Witchekan Lake Subdivision
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The Proposed Project
The proposed project is to design and construct a new subdivision on the available land north east of the existing core area. The scope of work would include sewer mains, water mains, hydrants, service connections, natural gas, primary power, street lights, roadway construction, culverts and approaches, erosion control and lot preparation. The proposed subdivision is on the SW and SE ¼ of 29-52-11-W3.
New water distribution, gravity sewage collection and sewage force main piping will service Phase 1 of the subdivision. A new sewage pumping station will be required near the north central part of the SE quarter. Power, natural gas and telephone services will also be provided to the subdivision lots. Roadways, ditches, rough grading of lots, street lights and signage are also part of the construction.
Site preparation:
Subdivision phase 1 area will require topsoil stripping and stockpiling.
Construction:
1. Deep underground utilities (water and sewer mains) will be installed.
2A. Sewage pumping station construction.
2B. Water and sewer services installed to each lot.
3. Rough grading of road right of way, ditches and lot grading.
4. Shallow utilities (power, gas & telephone) will be installed.
5. Roadway construction, topsoil replacement and landscaping.
6. Street light and signage installation.
Operation:
SPS operation will be ongoing.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination for Witchekan Lake Subdivision | - | December 12, 2022 |
1 | Public Comment Period on Intent to Make a Determination | - | October 14, 2022 |
Contacts
ISC-SKENVIndigenous Services Canada
1827 Albert Street
Regina, Saskatchewan S4P 2S9
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca
-
Location
- Witchekan Lake IR 161 (Saskatchewan)
-
Nature of Activity
- Water Management
- Highways and Roads
- Waste Management
-
Assessment Status
Completed -
Start Date
2022-12-01 -
Proponent
Witchekan Lake First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
84044
Nearby assessments
...within 200 kilometres-
Pelican Lake Bioenergy Project
Pelican Lake First Nation -
Pelican Lake Farms - farm site development
Pelican Lake IR 191-B -
Pelican Lake First Nation 191 A, B, C, D Gasification Project
Pelican Lake First Nation 191 A, B, C, D -
Pelican Lake Timber Harvesting Plan
Chitek Lake IR 191 -
Pelican Lake Timber Harvesting Plan 2021-22
Chitek Lake IR 191 & 191A -
Pelican Lake First Nation - Quonset Addition
Chitek Lake IR 191 -
Big River First Nation Arena Build Project
Big River IR 118 -
Mistahi Sipiy CFS and Big River First Nation Prevention Building
Big River First Nation -
Pelican Lake North Sewage Lagoon Expansion and Upgrades
Chitek Lake IR 191 -
Lac La Ronge Morin Lake Solid Waste Transfer Station & Decommissioning
Morin Lake IR 217 -
Pelican Lake Community Harvest Program Phase 2022-2024
Chitek Lake IR 191 -
Ahtahkakoop Cree Nation Lagoon and Sewage Pumping Station
Ahtahkakoop IR #104 -
Cree Nation Treatment Haven Replacement
Ahtakakoop First Nation -
Ahtahkakoop Cree Nation Water Treatment Plant
Ahtahkakoop IR 104 -
Ahtahkakoop Powwow Grounds & Access Road
Ahtahkakoop Cree Nation -
Lac Eauclaire Timber Harvest Program
Pelican Lake IR 191-C -
GL7 Phase 1 Transmission Rebuild Project (L007) / Saulteaux and Moosomin First Nations
Saulteaux IR 159G & Moosomin IR 112L -
Saulteaux IR159 Timber Harvest Plan 2021-22
Saulteaux IR 159EE -
Mistawasis Nêhiyawak Lake - Traditional Lands, Gathering Space
Mistawasis Nêhiyawak Lake -
Saulteaux IR159 Timber Harvest Plan 2020-21
Saulteaux IR 159EE -
Thunderchild First Nation - Turtle Lake Site 115C WTP Process Waste Pond
Thunderchild IR 115C -
Mistawasis Nehiyawak Rural Transit Solutions
Mistawasis -
Mistawasis Nêhiyawak Community Center
Mistawasis -
Saulteaux Fire Hall / Maintenance Facility
Saulteaux IR 159 -
Moosomin Road Repair and Drainage
Moosomin IR No. 112B -
Thunderchild First Nation - Solid Waste Transfer Station
Thunderchild IR115B & 115C -
Thunderchild First Nation Lagoon Upgrade
Thunderchild IR115B -
SaskPower Pole Mount Transformer Replacement for Hawood
Prince Albert National Park -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MAKWA LAKE I.R. 129B (Tower 2) -
Zagime Anishinabëk RV Trailer Park
Sakimay IR 74 -
Flying Dust - New Water Treatment Plant
Flying Dust IR 105 -
Flying Dust Commercial Project
Meadow Lake -
