Paul First Nation Driveway Repairs Project
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Paul First Nation is planning to repair and upgrade 42 identified driveways impacted by poor drainage conditions resulting in impassable conditions following precipitation events and seasonal snowmelt. The use of geosynthetics or other stabilizing products may be implemented to stabilize and reduce the need for imported granular material. Driveways will be repaired to a "pre-damaged condition" and will require the stripping of existing materials, transportation of new materials to site, construction of driveways, and improvements to drainage. An additional 10 m on average on either side of the existing roadways may be cleared/graded to support construction activities. However, in some area, up to 30 m may be cleared to facilitate construction activities and other road improvement structures. Where possible, driveways will be constructed to 300 mm above the known high-water mark.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination for the Paul First Nation Driveway Repairs Project | - | March 12, 2025 |
| 1 | Paul First Nation Driveway Repairs Project - Public Comments Invited | - | January 30, 2025 |
Contacts
Environmental Review Program Alberta RegionLands, Environment and Economic Development
630 Canada Place - 9700 Jasper Ave
Edmonton, Alberta T5J 4G2
Email: paeab-erpab@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Paul First Nation (Alberta)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
Completed -
Start Date
2025-01-30 -
Proponent
Dillon Consulting Limited -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
89226
Nearby assessments
...within 200 kilometres-
Paul First Nation CFS Admin Building
Paul First Nation -
Paul First Nation Gas Station Project
Paul First Nation -
Paul First Nation Culvert Replacement Project
Paul First Nation -
Paul First Nation 2-unit Housing Project
Paul First Nation -
Paul First Nation Solar Project
Paul First Nation -
Paul First Nation Solar Energy Project Interconnection Line
Paul First Nation -
Sundance 7 Generating Station Project
Wabamun -
Replacement of the Carvel Weather Radar
1529 Parkland Hwy, Carvel, Alberta, T0E 0H0 -
Xplornet Telecommunications Tower Project
Alberta Beach -
Alexis Nakota Sioux Junior and Senior High School - Educational dock
Alexis Nakota Sioux Nation -
Rapid Housing Initiative 3 - Hill Plain
Alexis Nakota Sioux Nation -
Pasa Tibi Village Elder's Living Facility
Alexis Nakota Sioux Nation -
Alexander First Nation Campground Project
Alexander First Nation -
Alexis Nakota Sioux Nation Youth Transitional House Project
Alexis Nakota Sioux Nation -
Remediation of a Royal Canadian Mounted Police Property in Stony Plain, Alberta
Town of Stony Plain -
Alexis Gas Distribution to New Town Subdivision (30 Lots) Project
Alexis Nakota Sioux Nation -
Waheeba Solar Energy Project
Alexis First Nation -
Genesee Generating Station Expansion Project
Near Warburg -
Enoch Cree Nation mnn Childhood Family Services Administration Building Project
Enoch Cree Nation -
Enoch Village Water and Wastewater Rehabilitation
Enoch Cree Nation -
Enoch Phase 27 Housing Project 2020 (5 Units)
Enoch Cree Nation -
Enoch Cree Nation Wastewater System Upgrades
Enoch Cree Nation -
Enoch Cree Nation 2 Unit Housing Project
Enoch Cree Nation -
Alexander First Nation - Big Hills Estate Subdivision
Big Hills Estate Subdivision -
Enoch Cree Nation Traditional Lands Development Project
Enoch Cree Nation -
Alexander Wastewater System Upgrades
Sewage Lagoon Rehab and Addition -
Alexander Wastewater System Upgrades
Biofilter Wetland System -
Alexander Wastewater System Upgrades
West Lift Station -
Alexander Wastewater System Upgrades
East Lift Station -
Alexander Public Works and Fire hall Building Project
Alexander First Nation -
Enoch Cree Nation ATCO PMR Maskekoshihk Phases 7-9
Enoch Cree Nation -
Enoch Cree Nation Housing Development Project
Enoch Cree Nation -
