Registry Search Mobile

Registry Search

ATCO Salt Cavern Storage Expansion Project

ATCO Energy Solutions Ltd. is proposing to expand its existing Strathcona Salt Cavern Storage Facility, located about 14 kilometres northeast of Fort Saskatchewan, in Alberta's Industrial Heartland. As proposed, the ATCO Salt Cavern Storage Expansion Project would increase the facility's storage capacity by about 400,000 m3 by adding four underground salt caverns for the storage of ethylene, propane, butane and condensate (natural gas liquids). All project activities, including the construction of an above-ground product handling facility and brine pond, would take place on land privately owned by the proponent.


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Latest update

February 17, 2021 — The public comment period on the summary of the initial project description is closed. The Impact Assessment Agency of Canada is currently reviewing all comments received to prepare the summary of issues. The Agency will post the summary of issues at a later date.

February 5, 2021 — The Impact Assessment Agency of Canada is making funding available to assist the participation of the public and Indigenous groups in the impact assessment for this project. Applications received by March 8, 2021, will be considered.

Participate

Key documents

Key documents
Document Number Document Title File Date
2 Summary of an Initial Project Description of a Designated Project PDF (2.4 MB) January 13, 2021
1 Initial Project Description of a Designated Project PDF (8.5 MB) January 13, 2021

List all records

Contacts

ATCO Salt Cavern Storage Expansion Project
Impact Assessment Agency of Canada
Canada Place
9700 Jasper Avenue
Edmonton, Alberta T5J 4C3
Email: iaac.SaltCavern-CavernesSel.aeic@canada.ca


  • Location

    • 14 kilometres northeast of Fort Saskatchewan (Alberta)
  • Project Type

    • Oil and Gas
  • Status

    In progress
  • Start Date

    2021-01-25
  • Proponent

    ATCO Energy Solutions Ltd.
  • Authorities

    • Impact Assessment Agency of Canada
  • Assessment Type

    Planning Phase for Impact Assessment
  • Reference Number

    81297

Nearby projects

..within 200 kilometres
Date modified: