Muskoday First Nation - Community Access Road
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The Proposed Project
Construction of a new second access road to the community. Proposed roadway is approximately 1.8km in length, connecting Coxby Road to the existing core area subdivision area. Activities to include: topsoil stripping, excavation of drainage ditches and construction of roadway subgrade, base gravel installations, culvert installations, street lights, topsoil replacement and landscaping, seeding, traffic gravel placement.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination for the Muskoday First Nation Community Access Road | - | February 27, 2024 |
| 1 | Public Comment Period on Intent to Make a Determination | - | February 28, 2023 |
Contacts
ISC-SKENVIndigenous Services Canada
Alvin Hamilton Building, 1783 Hamilton Street
Regina, Saskatchewan S4P 2B6
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Muskoday First Nation Reserve (Saskatchewan)
-
Nature of Activity
- Highways and Roads
-
Assessment Status
Completed -
Start Date
2023-02-28 -
Proponent
Muskoday First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
84373
Nearby assessments
...within 200 kilometres-
Muskoday First Nation - Drainage Improvements Phase 1
Muskoday First Nation Reserve -
Muskoday First Nation - Construct Cultural Centre
Muskoday First Nation - Construct Cultural Centre -
Muskoday First Nation Subdivision Development
Muskoday First Nation I.R. 99 -
Piapot First Nation Prince Albert Urban Gas Bar & Convenience Store
Piapot IR 75 -
Muskoday First Nation Sewage Lagoon Upgrade
Muskoday First Nation -
Muskoday First Nation Booster Station Upgrades
Muskoday First Nation -
MEDA 324 kW Solar Farm
Muskoday IR 99 -
Blanket Permit - SaskPower - Kistapinan Indian Reserve No.211
Kistapinan Indian Reserve No. 211 -
Peter Ballantyne Child and Family Services Facility
Kistapinin IR 211 -
Blanket Permit - SaskEnergy - Northern Lights Indian Reserve No. 220
Northern Lights Indian Reserve No. 220 -
Northern Lights Casino Expansion and Renovation
Northern Lights Indian Reserve No.220 -
Kistaphinanihk Office Building
Kistaphinanihk IR No. 231 -
Yuasni Tipi Lodge Lease
Wahpeton Dakota Nation -
Potential Regional Assessment of a Western Energy Corridor
near Prince Albert -
Potential Regional Assessment of a Western Energy Corridor from Alberta to Manitoba
Prince Albert -
Peter Ballantyne Child and Family Services Inc. Central Office Extension
Chief Joseph Custer Reserve -
Prince Albert Administration Office Addition
Chief Joseph Custer Reserve -
Peter Ballantyne Cree Nation Parcel E Development
CHIEF JOSEPH CUSTER RESERVE -
Parcel E Sublease - Eagle Ridge Residential Building
Parcel E of Chief Joseph Custer Reserve -
Sturgeon Lake First Nation - Renovation for gas bar and convenience store
Sturgeon Lake First Nation - Prince Albert Strip Mall -
Fenceline Replacement - Prince Albert Training Area, Saskatchewan
DND Prince Albert Training Area -
Wahpeton Dakota Nation Sewage Lagoon Expansion
WAHPATON INDIAN RESERVE NO. 94A -
Wahpeton Dakota Nation New School
Wahpeton Dakota Nation -
New Fibre Installation - Central and Southeastern SK
Project site 8: WAHPATON I.R. 94A -
New Fibre Installation - Central and Southeastern SK
Project site 2: Wahpaton 94A -
Wahpeton Roads Upgrades
Wahpeton Dakota Nation -
Tway National Wildlife Area Water Control Structure Re-naturalization Project.
Tway National Wildlife Area -
James Smith Cree Nation Peonan Creek Crossing
James Smith Cree Nation -
James Smith Miyo-Pimatisiwin Wellness Centre
JAMES SMITH INDIAN RESERVE NO. 100 -
James Smith Cree Nation Solid Waste Transfer Station
James Smith Cree Nation -
Tower Alteration for James Smith Cree Nation Justice & Policing communication system on James Smith Reserve No. 100
James Smith Cree Nation -
Upgrade Single Tower & New Fibre Installation
Project site 8: Central East region - James Smith -
James Smith Cree Nation Headstart and Daycare
JAMES SMITH INDIAN RESERVE NO. 100 -
James Smith Cree Nation Subdivision Stage 4
James Smith Cree Nation -
Muskoday Convenience Store Remediation
Muskoday First Nation -
Upgrade Single Tower & New Fibre Installation
Project site 3: North East region - One Arrow -
Sturgeon Lake First Nation - East Lagoon Expansion
Sturgeon Lake IR 101 -
Blanket Permit - SaskEnergy - Gasification of Sturgeon Lake Indian Reserve No. 101
Sturgeon Lake Indian Reserve No. 101 -
Sturgeon Lake First Nation Subdivision
Sturgeon Lake IR 101A -
The Lac La Ronge Indian Band Little Red River Water Upgrades
LITTLE RED RIVER 106C -
Sturgeon River Pedestrian Bridge
Sturgeon Lake Indian Reservation No.101 -
Sturgeon Lake First Nation Children's Playgrounds
Park location 3 -
