Montreal Lake Cree Nation Bittern Lake Subdivision - Phase II
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Montreal Lake Cree Nation is proposing to construct Phase II of a new subdivision development. The project will consist of construction of 102 lots on 30 ha of land. The project includes underground utility installations, site roadways and ditching, and lot grading. The proposed site is located approximately 2 km southeast of the community core area, and borders the existing phase 1 Bittern Lake subdivision.
The existing land use of the proposed subdivision site is classified as natural state, and therefore, site preparation activities will consists of vegetative clearing and topsoil stripping. Erosion control measures will be implemented as required during and after construction until adequate vegetative growth has re-established. All anticipated waste generation from construction activities will be responsibly handled and disposed of to designated off-reserve facilities. Procedures will also be followed to limit the amounts of waste generated during construction, and mitigate any potential contamination pathway for petroleum products, and the site will be equipped with spill kits in which all operators will be familiar with proper spill response procedures.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1 | Notice of Intent -Start of Public Comment Period | - | June 17, 2024 |
Contacts
ISC-SKENVIndigenous Services Canada
Alvin Hamilton Building, 1783 Hamilton Street
Regina, Saskatchewan S4P 2B6
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca
-
Location
- Montreal Lake IR 106B (Saskatchewan)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
In progress -
Start Date
2024-06-17 -
Proponent
Montreal Lake Cree Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
88643
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Prince Albert Grand Council (PAGC) Women's Shelter
Montreal Lake -
MLCN Montreal LK East Lagoon
Montreal Lake IR 106 -
Muskoday Convenience Store Remediation
Muskoday First Nation -
La Ronge Area Peat Harvesting Project
La Ronge -
Boundary Bog Trail Boardwalk Project
Prince Albert National Park -
Star-Orion South Diamond Mine Project
Fort à la Corne Provincial Forest -
SaskPower Underground Cable Install at Kapasiwin Bungalows
Prince Albert National Park -
SaskPower Cable Installation to Kapasiwin Cabins
Prince Albert National Park -
SaskPower Transformer Replacement and line trenching at Kapasiwin Bungalows
Prince Albert National Park -
SaskPower New U/G Cable and Transformer at Kapasawin Bungalows
Prince Albert National Park of Canada -
SaskPower Line Trenching at Operations Compound
Prince Albert National Park -
SaskPower Hesje Light Pole
Prince Albert National Park -
SaskPower replacement of 8 power poles in Prince Albert National Park
Prince Albert National Park -
Rabbit Creek Wildfire Reclamation
Prince Albert National Park -
SaskPower Stabilization of 3 Power Poles in Waskesiu
Prince Albert National Park -
SaskPower Pole Replacement near Rec Hall
Prince Albert National Park -
Crean Channel Modification
Prince Albert National Park -
SaskPower Trenching at Anglin Lake Dam (MPE Engineering)
Prince Albert National Park -
SaskPower Pole Replacement in Prince Albert National Park - east of Sandy Lake
Prince Albert National Park -
SaskPower Pole Replacement near Halkett (Sandy) Lake
Prince Albert National Park -
Carry the Kettle First Nation - Ag Permit - D. Gorniak -2019-2021
Carry The Kettle Indian Reserve 76-9 & 79-42 -
SaskPower Poles Replacement in Prince Albert National Park near south west boundary.
