Frog Lake First Nation Water System Project
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The water infrastructure upgrades include a new water treatment plant located on the north side of Frog Lake, a new raw water intake, a new raw water intake pump station, a new raw water pond, a new raw water transfer pump station, treated water transmission line, and local residuals management. The new infrastructure will be sized to the 20-year projected water demand.
Latest update
February 6, 2021 – The public period on the project is closed. Indigenous Services Canada is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects.
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1 | Public Comment Period on Intent to Make a Determination | - | January 6, 2021 |
Contacts
Indigenous Services CanadaStacey LeBlanc, Sr. Environment Officer
630 Canada Place, 9700 Jasper Ave
Edmonton, Alberta T5J 4G2
Telephone: 780-782-8350
Email: stacey.leblanc@canada.ca
-
Location
- Frog Lake First Nation (Alberta)
-
Nature of Activity
- Water Management
-
Assessment Status
Completed -
Start Date
2021-01-06 -
Proponent
Frog Lake First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
81267
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Frog Lake First Nation Water System Project
Frog Lake First Nation -
Frog Lake Waste Management Transfer Station
Frog Lake First Nation -
OS-6870 Authorization to extend an existing surface lease area for a multi-well pad
Frog Lake First Nation -
Frog Lake First Nation Landfill Cap Construction
Frog Lake First Nation -
OS-6634 Authorization to extend an existing surface lease area for a multi-well pad
Frog Lake First Nation -
OS-7251 Authorization to Construct and Operate a Surface Lease for an access road and a multi-well pad
Frog Lake First Nation -
Frog Lake CFS Equine Centre
Frog Lake -
OS-6825 Authorization to Construct an access road and a Surface Lease Extension and Operate a Multi-well oil pad
OS-6825 -
OS-6826 Authorization to extend an existing surface lease area for a multi-well pad
Frog Lake First Nation -
OS-7250 Authorization to Construct and Operate a Surface Lease for an access road and a multi-well pad
Frog Lake First Nation -
Frog Lake Waskonaman Hill Gravel Project (Amendment)
Frog Lake First Nation -
RW-4850 Authorization to Construct and Operate a Right of Way for a gas pipeline
RW-4850 -
Kehewin Transmission System Extension Project
Kehewin Cree Nation -
OS -7254 Authorization to Construct and Operate a Surface Lease for an access road and a multi-well pad - Public Comments Invited
Kehewin Cree Nation -
Kehewin Cree Nation Telus Tower AB103726
Kehewin Cree Nation -
Kehewin Cree Nation Waste Diversion Station
Kehewin Cree Nation -
Telus telecommunications tower located on Kehewin Cree Nation located south of Bonnyville, AB
Telus telecommunications tower located on Kehewin Cree Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 2: Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 5: Cold Lake -
Kehewin Treatment Centre - 2020-3825
Kehewin Cree Nation -
Kehewin Lift Station Project
Kehewin Cree Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 4: Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
New Tower 1: Cold Lake -
Cold Lake First Nation - Frog Lake Regional Water Tie-In
Cold Lake First Nation -
Cold Lake First Nation: CUZ46 Wastewater System Expansion
Cold Lake First Nation -
Cold Lake Budget 2018 Year Three Housing Project 2020 (6 Units)
Cold Lake First Nation -
Cold Lake First Nation Subdivision Project
Cold Lake First Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 1: Cold Lake -
Cold Lake First Nation Housing Project 2019 (10 Unit Renovation)
Cold Lake First Nation -
Onion Lake Cree Nation Aquatic Centre Project
Onion Lake Cree Nation Aquatic Centre Project -
RW-4851 Authorization to Construct and Operate a Right of Way for a gas pipeline
Frog Lake First Nation -
Cold Lake First Nations Community Gathering Space
Cold Lake First Nations -
Cold Lake First Nations Casino Expansion Project
Cold Lake First Nations -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
WATERHEN I.R. 130 -
Cold Lake First Nations: Casino Dene Expansion, Event Centre, Parking Project
Cold Lake First Nations -
Ministikwan Lake Cree Nation - Solid Waste Transfer Station
Ministikwan IR161 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161 (Tower 3) -
Ministikwan Subdivision Development
Ministikwan IR 161 -
Power Grid Modernization - 4 Wing Cold Lake
4 Wing Cold Lake -
Department of National Defence Future Fighter Capability Project - Demolition of Hangars 6 and 7, and Construction of New Supporting Infrastructure
4 Wing Cold Lake, approximately 300 kilometers northeast of Edmonton -
Building Demolition - 4 Wing Cold Lake
Cold Lake -
21M Range Revitalization (CL220020) - 4 Wing Cold Lake
4 Wing Cold Lake -
Renovation of Building 325 - Pumphouse & Water Purification Plant (CL210010) - 4 Wing Cold Lake
4 Wing Cold Lake -
Demolition of Barrack Block 48 - 4 Wing Cold Lake
4 Wing Cold Lake -
Replacement of Collapsed Storm Sewer Lines - 4 Wing Cold Lake
4 Wing Cold Lake -
Maintenance, Repair, and Installation Work for Storage Tank Systems - Cold Lake Air Weapons Range and 4 Wing Cold Lake
Cold Lake Air Weapons Range and 4 Wing Cold Lake -
Building Demolition and Underground Fuel Line Removal - 4 Wing Cold Lake
4 Wing Cold Lake -
Campus Energy - Pipeline Replacement/Removal
4 Wing Cold Lake -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161A -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Cold Lake -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
New Tower 2: Cold Lake -
Cold Lake First Nation: CUZD3 Phase II and III Water Distribution System
Cold Lake First Nation -
Cold Lake First Nation Subdivision Project
Cold Lake First Nation -
Cold Lake First Nations LTE Fixed Wireless Upgrade Project
Existing Tower 3: Cold Lake -
Saddle Lake Cree Nation: P047935 Child Welfare Reunification Infrastructure Project
Saddle Lake First Nation -
Cold Lake First Nation Water System Upgrades
Cold Lake First Nation -
Powwow Arbour Construction
Pierceland -
Construction of a Royal Canadian Mounted Police Detachment in Vermilion, Alberta
Vermilion -
Potential Regional Assessment of a Western Energy Corridor
near Vermilion -
New Fibre Installation
Saddle Lake 125 -
Saddle Lake Cree Nation: CU123 Whitefish Lake IR no. 128 Water System - Cistern Repairs & Replacements
Saddle Lake Cree Nation -
Marguerite Lake Compressed Air Energy Storage Project
La Corey -
SaskPower HR-01033 - RPD-511 PQ Rural Rebuild (Makwa Rebuild)
Makwa First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161 (Tower 1) -
Trench Removal and Site Restoration in C1 area at CFB Wainwright
The Range Training Area (RTA) at Detachment Wainwright -
Construction of Two Bridge Files in Saddle Lake Cree Nation
Construction of Two Bridge Files in Saddle Lake Cree Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 3) -
Makwa Lake Resort Development
Makwa Lake Indian Reserve No. 129B -
Saddle Lake Cree Nation Road Rehabilitation
Saddle Lake #125 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MINISTIKWAN I.R. 161 (Tower 2) -
Saddle Lake Gas Distribution System (Child Welfare Reunification Subdivision)
Saddle Lake Cree Nation -
Saddle Lake Cree Nation 9A Road Saddle Lake Creek Culvert Replacement Project
Saddle Lake Cree Nation -
Saddle Lake Cree Nation Women's Shelter Project
Saddle Lake Cree Nation -
Saddle Lake 40 Acre Housing Project
Saddle Lake Cree Nation -
Saddle Lake Broadband and Cellular Connectivity Upgrade and Resilience Plan Project
Saddle Lake -
Cold Lake Air Weapons Range (CLAWR) Culvert Replacement
4 Wing Cold Lake -
Whitefish Lake First Nation #128 Waste Transfer Station
Whitefish Lake First Nation #128 -
Canadian Natural Resources Limited - New radiocommunications tower on NW 34-68-4 W4M, Cold Lake Air Weapons Range, AB
NW 34-68-4 W4M. , Cold Lake Air Weapons Range, AB -
CNRL proposal to install two new radiocommunications towers on Beaver Lake Cree Nation within the boundary of the Cold Lake Air Weapons range.
P71C - Beaver Lake Cree Nation/Cold Lake Air Weapons Range -
CNRL proposal to install two new radiocommunications towers on Beaver Lake Cree Nation within the boundary of the Cold Lake Air Weapons range.
P162 - Beaver Lake Cree Nation/Cold Lake Air Weapons Range -
Canadian Natural Resources Limited - New radiocommunications towers on 06-09-069-04W4 and 11-04-069-04W4, Cold Lake Air Weapons Range, AB
11-04-069-04W4 -
Canadian Natural Resources Limited - New radiocommunications towers on 06-09-069-04W4 and 11-04-069-04W4, Cold Lake Air Weapons Range, AB
06-09-069-04W4 -
Thunderchild Wellness Centre
Thunderchild Wellness Centre -
Thunderchild First Nation Water Treatment Plant and Well Upgrades
THUNDERCHILD FIRST NATION 115B -
Thunderchild First Nation Powwow Arbor
THUNDERCHILD FIRST NATION 115B -
New Fibre Installation, Upgrade (Single) Tower
Moonlight bay -
Thunderchild First Nation - Turtle Lake Site 115C Sewage Lagoon Operations
Thunderchild First Nation -
Cenovus Foster Creek - Maintenance in Cold Lake Alberta.
Cenovus Foster Creek - Maintenance -
Beaver Lake Cree Nation New High School and Resource Centre
Beaver Lake Cree Nation -
Beaver Lake New School
Beaver Lake Cree Nation -
Beaver Lake Cree Nation Fiber Optic Internet Infrastructure - Universal Broadband Fund Project
Beaver Lake Cree Nation -
Beaver Lake Cree First Nation Cardinal Drive Subdivision
Beaver Lake Cree Cardinal Drive Subdivision -
Install Cattle Watering Line in the Range and Training Area - Garrison Wainwright
Garrison Wainwright -
Cenovus Energy SCADA system modification Project in Foster Creek on Cold Lake Weapons Range
Cenovus Energy SCADA system modification Project -
Upgrades to Roads within Administrative Area- Garrison Wainwright
Garrison Wainwright -
Skate Park Design-Build Project - Garrison Wainwright
Garrison Wainwright -
Beaver Lake Cenovus Housing Initiative - Build Out of 20 Residential Lots, Access Roads, and Water Distribution
Beaver Lake Cree Nation -
Demolition of Tent City, Building 313 and Water Point - Garrison Wainwright
Garrison Wainwright -
Upgrade Railhead at Garrison Wainwright
Garrison Wainwright (Denwood) -
Battle River Pumphouse Replacement - Garrison Wainwright
Garrison Wainwright -
Upgrade Range 1 at Garrison Wainwright
Garrison Wainwright in Denwood -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Building 633) -
New Power Line Installation
CFB Suffield, Medicine Hat -
Reconfigure Power Distribution at the Exercise Control Site
CFB Suffield, Medicine Hat -
Electrical Power Upgrade for Building 650 (B650) at Garrison Wainwright
Garrison Wainwright (Denwood) -
Demolish Pre-Wash Facility - Garrison Wainwright
Garrison Wainwright -
Front Gate Water Loop - Garrison Wainwright
Garrison Wainwright in Denwood -
Upgrade Main Petroleum Oils and Lubricants (POL) Facility at Garrison Wainwright
Garrison Wainwright in Denwood -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Bulk parking lot) -
Construct Hazardous Waste Storage Facility - Garrison Wainwright
Garrison Wainwright -
Provide Power to Troop Shelters at Garrison Wainwright
Garrison Wainwright (Denwood) -
Cenovus Foster Creek - North Trunk Gate (NTG) in Cold Lake Alberta
Cenovus Foster Creek - North Trunk Gate (NTG) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
EAGLES LAKE I.R. 165C -
Paving project at Garrison Wainwright
Garrison Wainwright in Denwood (Building 750) -
Upgrade Water and Sewer Utilities to Building AW22 at Garrison Wainwright
Garrison Wainwright (Denwood) -
Remedial activities at a site impacted by Aqueous Film Forming Foam (AFFF) - Garrison Wainwright
Garrison Wainwright -
Upgrades to Range 8 - Garrison Wainwright
Garrison Wainwright -
Construct Sniper Range at Garrison Wainwright
Garrison Wainwright (Denwood) -
Stabilize Temporary Bridge Abutments - Garrison Wainwright
Garrison Wainwright -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 1) -
Heart Lake BF 80752 Bridge Replacement
Heart Lake First Nation -
New Fibre Installation
Project Site 2 - Heart Lake: -
Heart Lake First Nations antenna supporting structure located on the Heart Lake First Nations in Lac La Biche County
Heart Lake First Nations antenna supporting structure -
Heart Lake First Nation: CU370 Wastewater System Emergency Repairs
Heart Lake First Nation -
Flying Dust First Nation Regional Landfill
Flying Dust IR 105 -
New Fibre Installation
Project Site 1 - Heart Lake: -
Heart Lake First Nation: Inter-jurisdictional Access Road
Heart Lake First Nation #167 -
Flying Dust Commercial Project
Meadow Lake -
Saulteaux IR159 Timber Harvest Plan 2020-21
Saulteaux IR 159EE -
Building Foundation Removal and Site Restoration in Lost Farm Area at 3CDSB Wainwright
The Range Training Area (RTA) at Detachment Wainwright -
Regional Assessment of Beaver Lake Cree Nation's Traditional Territory
Lac la Biche -
Replacement of Water Crossing and Road Alignment
Primrose Lake Evaluation Range -
Saulteaux IR159 Timber Harvest Plan 2021-22
Saulteaux IR 159EE -
Fixed Point-to-Point Link from Dorintosh, SK to Waterhen Lake, SK
Waterhen 130 Reserve -
Demolish and Upgrade Vertical Village - Garrison Wainwright
Garrison Wainwright -
