Construction of a Royal Canadian Mounted Police Detachment in Vermilion, Alberta
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The Royal Canadian Mounted Police are proposing to construct a new police detachment in the Town of Vermilion, Alberta. Planned footprint of new detachment building is approximately 1117m². Construction will occur on a previously developed lot in the Town of Vermilion, Alberta.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
17 June 2022 – The public comment period on the project is closed. The Royal Canadian Mounted Police is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects.
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1 | Public Notice | - | May 16, 2022 |
Contacts
Royal Canadian Mounted PoliceIain Melvin, Manager, National Environmental Policy Central
Dartmouth, Nova Scotia B2V 1P9
Telephone: 902-221-2429
Email: iain.melvin@rcmp-grc.gc.ca
-
Location
- Vermilion (Alberta)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
In progress -
Start Date
2022-05-16 -
Proponent
Royal Canadian Mounted Police -
Authorities
- Royal Canadian Mounted Police
-
Assessment Type
Project on federal lands -
Reference Number
83643
Nearby assessments
...within 200 kilometres-
Potential Regional Assessment of a Western Energy Corridor
near Vermilion -
Trench Removal and Site Restoration in C1 area at CFB Wainwright
The Range Training Area (RTA) at Detachment Wainwright -
RW-4851 Authorization to Construct and Operate a Right of Way for a gas pipeline
Frog Lake First Nation -
Construction of Two Bridge Files in Saddle Lake Cree Nation
Construction of Two Bridge Files in Saddle Lake Cree Nation -
Install Cattle Watering Line in the Range and Training Area - Garrison Wainwright
Garrison Wainwright -
Skate Park Design-Build Project - Garrison Wainwright
Garrison Wainwright -
Demolition of Tent City, Building 313 and Water Point - Garrison Wainwright
Garrison Wainwright -
Upgrade Range 1 at Garrison Wainwright
Garrison Wainwright in Denwood -
Upgrade Railhead at Garrison Wainwright
Garrison Wainwright (Denwood) -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Building 633) -
New Power Line Installation
CFB Suffield, Medicine Hat -
Reconfigure Power Distribution at the Exercise Control Site
CFB Suffield, Medicine Hat -
Electrical Power Upgrade for Building 650 (B650) at Garrison Wainwright
Garrison Wainwright (Denwood) -
Demolish Pre-Wash Facility - Garrison Wainwright
Garrison Wainwright -
Front Gate Water Loop - Garrison Wainwright
Garrison Wainwright in Denwood -
Upgrade Main Petroleum Oils and Lubricants (POL) Facility at Garrison Wainwright
Garrison Wainwright in Denwood -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Bulk parking lot) -
Provide Power to Troop Shelters at Garrison Wainwright
Garrison Wainwright (Denwood) -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Building 750) -
Upgrade Water and Sewer Utilities to Building AW22 at Garrison Wainwright
Garrison Wainwright (Denwood) -
Upgrades to Range 8 - Garrison Wainwright
Garrison Wainwright -
Construct Sniper Range at Garrison Wainwright
Garrison Wainwright (Denwood) -
Stabilize Temporary Bridge Abutments - Garrison Wainwright
Garrison Wainwright -
OS-6825 Authorization to Construct an access road and a Surface Lease Extension and Operate a Multi-well oil pad
OS-6825 -
Waskonaman Hill Gravel Project
Frog Lake First Nation -
OS-7250 Authorization to Construct and Operate a Surface Lease for an access road and a multi-well pad
Frog Lake First Nation -
Demolish and Upgrade Vertical Village - Garrison Wainwright
Garrison Wainwright -
Frog Lake First Nation Water System Project
Frog Lake First Nation -
Frog Lake First Nation Water System Project
Frog Lake First Nation -
Building Foundation Removal and Site Restoration in Lost Farm Area at 3CDSB Wainwright
The Range Training Area (RTA) at Detachment Wainwright -
Frog Lake Waste Management Transfer Station
Frog Lake First Nation -
Onion Lake Cree Nation Aquatic Centre Project
Onion Lake Cree Nation Aquatic Centre Project -
Frog Lake First Nation Landfill Cap Construction
Frog Lake First Nation -
Kehewin Cree Nation Transfer Station
Kehewin Cree Nation -
Kehewin Transmission System Extension Project
Kehewin Cree Nation -
TransCanada Energy East Pipeline Project
Hardisty -
RW-4850 Authorization to Construct and Operate a Right of Way for a gas pipeline
RW-4850 -
Hardisty Rail Terminal Project
10 km southeast of Hardisty -
Saddle Lake Cree Nation: P047935 Child Welfare Reunification Infrastructure Project
Saddle Lake First Nation -
Kehewin Lift Station Project
Kehewin Cree Nation -
Enbridge Line 3 Replacement Program
Hardisty -
Kehewin Treatment Centre - 2020-3825
Kehewin Cree Nation -
Saddle Lake Cree Nation 9A Road Saddle Lake Creek Culvert Replacement Project