Prince Albert National Park -
SaskPower Ground Grid Replacement near MacKenzie Creek
Prince Albert National Park -
Montreal Lake Cree Nation & Little Red River Solid Waste Transfer Station & Decommissioning
Montreal Lake IR 106B -
Montreal Lake Cree Nation Little Red River Water Treatment Plant Upgrade Project
Montreal Lake Cree Nation -
SaskPower Ground Mount Transformer Installation Red Deer Campground
Prince Albert National Park of Canada -
Montreal Lake IR 106B Gasification
Montreal Lake IR 106B -
SaskPower Transformer Salvage
Prince Albert National Park -
Biocontrol of Yellow Toadflax using Rhinusa pilosa, in Prince Albert National Park
Prince Albert National Park -
James Smith Cree Nation Peonan Creek Crossing
James Smith Cree Nation -
James Smith Cree Nation Subdivision Stage 4
James Smith Cree Nation -
Tower Alteration for James Smith Cree Nation Justice & Policing communication system on James Smith Reserve No. 100
James Smith Cree Nation -
Sturgeon River Pedestrian Bridge
Sturgeon Lake Indian Reservation No.101 -
Sturgeon Lake First Nation Children's Playgrounds
Park location 3 -
Sturgeon Lake First Nation Subdivision
Sturgeon Lake IR 101A -
Hunters Lake Trail Rehabilitation
Prince Albert National Park -
Sturgeon Lake First Nation - East Lagoon Expansion
Sturgeon Lake IR 101 -
Peter Ballantyne Cree Nation Timber Harvest on IR 207
Pisiwiminiwatim IR 207 -
Fenceline Replacement - Prince Albert Training Area, Saskatchewan
DND Prince Albert Training Area -
Sturgeon Lake First Nation Children's Playgrounds
Park location 2 -
Muskoday First Nation Sewage Lagoon Upgrade
Muskoday First Nation -
Kapasiwin Bungalows Installation of Deep Water and Sewer Infrastructure
Prince Albert National Park -
Potential Regional Assessment of a Western Energy Corridor
near Prince Albert -
Potential Regional Assessment of a Western Energy Corridor from Alberta to Manitoba
Prince Albert -
Zagime Anishinabëk RV Trailer Park
Sakimay IR 74 -
Piapot First Nation Prince Albert Urban Gas Bar & Convenience Store
Piapot IR 75 -
Lac La Ronge Indian Band Clean-up of Solid Waste Disposal Sites
Sucker River IR 156C, Stanley IR 157, Morin Lake IR 217, Little Red River IR 106C, Lac La Ronge IR 156 and Grandmother's Bay IR 219 -
Sturgeon Lake First Nation - Renovation for gas bar and convenience store
Sturgeon Lake First Nation - Prince Albert Strip Mall -
Sturgeon Lake First Nation Children's Playgrounds
Park location 1 -
Muskoday First Nation - Drainage Improvements Phase 1
Muskoday First Nation Reserve -
On Hold - Aggregate Business Development Plan - Phase 2, Sturgeon Lake First Nation I.R. 101
Sturgeon Lake IR 101 -
Muskoday First Nation - Community Access Road
Muskoday First Nation Reserve -
Muskoday First Nation - Construct Cultural Centre
Muskoday First Nation - Construct Cultural Centre -
MEDA 324 kW Solar Farm
Muskoday IR 99 -
Lac La Ronge Indian Band - Lac La Ronge 156 Lagoon Expansion
Lac La Ronge Indian Band -
Peter Ballantyne Child and Family Services Facility
Kistapinin IR 211 -
Saskatchewan Agriculture Drainage Network - Brooksby Drainage Network Project
30 kilometres northeast of Melfort -
Lac La Ronge Indian Band Wellness Healing and Recovery Center
Lac La Ronge IR No. 156 -
SaskPower Pole Mount Transformer Replacement for Hawood
Prince Albert National Park -
Hall Lake Stage 3 Subdivision
Morin Lake I.R. No. 217 -
Deschambault Nursing Station
Deschambault Lake Indian Settlement -
Beaver dam and lodge removal
Prince Albert National Park -
Deschambault Lake Sewage Pumping Station Upgrades
Peter Ballantyne Cree Nation Kimosom Pwatinahk Indian Reserve No. 203 -
Deschambault Lake Sewage Pumping Station Upgrades
Peter Ballantyne Cree Nation Kimosom Pwatinahk Indian Reserve No. 203 -
Deschambault Lake Diesel Generating Station
Kimosum Pwatinahk IR 203 -
Lac La Ronge Indian Band Morin Lake Lagoon and Sewage Pumping Station Upgrade
SE-33-70-26-2 and SW-34-70-26-2 -
Red Earth River Dike Extension
Red Earth IR 29A -
Red Earth Cree Nation Shoreline Reinforcement
Red Earth Cree Nation Carrot River 29A -
Sucker River Water Treatment Plant Upgrade
Sucker River IR 156C -
Lac La Ronge Indian Band - Sucker River 156C Sewage Pumping System Upgrades
Lac La Ronge Indian Band - Sucker River 156C -
Red Earth Cree Nation Carrot River and Natacam Lagoon Upgrades
Red Earth Cree Nation -
Red Earth Water Supply and Treatment Project
Red Earth First Nation -
Lac La Ronge Indian Band Stanley Mission Reserve No. 157 Solid Waste Transfer Station
Lac La Ronge Provincial Park -
Solid Waste Transfer Station - Stanley Mission
La Ronge Provincial Park -
Tway National Wildlife Area Water Control Structure Re-naturalization Project.