RHI 20 Unit Subdivision
Enoch Cree Nation -
ATCO Removal of 35m 42.2 mm Transmission Line on Enoch Cree Nation
Enoch Cree Nation -
ATCO Removal of 1 km of 42 mm Pipeline on Enoch Cree Nation Phase 2
Enoch Cree Nation -
Enoch Recovery Center Project
Enoch Cree Nation -
Alexander First Nation: BF 77352 Replacement and Twp Rd 562 Improvements
Alexander First Nation -
ATCO Gas Main Installation for NEDA Commercial Stage 1, Millennium Phase 1, and Community Recovery Center
Enoch Cree Nation -
Enoch Nation Embers Addition to River Cree Casino & Hotel
Enoch Cree Nation -
Enoch River Cree Hotel Expansion
Enoch Cree Nation -
Alexander First Nation Mamawatoskewin Prevention Building
Alexander First Nation -
ATCO Gate Station Project
ATCO Gate Station -
Enoch Cree Nation Medical Treatment Centre Project
Enoch Cree Nation -
Enoch Cree Nation ATCO 1121399 Removal Phase 3 Project
Enoch Cree Nation -
Alexander First Nation Waste Transfer/Diversion Station Rehabilitation
Alexander First Nation -
Alexander First Nation CU360 Drinking Water Supply Project
Alexander First Nation -
NAV CANADA Navigation Tower Facilities Replacement Project located West of the Edmonton International Airport in Leduc County
NAV CANADA Navigation Tower Facilities Tower 2 -
NAV CANADA Navigation Tower Facilities Replacement Project located West of the Edmonton International Airport in Leduc County
NAV CANADA Navigation Tower Facilities Tower 3 -
NAV CANADA Navigation Tower Facilities Replacement Project located West of the Edmonton International Airport in Leduc County
NAV CANADA Navigation Tower Facilities Tower 1 -
NAV CANADA Navigation Tower Facilities Replacement Project located West of the Edmonton International Airport in Leduc County
NAV CANADA Navigation Tower Facilities Tower 4 -
AIRPORT CITY SOLAR PROJECT at Edmonton International Airport
Edmonton International Airport -
Parking Lot Resurfacing for the Entire Complex along with Line Painting at the RCMP K Division
Edmonton -
GroHERE at Edmonton International Airport
Edmonton International Airport -
Airport Perimeter Road South Extension at Edmonton International Airport
Edmonton International Airport -
Runway End Safety Areas at Edmonton International Airport
Edmonton International Airport -
Cargo and Apron Development at Edmonton International Airport
Edmonton International Airport -
Alberta Zero Emissions Truck Electrification Collaboration Fueling Station
Edmonton International Airport -
Cargo and Apron Development at Edmonton International Airport
Edmonton International Airport (Alberta) -
Runway End Safety Areas at Edmonton International Airport
Edmonton International Airport -
Trans Mountain Expansion Project
Edmonton -
New Hotel Development at Edmonton International Airport
Edmonton International Airport -
Taxiway B4 Pavement Rehabilitation at Edmonton International Airport
Edmonton International Airport -
Quick Park Improvements at Edmonton International Airport
Edmonton International Airport -
Sanitary Mainline, Manhole, Waterline and Valve Repairs and Replacement at Edmonton International Airport
Edmonton International Airport -
Groundside Roads Rehabilitation at Edmonton International Airport
Edmonton International Airport -
International Cargo Hub Development at Edmonton International Airport
Edmonton International Airport -
North Tower Expansion at Edmonton International Airport
Edmonton International Airport -
Arrivals Level Pavement Repairs at Edmonton International Airport
Edmonton International Airport -
Cold Storage Facility Construction at Edmonton International Airport
Edmonton International Airport -
Construction and Rehabilitation to Existing Parking Lots, Parkade and Roadways at the Edmonton International Airport
Edmonton International Airport -
Groundside Roads Rehabilitation at Edmonton International Airport
Edmonton International Airport -
AirPoint 2 Development at the Edmonton International Airport
Edmonton International Airport -
Reservoir 1 Gravel Road Construction and Parking Lot Regrading at Edmonton International Airport
Edmonton International Airport -
Value Park Pavement at the Edmonton International Airport
Edmonton Regional Airports Authority -
Airside Pavement Repairs at Edmonton International Airport
Edmonton International Airport -
International Cargo Hub Development at Edmonton International Airport
Edmonton International Airport -
Leduc County Fire Services (fire Station) at Edmonton International Airport
Edmonton International Airport -
Shell Service Station at Edmonton International Airport
Edmonton International Airport -
Construction of Canadian Forces Housing Agency (CFHA) Apartments, Row Houses, Duplexes, Access Roads and Site Services, 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base -
Canadian Forces Base (CFB) Edmonton Garrison Spray Park and Playground Construction
Edmonton garrison -
Concept Design and Performance Specification for Edmonton Waveguide Bridge and Foundation Piers - 3rd Canadian Division Support Group, Edmonton
3rd Canadian Division Support Group, Edmonton -
Construct Land Vehicle Crew Training System Facility- 3rd Canadian Division Support Base Edmonton
3 Canadian Division Support Base (CDSB) Edmonton -
Design and Construct Dry Gap Bridge Training Aide, Canadian Forces Base Edmonton
Canadian Forces Base Edmonton -
Construction of the Strategic Tanker Transport Capability, Main Operating Base (West), Alberta
Main Operating Base (West) - Edmonton -
Repair Normandy Road - Canadian Forces Base Edmonton
Canadian Forces Base Edmonton -
Design and Construct Armored Combat Support Vehicle (ACSV) Facility- 3rd Canadian Division Support Group, Edmonton
3rd Canadian Division Support Group, Edmonton -
Construct Transition Centre - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
Skate Park Expansion - 3rd Canadian Division Support Group, Edmonton
3rd Canadian Division Support Base Edmonton -
1 Combat Engineer Regiment (CER) Compound Expansion - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
Enoch ATCO Plastic Mains Replacement Project
Enoch Cree Nation -
New Fibre Installation
Pigeon Lake 138A, Elk Island National Park -
Pigeon Lake Recreation Centre Water and Sewer Line Replacement Project
Pigeon Lake -
Base Line Terminal Project
Edmonton -
Potential Regional Assessment of a Western Energy Corridor from Alberta to Manitoba
Fort Saskatchewan -
Cando Sturgeon Rail Terminal West Expansion Project
Sturgeon County -
Fort Saskatchewan Rail Facility Project
Fort Saskatchewan -
Beacon AI Centers Heartland Project
Sturgeon County, about 7 kilometres east of Gibbons -
Cando Sturgeon Rail Terminal Project
Sturgeon County -
Greenlight Electricity Centre Project
10 km east of Gibbons, Sturgeon County -
Heartland Petrochemical Complex Rail Yard Project
North of Fort Saskatchewan -
Sturgeon Petrochemical Rail Yard Project
Six kilometres north of Fort Saskatchewan -
Josephburg Condensate Fractionation Project
22 kilometres northeast of Edmonton -
Redwater Facility Rail Yard Project
Near Redwater -
New (Single) Tower Construction & Upgrade (Single) Tower
project site 1: Louis Bull 138B -
Louis Bull Water Treatment Plant Upgrades
Louis Bull Tribe -
Louis Bull Kikinow Housing Project
Louis Bull Tribe -
Louis Bull Tribe - 2020 Septic System Improvements
Louis Bull Tribe -
Louis Bull Tribe Water System Project/Water Treatment Plant and Reservoir
Louis Bull Tribe -
Heartland Generating Station Project
Fort Saskatchewan, Bruderheim -
Ermineskin Solar Project
Ermineskin Cree Nation No. 138 -
ATCO Salt Cavern Storage Expansion Project
14 kilometres northeast of Fort Saskatchewan -
Enbridge Northern Gateway Project
Bruderheim -
Strathcona Salt Cavern Storage Project
near Fort Saskatchewan -
New (Single) Tower Construction & Upgrade (Single) Tower
project site 2: Ermineskin 138 -
Xplore Inc., external modification to existing radiocommunications tower on Ermineskin No. 138 reserve land, near Maskwacis, AB.