Hunters Lake Trail Rehabilitation
Prince Albert National Park -
Thunderchild Wellness Centre
Thunderchild Wellness Centre -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MAKWA LAKE I.R. 129B (Tower 1) -
Aggregate Business Development Plan - Phase 2, Sturgeon Lake First Nation I.R. 101
Sturgeon Lake IR 101 -
SaskPower Transformer Salvage
Prince Albert National Park -
Sturgeon Lake First Nation Children's Playgrounds
Park location 1 -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
EAGLES LAKE I.R. 165C -
Kapasiwin Bungalows Installation of Deep Water and Sewer Infrastructure
Prince Albert National Park -
Sturgeon Lake First Nation Children's Playgrounds
Park location 2 -
Biocontrol of Yellow Toadflax using Rhinusa pilosa, in Prince Albert National Park
Prince Albert National Park -
SaskPower Pole Replacement near Halkett (Sandy) Lake
Prince Albert National Park -
SaskPower Ground Grid Replacement near MacKenzie Creek
Prince Albert National Park -
SaskPower Ground Mount Transformer Installation Red Deer Campground
Prince Albert National Park of Canada -
SaskPower Pole Replacement in Prince Albert National Park - east of Sandy Lake
Prince Albert National Park -
Sturgeon Lake First Nation - East Lagoon Expansion
Sturgeon Lake IR 101 -
Sturgeon Lake First Nation Subdivision
Sturgeon Lake IR 101A -
Montreal Lake IR 106B Gasification
Montreal Lake IR 106B -
Sturgeon Lake First Nation Children's Playgrounds
Park location 3 -
SaskPower Poles Replacement in Prince Albert National Park near south west boundary.
Prince Albert National Park -
Montreal Lake Cree Nation Solid Waste Transfer Station & Decommissioning
Montreal Lake IR 106B -
SaskPower Trenching at Anglin Lake Dam
Prince Albert National Park -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 1 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Point of presence -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 3 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 2 -
SaskPower Pole Replacement near Rec Hall
Prince Albert National Park -
Rabbit Creek Wildfire Reclamation
Prince Albert National Park -
SaskPower replacement of 8 power poles in Prince Albert National Park
Prince Albert National Park -
SaskPower Stabilization of 3 Power Poles in Waskesiu
Prince Albert National Park -
SaskPower Line Trenching at Operations Compound
Prince Albert National Park -
SaskPower Hesje Light Pole
Prince Albert National Park -
SaskPower New U/G Cable and Transformer at Kapasawin Bungalows
Prince Albert National Park of Canada -
SaskPower Transformer Replacement and line trenching at Kapasiwin Bungalows
Prince Albert National Park -
SaskPower Cable Installation to Kapasiwin Cabins
Prince Albert National Park -
SaskPower Underground Cable Install at Kapasiwin Bungalows
Prince Albert National Park -
Sweetgrass Daycare and Early Learning Head Start Centre Project
Saskatoon -
Sweetgrass New School
Sweetgrass IR 113 -
Boundary Bog Trail Boardwalk Project
Prince Albert National Park -
Construction of Ready to Move (RTM) buildings at Willow Cree Healing Lodge
Willow Cree Healing Lodge -
Crean Channel Modification
Prince Albert National Park -
Mosquito First Nation Lagoon Upgrades
Mosquito First Nation -
Fenceline Replacement - Prince Albert Training Area, Saskatchewan
DND Prince Albert Training Area -
Sturgeon Lake First Nation - Renovation for gas bar and convenience store
Sturgeon Lake First Nation - Prince Albert Strip Mall -
Potential Regional Assessment of a Western Energy Corridor from Alberta to Manitoba
Prince Albert -
Potential Regional Assessment of a Western Energy Corridor
near Prince Albert -
Batoche Drainage Improvement
Grasslands National Park -
Fuel Reduction Program for Batoche National Historic Site
Batoche National Historic Site -
Peter Ballantyne Child and Family Services Facility
Kistapinin IR 211 -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MINISTIKWAN I.R. 161 (Tower 2) -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MAKWA LAKE I.R. 129B (Tower 3) -
Remediation of One Arrow First Nation River Lot 62
One Arrow IR 95 -
Makwa Lake Resort Development
Makwa Lake Indian Reserve No. 129B -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MINISTIKWAN I.R. 161 (Tower 1) -
Fixed Point-to-Point Link from Dorintosh, SK to Waterhen Lake, SK
Waterhen 130 Reserve -
Dore Lake Wharf Removal
Dore Lake -
MLCN Montreal LK East Lagoon
Montreal Lake IR 106 -
Prince Albert Grand Council (PAGC) Women's Shelter
Montreal Lake -
