve land, near Maskwacis, AB.
Xplore Inc., external modification to existing radiocommunications tower on Ermineskin No. 138 reserve land -
Ermineskin Waste Transfer Station
Ermineskin Cree Nation -
Ermineskin Sundancer Solar Project 2MWdc
Ermineskin Cree Nation -
RHI 3 - Samson Cree Nation
RHI 3 - Samson Cree Nation -
Ryley Biomedical Waste Incinerator Project
Ryley -
Samson Cree Nation Water Infrastructure Replacement
Samson Cree Nation -
Samson Menaik Road Commercial Development Project
Samson Cree Nation -
Samson Cree Nation Groundwater Well Improvement Project
Samson Cree Nation -
Samson Cree Nation 3 Mile Lagoon Drainage Improvements
Samson Cree Nation -
Ryley Facility Expansion Project
Ryley -
Samson Cree Nation Aboriginal Head Start on Reserve
Samson Cree Nation -
Montana First Nation Emergency Road Repairs
Montana First Nation -
Frog Lake First Nation Askiy Hemp Limited Partnership Project
Frog Lake First Nation -
Moraine Power Generation Project
Whitecourt -
Alexis Nakota Sioux Nation 1993 Spill Remediation Project
Alexis Nakota Sioux Nation -
New (Multiple) Tower Construction & New Fibre Installation
Project Site 2: Kikino Metis Settlement -
Application for Approval of the 2021 Pipeline Decommission Program
Alexis Nakota Sioux Nation Whitecourt (IR 32) Reserve Lands -
New (Multiple) Tower Construction & New Fibre Installation
Project Site 1: Kikino Metis Settlement -
Black Bear Power Plant Project
Swan Hills -
New (Multiple) Tower Construction & New Fibre Installation
Project Site 3: Kikino Metis Settlement -
RW-4853 oil and gas pipeline O'Chiese IR203
RW-4853 oil and gas pipeline O'Chiese IR203 -
Flipi Gas-Fired Generation Project
Approximately 18 km southwest of Rimbey -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve -
O'Chiese Indian Reserve 203
O'Chiese Indian Reserve 203 -
Saddle Lake Broadband and Cellular Connectivity Upgrade and Resilience Plan Project
Saddle Lake -
Saddle Lake 40 Acre Housing Project
Saddle Lake Cree Nation -
Saddle Lake Cree Nation Townsite Pumphouse Project
Townsite Pumphouse -
Saddle Lake Cree Nation Women's Shelter Project
Saddle Lake Cree Nation -
Pathway to Learning
Saddle Lake No. 125 -
Whitefish Lake First Nation #128 Waste Transfer Station
Whitefish Lake First Nation #128 -
Saddle Lake Cree Nation 9A Road Saddle Lake Creek Culvert Replacement Project
Saddle Lake Cree Nation -
Proposed Wellsite Expansion within 15-27-044-10W5M and associated Borrow Pit in O'Chiese First Nation Reserve
O'Chiese First Nation Reserve No. 203 -
O'Chiese First Nation Education Way North End Subdivision
O'Chiese First Nation -
O'Chiese Culvert 3 Replacement Project
O'Chiese First Nation -
O'Chiese Culvert 1 Replacement Project
O'Chiese First Nation -
Saddle Lake Gas Distribution System (Child Welfare Reunification Subdivision)
Saddle Lake Cree Nation -
Proposed Pipeline from 15-27 to 09-28-044-10W5M in O'Chiese Indian Reserve No. 203
Proposed Pipeline from 15-27 to 09-28-044-10W5M in O'Chiese Indian Reserve No. 203 -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve 203 -
Saddle Lake Cree Nation Road Rehabilitation
Saddle Lake #125 -
OS-7256 oil and gas surface lease O'Chiese IR203
OS-7256 oil and gas surface lease O'Chiese IR203 -
O'Chiese Culvert 2 Replacement Project
O'Chiese First Nation -
O'Chiese First Nation
O'Chiese First Nation -
O'Chiese First Nation Powwow Arbor Replacement
O'Chiese First Nation -
OS-5844 oil and gas well site Sunchild IR202
OS-5844 Sunchild IR 202 -
Sunchild Indian Reserve Pipeline
Sunchild Indian Reserve -
Sunchild Gas Distribution Line
Sunchild -
Sunchild 202 Reserve oil and gas development OS-7243
Sunchild Reserve 202 -
New Fibre Installation
Saddle Lake 125 -
O'Chiese First Nation Former Landfills Closure and Remediation Plan
O'Chiese First Nation -
Sunchild Culvert 1 Replacement Project
Sunchild First Nation -
O'Chiese First Nation (OCFN) - Baptiste River Bridge Replacement
O'Chiese No. 203 IR -
Proposed Wellsite Expansion within 11-06-043-09W5M and associated Borrow Pit in Sunchild Indian Reserve