Xplore Inc., external modification to existing radiocommunications tower on Ermineskin No. 138 reserve land -
Value Chain Solutions - Heartland Complex Expansion Project
18 kilometres north east of Fort Saskatchewan -
Ermineskin Waste Transfer Station
Ermineskin Cree Nation -
Ermineskin Drainage Improvements (Culvert Replacement - Small Boy Road, Buffalo Avenue, 3 Mile Road) Project
Ermineskin Cree Nation -
Samson Menaik Road Commercial Development Project
Samson Cree Nation -
Culvert Replacement with Larger Diameter
Elk Island National Park -
RHI 3 - Samson Cree Nation
RHI 3 - Samson Cree Nation -
Ermineskin Sundancer Solar Project 2MWdc
Ermineskin Cree Nation -
RW-4853 oil and gas pipeline O'Chiese IR203
RW-4853 oil and gas pipeline O'Chiese IR203 -
Samson Cree Nation Water Infrastructure Replacement
Samson Cree Nation -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve -
Pedestrian Bridge Replacement on Simmons Trail
Elk Island National Park -
O'Chiese Indian Reserve 203
O'Chiese Indian Reserve 203 -
Bear and Moss Trails Restoration, Elk Island National Park
Elk Island National Park -
Samson Cree Nation Groundwater Well Improvement Project
Samson Cree Nation -
Decoy Beaver Dam Pilot Project for Beaver Coexistence Management
Elk Island National Park of Canada -
Proposed Wellsite Expansion within 15-27-044-10W5M and associated Borrow Pit in O'Chiese First Nation Reserve
O'Chiese First Nation Reserve No. 203 -
O'Chiese First Nation Education Way North End Subdivision
O'Chiese First Nation -
O'Chiese Culvert 3 Replacement Project
O'Chiese First Nation -
O'Chiese Culvert 1 Replacement Project
O'Chiese First Nation -
Alberta Transportation Culvert Installation on Highway 16 near Main Park Entrance EINP
Elk Island National Park -
O'Chiese First Nation New School Road Culvert Replacements and Installation Project
O’Chiese First Nation -
Proposed Pipeline from 15-27 to 09-28-044-10W5M in O'Chiese Indian Reserve No. 203
Proposed Pipeline from 15-27 to 09-28-044-10W5M in O'Chiese Indian Reserve No. 203 -
Construct a new Mock Jump Tower training facility – Canadian Forces Base Edmonton
Canadian Forces Base Edmonton -
Reconstruct Asphalt Fitness Trails Phase 1 - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
Astotin Lake Dock Replacement
Elk Island National Park -
Samson Cree Nation Aboriginal Head Start on Reserve
Samson Cree Nation -
Samson Cree Nation 3 Mile Lagoon Drainage Improvements
Samson Cree Nation -
O'Chiese Indian Reserve 203 Well pad Expansion
O'Chiese Reserve 203 -
Lamont Railcar Storage Project
Northwest of Lamont -
OS-7256 oil and gas surface lease O'Chiese IR203
OS-7256 oil and gas surface lease O'Chiese IR203 -
Culvert Clearing
Elk Island National Park -
O'Chiese Culvert 2 Replacement Project
O'Chiese First Nation -
Fortis Alberta Underground Powerline Installation
Elk Island National Park -
Flipi Gas-Fired Generation Project
Approximately 18 km southwest of Rimbey -
O'Chiese First Nation
O'Chiese First Nation -
O'Chiese First Nation Powwow Arbor Replacement
O'Chiese First Nation -
Montana First Nation Emergency Road Repairs
Montana First Nation -
OS-5844 oil and gas well site Sunchild IR202
OS-5844 Sunchild IR 202 -
Sunchild Indian Reserve Pipeline
Sunchild Indian Reserve -
Sunchild Gas Distribution Line
Sunchild -
Sunchild 202 Reserve oil and gas development OS-7243
Sunchild Reserve 202 -
Sunchild Culvert 1 Replacement Project
Sunchild First Nation -
O'Chiese First Nation Former Landfills Closure and Remediation Plan
O'Chiese First Nation -
O'Chiese First Nation (OCFN) - Baptiste River Bridge Replacement
O'Chiese No. 203 IR -
Proposed Wellsite Expansion within 11-06-043-09W5M and associated Borrow Pit in Sunchild Indian Reserve
Sunchild Reserve -
Proposed Pipeline from 11-06 to 03-02-043-10W5M in Sunchild First Nation Reserve
Sunchild First Nation Reserve #202 -
Sunchild First Nation Package Water Treatment Plant
Sunchild First Nation -
Proposed Pipeline from 03-15 to14-10-043-10W5 located in Sunchild Indian Reserve No. 202
Sunchild First Nation Reserve #202 -
Sunchild Culvert 2 Replacement Project
Sunchild First Nation -
Sunchild First Nation: Community Wastewater Lagoon and Access Road