Thunderchild First Nation - Solid Waste Transfer Station
Thunderchild IR115B & 115C -
Thunderchild First Nation Lagoon Upgrade
Thunderchild IR115B -
Thunderchild First Nation - Turtle Lake Site 115C WTP Process Waste Pond
Thunderchild IR 115C -
Ryley Facility Expansion Project
Ryley -
Flying Dust - New Water Treatment Plant
Flying Dust IR 105 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 2) -
Ryley Biomedical Waste Incinerator Project
Ryley -
Energy East Project
Hardisty -
Hardisty Rail Terminal Project
10 km southeast of Hardisty -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Hardisty -
Fortis Alberta Underground Powerline Installation
Elk Island National Park -
GL7 Phase 1 Transmission Rebuild Project (L007) / Saulteaux and Moosomin First Nations
Saulteaux IR 159G & Moosomin IR 112L -
Lamont Railcar Storage Project
Northwest of Lamont -
Astotin Lake Dock Replacement
Elk Island National Park -
Alberta Transportation Culvert Installation on Highway 16 near Main Park Entrance EINP
Elk Island National Park -
Saulteaux Fire Hall / Maintenance Facility
Saulteaux IR 159 -
Decoy Beaver Dam Pilot Project for Beaver Coexistence Management
Elk Island National Park of Canada -
Bear and Moss Trails Restoration, Elk Island National Park
Elk Island National Park -
Reconstruct Asphalt Fitness Trails Phase 1 - 3rd Canadian Division Support Base Edmonton
3rd Canadian Division Support Base Edmonton -
Install New Trailer Complex at P12 at Garrison Wainwright
Garrison Wainwright (near Denwood) -
Pelican Lake Community Harvest Program Phase 2022-2024
Chitek Lake IR 191 -
Moosomin Road Repair and Drainage
Moosomin IR No. 112B -
Culvert Replacement with Larger Diameter
Elk Island National Park -
Sweetgrass First Nation Wastewater System Upgrades
Sweetgrass First Nation -
Sweetgrass Daycare and Early Learning Head Start Centre Project
Saskatoon -
Sweetgrass New School
Sweetgrass IR 113 -
Strathcona Salt Cavern Storage Project
near Fort Saskatchewan -
Value Chain Solutions - Heartland Complex Expansion Project
18 kilometres north east of Fort Saskatchewan -
ATCO Salt Cavern Storage Expansion Project
14 kilometres northeast of Fort Saskatchewan -
Heartland Generating Station Project
Fort Saskatchewan, Bruderheim -
Pelican Lake First Nation - Quonset Addition
Chitek Lake IR 191 -
Enbridge Northern Gateway Project
Bruderheim -
Chipewyan Prairie First Nation Wastewater Treatment Plant Expansion
Chipewyan Prairie First Nation -
Pelican Lake North Sewage Lagoon Expansion and Upgrades
Chitek Lake IR 191 -
Lac Eauclaire Timber Harvest Program
Pelican Lake IR 191-C -
Pelican Lake First Nation 191 A, B, C, D Gasification Project
Pelican Lake First Nation 191 A, B, C, D -
Pelican Lake Farms - farm site development
Pelican Lake IR 191-B -
Heartland Petrochemical Complex Rail Yard Project
North of Fort Saskatchewan -
Redwater Facility Rail Yard Project
Near Redwater -
Pelican Lake Bioenergy Project
Pelican Lake First Nation -
Little Pine First Nation Lagoon Upgrade and Bridge over Battle River
Little Pine IR No. 116 -
Pelican Lake Timber Harvesting Plan 2021-22
Chitek Lake IR 191 & 191A -
Pelican Lake Timber Harvesting Plan
Chitek Lake IR 191 -
Sturgeon Petrochemical Rail Yard Project
Six kilometres north of Fort Saskatchewan -
Cando Sturgeon Rail Terminal Project
Sturgeon County -
Fort Saskatchewan Rail Facility Project
Fort Saskatchewan -
Weepuskow Sahgaiechan IR 165D Timber Harvest Plan 2020-21
WEPUSKOW SAHGAIECHAN IR 165 D -
Cando Sturgeon Rail Terminal West Expansion Project
Sturgeon County -
Potential Regional Assessment of a Western Energy Corridor from Alberta to Manitoba
Fort Saskatchewan -
Great Sandhills Railway Switching Operation at North West Terminal Project - Revised Design
1 kilometre east of Unity, Saskatchewan -
Great Sandhills Railway Switching Operation at North West Terminal Project
1 kilometre east of Unity -
Witchekan Lake First Nation Solid Waste Transfer Station
Witchekan Lake First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 1) -
Witchekan Lake Subdivision
Witchekan Lake IR 161 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 2) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 3)