Beardy's & Okemasis Cree Nation Sewage Lagoon and Pumping Station Upgrades
Beardy's and Okemasis IR No. 96 & 97 -
Little Pine First Nation Lagoon Upgrade
Little Pine IR No. 116 -
Muskoday First Nation - Construct Cultural Centre
Muskoday First Nation - Construct Cultural Centre -
Muskoday First Nation - Drainage Improvements Phase 1
Muskoday First Nation Reserve -
Muskoday First Nation - Community Access Road
Muskoday First Nation Reserve -
Piapot First Nation Prince Albert Urban Gas Bar & Convenience Store
Piapot IR 75 -
Muskoday Convenience Store Remediation
Muskoday First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MINISTIKWAN I.R. 161A -
Apron III infill
Saskatoon International Airport YXE -
General Aviation Hangars Development
Saskatoon International Airport YXE -
Kahkewistahaw Landing Infrastructure Construction
Kahkewistahaw IR 72A - 2 -
Great Sandhills Railway Switching Operation at North West Terminal Project - Revised Design
1 kilometre east of Unity, Saskatchewan -
Great Sandhills Railway Switching Operation at North West Terminal Project
1 kilometre east of Unity -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MINISTIKWAN I.R. 161 (Tower 3) -
Ministikwan Subdivision Development
Ministikwan IR 161 -
Regional Psychiatric Centre
Regional Psychiatric Centre -
Ministikwan Lake Cree Nation - Solid Waste Transfer Station
Ministikwan IR161 -
Muskeg Lake Cree Nation - Construction of commercial/retail building
ASIMAKANISEEKAN ASKIY 102A -
MEDA 324 kW Solar Farm
Muskoday IR 99 -
Onion Lake Cree Nation Aquatic Centre Project
Onion Lake Cree Nation Aquatic Centre Project -
125 Aspen Place Infrastructure & New Building Construction Project
125 Aspen Place, Saskatoon -
Tway National Wildlife Area Water Control Structure Re-naturalization Project.
Tway National Wildlife Area -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
WATERHEN I.R. 130 -
Weepuskow Sahgaiechan IR 165D Timber Harvest Plan 2020-21
WEPUSKOW SAHGAIECHAN IR 165 D -
Powwow Arbour Construction
Pierceland -
Construction and Installation of a Clear Span Acrow Panel Bridge at 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Gas Station Construction Saskatoon
Kahkewistahaw Indian Reserve No. 72A-2 -
Grasswoods Reserve Septage Receiving Station, Retention Pond and Final Disposal to City of Saskatoon Forcemain
Grasswoods IR 192J -
North Creek Trail Realignment
17 Wing Detachment - Dundurn's Range and Training Area -
Tower Alteration for James Smith Cree Nation Justice & Policing communication system on James Smith Reserve No. 100
James Smith Cree Nation -
Whitecap Dakota First Nation Community Drainage
Whitecap Dakota First Nation No 94 -
Buffalo Berry Culvert Work
Whitecap IR #94 -
Whitecap Dakota First Nation Sewage Pumping Station 3
Whitecap Dakota First Nation No 94 -
Dakota Springs Spa
Whitecap IR #94 -
Whitecap Dakota First Nation Subdivision Stage 4
NE 35-33-6 W3M -
Upgrade Woods Trail - 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
RW-4851 Authorization to Construct and Operate a Right of Way for a gas pipeline
Frog Lake First Nation -
Carry the Kettle First Nation - Ag Permit - D. Gorniak -2019-2021
Carry The Kettle Indian Reserve 76-9 & 79-42 -
OS-7250 Authorization to Construct and Operate a Surface Lease for an access road and a multi-well pad
Frog Lake First Nation -
Waskonaman Hill Gravel Project
Frog Lake First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
LA PLONGE I.R. 192 -
Star-Orion South Diamond Project
Fort à la Corne Provincial Forest -
Highway 165 Grade Raise near Beauval, SK
Beauval, SK -
OS-6825 Authorization to Construct an access road and a Surface Lease Extension and Operate a Multi-well oil pad
OS-6825 -
Woods Trail Intersection Realignment
17 Wing Detachment Dundurn's Range and Training Area -
Replacement of the Fuel Transfer Station and Fuel Tank Systems
17 Wing Detachment Dundurn -
Install Security Fence along Pryor Road at 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
CANOE LAKE I.R. 165 (Tower 3) -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
CANOE LAKE I.R. 165 (Tower 2) -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
CANOE LAKE I.R. 165 (Tower 1) -
Frog Lake First Nation Water System Project
Frog Lake First Nation -
Frog Lake Waste Management Transfer Station
Frog Lake First Nation -
Frog Lake First Nation Water System Project
Frog Lake First Nation -
Frog Lake First Nation Landfill Cap Construction
Frog Lake First Nation