Saddle Lake Cree Nation -
Saddle Lake 40 Acre Housing Project
Saddle Lake Cree Nation -
Saddle Lake Broadband and Cellular Connectivity Upgrade and Resilience Plan Project
Saddle Lake -
Saddle Lake Cree Nation Road Rehabilitation
Saddle Lake #125 -
Install New Trailer Complex at P12 at Garrison Wainwright
Garrison Wainwright (near Denwood) -
Ryley Facility Expansion Project
Ryley -
Saddle Lake Cree Nation: CU123 Whitefish Lake IR no. 128 Water System - Cistern Repairs & Replacements
Saddle Lake Cree Nation -
Ryley Biomedical Waste Incinerator Project
Ryley -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 2: Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 5: Cold Lake -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MINISTIKWAN I.R. 161 (Tower 3) -
Ministikwan Lake Cree Nation - Solid Waste Transfer Station
Ministikwan IR161 -
Ministikwan Subdivision Development
Ministikwan IR 161 -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 4: Cold Lake -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
WATERHEN I.R. 130 -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
New Tower 1: Cold Lake -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MINISTIKWAN I.R. 161A -
Cold Lake First Nation - Frog Lake Regional Water Tie-In
Cold Lake First Nation -
Cold Lake Budget 2018 Year Three Housing Project 2020 (6 Units)
Cold Lake First Nation -
Cold Lake First Nation Housing Project 2019 (10 Unit Renovation Project)
Cold Lake First Nation -
Cold Lake First Nation Subdivision Project
Cold Lake First Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 1: Cold Lake -
Department of National Defence Future Fighter Capability Project - Demolition of Hangar 6 and Construction of New Fighter Squadron Facility
4 Wing Cold Lake, approximately 300 kilometers northeast of Edmonton -
Building Demolition - 4 Wing Cold Lake
Cold Lake -
Replacement of Collapsed Storm Sewer Lines - 4 Wing Cold Lake
4 Wing Cold Lake -
Maintenance, Repair, and Installation Work for Storage Tank Systems - Cold Lake Air Weapons Range and 4 Wing Cold Lake
Cold Lake Air Weapons Range and 4 Wing Cold Lake -
Building Demolition and Ramp Underground Fuel Line Removal - 4 Wing Cold Lake
4 Wing Cold Lake -
Campus Energy - Pipeline Replacement/Removal
4 Wing Cold Lake -
Whitefish Lake First Nation #128 Waste Transfer Station
Whitefish Lake First Nation #128 -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
New Tower 2: Cold Lake -
Thunderchild Wellness Centre
Thunderchild Wellness Centre -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MINISTIKWAN I.R. 161 (Tower 1) -
Alberta Transportation Culvert Installation on Highway 16 near Main Park Entrance EINP
Elk Island National Park -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MAKWA LAKE I.R. 129B (Tower 3) -
Cold Lake First Nation Subdivision Project
Cold Lake First Nation -
Fortis Alberta Underground Powerline Installation
Elk Island National Park -
Makwa Lake Resort Development
Makwa Lake Indian Reserve No. 129B -
Astotin Lake Dock Replacement
Elk Island National Park -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MINISTIKWAN I.R. 161 (Tower 2) -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 3: Cold Lake -
Bear and Moss Trails Restoration, Elk Island National Park
Elk Island National Park -
Cold Lake First Nation Water System Upgrades
Cold Lake First Nation -
Lamont Railcar Storage Project
Northwest of Lamont -
Culvert Replacement with Larger Diameter
Elk Island National Park -
Powwow Arbour Construction
Pierceland -
Little Pine First Nation Lagoon Upgrade
Little Pine IR No. 116 -
Strathcona Salt Cavern Storage Project
near Fort Saskatchewan -
Reconstruct Asphalt Fitness Trails Phase 1 - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
Heartland Generating Station Project
Fort Saskatchewan, Bruderheim -
ATCO Salt Cavern Storage Expansion Project
14 kilometres northeast of Fort Saskatchewan -
Value Chain Solutions - Heartland Complex Expansion Project
18 kilometres north east of Fort Saskatchewan -
Great Sandhills Railway Switching Operation at North West Terminal Project - Revised Design
1 kilometre east of Unity, Saskatchewan -
Great Sandhills Railway Switching Operation at North West Terminal Project
1 kilometre east of Unity -
Enbridge Northern Gateway Project
Bruderheim -
Thunderchild First Nation - Solid Waste Transfer Station
Thunderchild IR115B & 115C -
Thunderchild First Nation Lagoon Upgrade
Thunderchild IR115B -
Sweetgrass Daycare and Early Learning Head Start Centre Project
Saskatoon -
Sweetgrass New School
Sweetgrass IR 113 -
Heartland Petrochemical Complex Rail Yard Project
North of Fort Saskatchewan -
Fort Saskatchewan Rail Facility Project
Fort Saskatchewan -
Redwater Facility Rail Yard Project
Near Redwater -
Cando Sturgeon Rail Terminal Project