Sunchild First Nation -
Sunchild First Nation: Community Roads, Residences, and Service Infrastructure Buildout
Sunchild First Nation -
Moraine Power Generation Project
Whitecourt -
Edson Mainline Expansion Project
Drayton Valley -
Sunchild First Nation Child and Family Services Temporary Emergency Placement Home and Offices
Sunchild First Nation -
Alexis Nakota Sioux Nation 1993 Spill Remediation Project
Alexis Nakota Sioux Nation -
Application for Approval of the 2021 Pipeline Decommission Program
Alexis Nakota Sioux Nation Whitecourt (IR 32) Reserve Lands -
Edson Mainline Expansion Project
Drayton Valley -
Ryley Biomedical Waste Incinerator Project
Ryley -
Parks Canada Rocky Mountain House National Historic Site Fiber communication installation 2025
Rocky Mountain House National Historic Site -
Ryley Facility Expansion Project
Ryley -
Black Bear Power Plant Project
Swan Hills -
Meanook National Wildlife Area Buildings Demolition
Meanook National Wildlife Area -
Storage Tank Decommissioning and Relocation at Multiple Locations - 3rd Canadian Division Support Base, Southern Alberta
Cormack Armoury - Red Deer -
Edson Mainline Expansion Project
Rocky Mountain House -
NOVA Gas Transmission Ltd. - 2021 NGTL System Expansion Project
Grande Prairie -
Highway 947 Extension Project
Edson -
Cascade Power Plant Project
Yellowhead County -
Frog Lake First Nation Askiy Hemp Limited Partnership Project
Frog Lake First Nation -
Clearwater Peat Harvesting Project
Caroline -
RW-4852 and OS-7246 Authorization to Construct and Operate a Right of Way for a natural gas Pipeline and associated riser
Alexander First Nation -
OS-7255 Authorization to Construct and Operate a Surface Lease for a Borrow Pit, a multi-well pad and log deck.
Alexander First Nation 134A -
Highway 947 Extension Project
-
Edson Mainline Expansion Project
Rocky Mountain House -
Robb Trend Coal Mine Expansion Project
Robb -
Parking lot replacement at RCMP Detachment in Innisfail, Alberta
Innisfail -
Stoney Nation Big Horn Wastewater System
Big Horn No. 144A -
New Fibre Installation
Big Horn 144A - site 2(BH-FSA) -
New Fibre Installation
Big Horn 144A - site 1(BH-POP) -
New (Multiple) Tower Construction & New Fibre Installation
Project Site 2: Kikino Metis Settlement -
Big Horn Reserve Water System
Big Horn Reserve No. 144A -
Stoney Big Horn AORHS and Health Center Project
Stoney Nakoda Nation -
New (Multiple) Tower Construction & New Fibre Installation
Project Site 1: Kikino Metis Settlement -
Stoney Big Horn Fire Hall
Big Horn Reserve -
New (Multiple) Tower Construction & New Fibre Installation
Project Site 3: Kikino Metis Settlement -
Saddle Lake Cree Nation Pathway to Learning
Saddle Lake Cree Nation -
Saddle Lake Broadband and Cellular Connectivity Upgrade and Resilience Plan Project
Saddle Lake -
Saddle Lake 40 Acre Housing Project
Saddle Lake Cree Nation -
Saddle Lake Cree Nation Townsite Pumphouse Project
Townsite Pumphouse -
Saddle Lake Cree Nation Women's Shelter Project
Saddle Lake Cree Nation -
Pathway to Learning
Saddle Lake No. 125 -
Saddle Lake Cree Nation 9A Road Saddle Lake Creek Culvert Replacement Project
Saddle Lake Cree Nation -
Saddle Lake Gas Distribution System (Child Welfare Reunification Subdivision)
Saddle Lake Cree Nation -
Saddle Lake Cree Nation Road Rehabilitation
Saddle Lake #125 -
Whitefish Lake First Nation #128 Waste Transfer Station
Whitefish Lake First Nation #128 -
Whitefish Lake First Nation Subdivision Lot Development
Whitefish Lake First Nation #128 -
New Fibre Installation
Saddle Lake 125 -
Construction of Two Bridge Files in Saddle Lake Cree Nation
Construction of Two Bridge Files in Saddle Lake Cree Nation -
Sawridge Band Solar Farm Project
Sawridge Band -
Vista Coal Underground Mine Project and Vista Mine Phase II Expansion Project
10 kilometres east of Hinton -
Vista Coal Mine Phase II Expansion Project
Hinton -
New Fibre Installation
Project Site 2: Sawridge No. 150G -
New Fibre Installation
Project Site 1: Sawridge No. 150G -
New Fibre Installation - Slave Lake
Project Site 1: Slave Lake -
New Fibre Installation - Slave Lake
Project Site 2: Slave Lake -
Sawridge First Nation - 2 Single Houses Project - 2025-2026
Sawridge First Nation