Tway National Wildlife Area -
Ahtahkakoop South Subdivision Phase 1
Ahtakakoop Cree Nation -
Ahtahkakoop Powwow Grounds & Access Road
Ahtahkakoop Cree Nation -
Ahtahkakoop Cree Nation Water Treatment Plant
Ahtahkakoop IR 104 -
Cree Nation Treatment Haven Replacement
Ahtakakoop First Nation -
Ahtahkakoop Cree Nation Lagoon and Sewage Pumping Station
Ahtahkakoop IR #104 -
Big River First Nation Arena Build Project
Big River IR 118 -
Kinistin Saulteaux Nation Sewage Lagoon Expansion
Kinistin IR No. 91 -
Mistahi Sipiy Child and Family Service and Big River First Nation Prevention Building
Big River First Nation -
Lac La Ronge Morin Lake Solid Waste Transfer Station & Decommissioning
Morin Lake IR 217 -
Cumberland House Cree Nation Water Treatment Plant Upgrade
Cumberland House Cree Nation -
Cumberland House Cree Nation Fire Hall & Equipment
Cumberland House Cree Nation -
Mistawasis Nehiyawak Lagoon Upgrades
Mistawasis Nêhiyawak -
Kinistin Saulteaux Nation Barrier River Bridge Replacement
Kinistin Saulteaux Nation -
Mistawasis Nehiyawak Rural Transit Solutions
Mistawasis -
Mistawasis Nêhiyawak Lake - Traditional Lands, Gathering Space
Mistawasis Nêhiyawak Lake -
Mistawasis Nêhiyawak Community Center
Mistawasis -
Beardy's & Okemasis Cree Nation Stage 4 Subdivision
Beardy's & Okemasis Cree Nation -
Construction of Ready to Move (RTM) buildings at Willow Cree Healing Lodge
Willow Cree Healing Lodge -
Fuel Reduction Program for Batoche National Historic Site
Batoche National Historic Site -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 3 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 2 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Point of presence -
Batoche Drainage Improvement
Grasslands National Park -
Beardy's and Okemasis Cree Nation Water Treatment Plant Upgrades Project
Beardy's and Okemasis Cree Nation -
Remediation of One Arrow First Nation River Lot 62
One Arrow IR 95 -
Big River First Nation Reserve Drainage Re-Establishment
Big River First Nation -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 1 -
Pelican Narrows Sewage Pumping Station 4 and 5 Replacement
Pelican Narrows - SPS No.4 S25 T71 R7 W2M; SPS No. 5 S30 T71 R6 W2M -
Wharf Reconstruction - Missinipe, SK - Winter 2021-22
Missinipe -
Kawacatoose First Nation Subdivision
Kawacatoose IR 88 -
Grandmothers Bay Lagoon and Sewage Pumping Station Upgrades
Grandmother's Bay 219 -
Solid Waste Transfer Station - Grandmother's Bay
Grandmother's Bay IR 219 -
Cumberland House Cree Nation On-reserve Timber Harvesting and Wildfire Fuel Break
Cumberland House Cree Nation IR 20 -
Dore Lake Wharf Removal
Dore Lake -
RM Shellbrook Gravel Permit
Sturgeon Lake First Nation -
Shellbrook Sand & Gravel Permit
Sturgeon Lake IR 101 -
Lac Eauclaire Timber Harvest Program
Pelican Lake IR 191-C -
Witchekan Lake Subdivision
Witchekan Lake IR 161 -
Sturgeon Weir Solid Waste Transfer Station
Title No. 117312140, Parcel No. 135289660, Blk/Par F-Plan 96PA11458 Ext 0 in NE 13-61-30-W1M -
Pelican Lake Timber Harvesting Plan
Chitek Lake IR 191 -
Pelican Lake Timber Harvesting Plan 2021-22
Chitek Lake IR 191 & 191A -
Witchekan Lake First Nation Solid Waste Transfer Station
Witchekan Lake First Nation -
Beardy's & Okemasis Cree Nation Sewage Lagoon and Pumping Station Upgrades
Beardy's and Okemasis IR No. 96 & 97 -
Pelican Lake Bioenergy Project
Pelican Lake First Nation -
Yellow Quill First Nation Subdivision Stage 2
Yellow Quill IR 90 -
Pelican Lake Farms - farm site development
Pelican Lake IR 191-B -
Pelican Lake First Nation 191 A, B, C, D Gasification Project
Pelican Lake First Nation 191 A, B, C, D -
Pelican Lake North Sewage Lagoon Expansion and Upgrades
Chitek Lake IR 191