Sturgeon County -
Potential Regional Assessment of a Western Energy Corridor from Alberta to Manitoba
Fort Saskatchewan -
Sturgeon Petrochemical Rail Yard Project
Six kilometres north of Fort Saskatchewan -
Beaver Lake Cree Nation New High School and Resource Centre
Beaver Lake Cree Nation -
Beaver Lake Cree Nation Fiber Optic Internet Infrastructure - Universal Broadband Fund Project
Beaver Lake Cree Nation -
Thunderchild First Nation - Turtle Lake Site 115C WTP Process Waste Pond
Thunderchild IR 115C -
Beaver Lake Cenovus Housing Initiative - Build Out of 20 Residential Lots, Access Roads, and Water Distribution
Beaver Lake Cree Nation -
Cold Lake Air Weapons Range (CLAWR) Culvert Replacement
4 Wing Cold Lake -
Base Line Terminal Project
Edmonton -
Saulteaux IR159 Timber Harvest Plan 2020-21
Saulteaux IR 159EE -
Saulteaux Fire Hall / Maintenance Facility
Saulteaux IR 159 -
Saulteaux IR159 Timber Harvest Plan 2021-22
Saulteaux IR 159EE -
Moosomin Road Repair and Drainage
Moosomin IR No. 112B -
Trans Mountain Expansion Project
Edmonton -
Canadian Natural Resources Limited - New radiocommunications tower on NW 34-68-4 W4M, Cold Lake Air Weapons Range, AB
NW 34-68-4 W4M. , Cold Lake Air Weapons Range, AB -
GL7 Phase 1 Transmission Rebuild Project (L007) / Saulteaux and Moosomin First Nations
Saulteaux IR 159G & Moosomin IR 112L -
Parking Lot Resurfacing for the Entire Complex along with Line Painting at the RCMP K Division
Edmonton -
1 Combat Engineer Regiment (CER) Compound Expansion - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
Canadian Natural Resources Limited - New radiocommunications towers on 06-09-069-04W4 and 11-04-069-04W4, Cold Lake Air Weapons Range, AB
11-04-069-04W4 -
Canadian Natural Resources Limited - New radiocommunications towers on 06-09-069-04W4 and 11-04-069-04W4, Cold Lake Air Weapons Range, AB
06-09-069-04W4 -
Shell Service Station at Edmonton International Airport
Edmonton International Airport -
Samson Cree Nation 3 Mile Lagoon Drainage Improvements
Samson Cree Nation -
Cargo and Apron Development at Edmonton International Airport
Edmonton International Airport (Alberta) -
Alberta Zero Emissions Truck Electrification Collaboration Fueling Station
Edmonton International Airport -
Runway End Safety Areas at Edmonton International Airport
Edmonton International Airport -
Cargo and Apron Development at Edmonton International Airport
Edmonton International Airport -
Runway End Safety Areas at Edmonton International Airport
Edmonton International Airport -
Airport Perimeter Road South Extension at Edmonton International Airport
Edmonton International Airport -
Leduc County Fire Services (fire Station) at Edmonton International Airport
Edmonton International Airport -
International Cargo Hub Development at Edmonton International Airport
Edmonton International Airport -
Construction and Rehabilitation to Existing Parking Lots, Parkade and Roadways at the Edmonton International Airport
Edmonton International Airport -
GroHERE at Edmonton International Airport
Edmonton International Airport -
AIRPORT CITY SOLAR PROJECT at Edmonton International Airport
Edmonton International Airport -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
EAGLES LAKE I.R. 165C -
Ermineskin Sundancer Solar Project 2MWdc
Ermineskin Cree Nation -
Samson Cree Nation Groundwater Well Improvement Project
Samson Cree Nation -
Samson Cree Nation Water Infrastructure Replacement
Samson Cree Nation -
Ermineskin Solar Project
Ermineskin Cree Nation No. 138 -
RHI 3 - Samson Cree Nation
RHI 3 - Samson Cree Nation -
Ermineskin Waste Transfer Station
Ermineskin Cree Nation -
Montana First Nation Emergency Road Repairs
Montana First Nation -
Louis Bull Kikinow Housing Project
Louis Bull Tribe -
Louis Bull Tribe Water System Project/Water Treatment Plant and Reservoir
Louis Bull Tribe -
Louis Bull Tribe - 2020 Septic System Improvements
Louis Bull Tribe -
RHI 20 Unit Subdivision
Enoch Cree Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MAKWA LAKE I.R. 129B (Tower 1) -
Enoch Cree Nation Housing Development Project
Enoch Cree Nation -
Heart Lake BF 80752 Bridge Replacement
Heart Lake First Nation -
Heart Lake First Nation: CU370 Wastewater System Emergency Repairs
Heart Lake First Nation -
Enoch Cree Nation Traditional Lands Development Project
Enoch Cree Nation -
Heart Lake First Nation: Inter-jurisdictional Access Road
Heart Lake First Nation #167 -
Enoch Cree Nation Wastewater System Upgrades
Enoch Cree Nation -
Enoch Phase 27 Housing Project 2020 (5 Units)
Enoch Cree Nation -
Samson Menaik Road Commercial Development Project
Samson Cree Nation -
Enbridge Line 3 Replacement Program
Kerrobert -
Mosquito First Nation Lagoon Upgrades
Mosquito First Nation -
Flying Dust - New Water Treatment Plant
Flying Dust IR 105