Sunchild Reserve -
Proposed Pipeline from 11-06 to 03-02-043-10W5M in Sunchild First Nation Reserve
Sunchild First Nation Reserve #202 -
Sunchild First Nation Package Water Treatment Plant
Sunchild First Nation -
Proposed Pipeline from 03-15 to14-10-043-10W5 located in Sunchild Indian Reserve No. 202
Sunchild First Nation Reserve #202 -
Sunchild Culvert 2 Replacement Project
Sunchild First Nation -
Sunchild First Nation: Community Wastewater Lagoon and Access Road
Sunchild First Nation -
Sunchild First Nation: Community Roads, Residences, and Service Infrastructure Buildout
Sunchild First Nation -
Beaver Lake Cree Nation Medical Center
Beaver Lake Cree Nation -
Beaver Lake Cree Nation Water Treatment Plant
Beaver Lake Cree Nation -
Beaver Lake Cree First Nation Cardinal Drive Subdivision
Beaver Lake Cree Cardinal Drive Subdivision -
Beaver Lake Cree Nation New High School and Resource Centre
Beaver Lake Cree Nation -
Beaver Lake Cree Nation Fiber Optic Internet Infrastructure - Universal Broadband Fund Project
Beaver Lake Cree Nation -
Beaver Lake New School
Beaver Lake Cree Nation -
Beaver Lake Cenovus Housing Initiative - Build Out of 20 Residential Lots, Access Roads, and Water Distribution
Beaver Lake Cree Nation -
Saddle Lake Cree Nation: CU123 Whitefish Lake IR no. 128 Water System - Cistern Repairs & Replacements
Saddle Lake Cree Nation -
Edson Mainline Expansion Project
Drayton Valley -
Notice of Intent to Make a Determination - Start of Public Comment Period (TELUS Communications Inc (AB103721) Beaver Lake Indian Reserve No. 131 )
AB103721 - Beaver Lake Indian Reserve No. 131 -
Beaver Lake Cree Nation Telus Telecommunications Tower
Beaver Lake Cree Nation -
Construction of Two Bridge Files in Saddle Lake Cree Nation
Construction of Two Bridge Files in Saddle Lake Cree Nation -
Sunchild First Nation Child and Family Services Temporary Emergency Placement Home and Offices
Sunchild First Nation -
Saddle Lake Cree Nation: P047935 Child Welfare Reunification Infrastructure Project
Saddle Lake First Nation -
Bigstone Health Centre
Bigstone Cree Nation -
Storage Tank Decommissioning and Relocation at Multiple Locations - 3rd Canadian Division Support Base, Southern Alberta
Cormack Armoury - Red Deer -
Edson Mainline Expansion Project
Drayton Valley -
Sawridge Band Solar Farm Project
Sawridge Band -
New Fibre Installation
Project Site 2: Sawridge No. 150G -
New Fibre Installation
Project Site 1: Sawridge No. 150G -
New Fibre Installation - Slave Lake
Project Site 1: Slave Lake -
Parks Canada Rocky Mountain House National Historic Site Fiber communication installation 2025
Rocky Mountain House National Historic Site -
RW-4852 and OS-7246 Authorization to Construct and Operate a Right of Way for a natural gas Pipeline and associated riser
Alexander First Nation -
OS-7255 Authorization to Construct and Operate a Surface Lease for a Borrow Pit, a multi-well pad and log deck.
Alexander First Nation 134A -
New Fibre Installation - Slave Lake
Project Site 2: Slave Lake -
Sawridge First Nation - 2 Single Houses Project - 2025-2026
Sawridge First Nation -
Highway 947 Extension Project
Edson -
Cascade Power Plant Project
Yellowhead County -
Highway 947 Extension Project
-
Edson Mainline Expansion Project
Rocky Mountain House -
NOVA Gas Transmission Ltd. - 2021 NGTL System Expansion Project
Grande Prairie -
Clearwater Peat Harvesting Project
Caroline -
New Fibre Installation
Swan River 150E -
Swan River 32 Lot West Subdivision Project
Swan River First Nation -
Swan River First Nation Waste Diversion and Recycling Facility
Swan River First Nation -
Swan River First Nation: Wastewater Lagoon Liner Repair & Sub-liner Drainage Installation
Swan River First Nation -
Parking lot replacement at RCMP Detachment in Innisfail, Alberta
Innisfail -
Trench Removal and Site Restoration in C1 area at CFB Wainwright
The Range Training Area (RTA) at Detachment Wainwright -
Swan River First Nation Housing Project 2019 (5-Units)
Swan River First Nation