Upgrade Single Tower & New Fibre Installation
Project site 6: North East region - Sturgeon Lake -
Phase 2 - Sturgeon Lake First Nation Active Transportation Network
Phase 2 - Sturgeon Lake First Nation Active Transportation Network -
Kapasiwin Bungalows Installation of Deep Water and Sewer Infrastructure
Prince Albert National Park -
Sturgeon Lake First Nation Children's Playgrounds
Park location 2 -
Oskâyak Miyoayâwin Youth Learning Centre
STURGEON LAKE INDIAN RESERVE NO. 101 -
Sturgeon Lake First Nation Child and Family Service Centre
STURGEON LAKE INDIAN RESERVE NO. 101 -
Sturgeon Lake First Nation Children's Playgrounds
Park location 1 -
Star-Orion South Diamond Mine Project
Fort à la Corne Provincial Forest -
On Hold - Aggregate Business Development Plan - Phase 2, Sturgeon Lake First Nation I.R. 101
Sturgeon Lake IR 101 -
Remediation of One Arrow First Nation River Lot 62
One Arrow IR 95 -
Fuel Reduction Program for Batoche National Historic Site
Batoche National Historic Site -
New Fibre Installation - Central and Southeastern SK
Project site 9: LITTLE RED RIVER I.R. 106C -
Batoche Drainage Improvement
Grasslands National Park -
Willow Cree Healing Lodge - Construction of Ready to Move (RTM) Buildings
Willow Cree Healing Lodge -
Upgrade Single Tower & New Fibre Installation
Project site 4: North East region - Montreal Lake -
Montreal Lake Cree Nation & Little Red River Solid Waste Transfer Station & Decommissioning
Montreal Lake IR 106B -
Montreal Lake Cree Nation Little Red River Water Treatment Plant Upgrade Project
Montreal Lake Cree Nation -
Beardy's & Okemasis Cree Nation Stage 4 Subdivision
Beardy's & Okemasis Cree Nation -
Montreal Lake IR 106B Gasification
Montreal Lake IR 106B -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 3 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 2 -
Beardy's and Okemasis Cree Nation Water Treatment Plant Upgrades Project
Beardy's and Okemasis Cree Nation -
New Fibre Installation - Central and Southeastern SK
Project site 3: One Arrow 95-1A -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Point of presence -
SaskPower Poles Replacement in Prince Albert National Park near south west boundary.
Prince Albert National Park -
Beardy's and Okemasis Cree Nation Solid Waste Removal and Landfill Decommissioning
Beardy's and Okemasis Cree Nation -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 1 -
SaskPower Ground Mount Transformer Installation Red Deer Campground
Prince Albert National Park of Canada -
Biocontrol of Yellow Toadflax using Rhinusa pilosa, in Prince Albert National Park
Prince Albert National Park -
SaskPower Ground Grid Replacement near MacKenzie Creek
Prince Albert National Park -
SaskPower Trenching at Anglin Lake Dam (MPE Engineering)
Prince Albert National Park -
SaskPower Pole Replacement near Halkett (Sandy) Lake
Prince Albert National Park -
Beaver dam and lodge removal
Prince Albert National Park -
Zagime Anishinabëk RV Trailer Park
Sakimay IR 74 -
SaskPower Pole Replacement in Prince Albert National Park - east of Sandy Lake
Prince Albert National Park -
SaskPower Transformer Salvage
Prince Albert National Park -
Saskatchewan Agriculture Drainage Network - Brooksby Drainage Network Project
30 kilometres northeast of Melfort -
SaskPower Pole Mount Transformer Replacement for Hawood
Prince Albert National Park -
Beardy's & Okemasis Cree Nation Sewage Lagoon and Pumping Station Upgrades
Beardy's and Okemasis IR No. 96 & 97 -
Hunters Lake Trail Rehabilitation
Prince Albert National Park -
Mistawasis Nehiyawak Lagoon Upgrades
Mistawasis Nêhiyawak -
Witchekan Lake First Nation Youth Lodge
Witchekan Lake Indian Reserve No. 117 -
Mistawasis Nêhiyawak Community Center
Mistawasis -
Mistawasis Nehiyawak Rural Transit Solutions
Mistawasis -
Upgrade Single Tower & New Fibre Installation
Project site 5: North East region - Mistawasis -
Mistawasis Nêhiyawak Lake - Traditional Lands, Gathering Space
Mistawasis Nêhiyawak Lake -
New Fibre Installation - Central and Southeastern SK
Project site 5: MUSKEG LAKE I.R. 102 -
Boundary Bog Trail Boardwalk Project
Prince Albert National Park -
Kawacatoose First Nation Subdivision
Kawacatoose IR 88 -
Ahtahkakoop Powwow Grounds & Access Road
Ahtahkakoop Cree Nation -
Kinistin Saulteaux Nation Barrier River Bridge Replacement
Kinistin Saulteaux Nation -
SaskPower Line Trenching at Operations Compound
Prince Albert National Park -
SaskPower Pole Replacement near Rec Hall
Prince Albert National Park -
Parks Canada ski trail reconfiguration in Waskesiu Lake, SK
Prince Albert National Park -
Rabbit Creek Wildfire Reclamation
Prince Albert National Park -
SaskPower replacement of 8 power poles in Prince Albert National Park
Prince Albert National Park -
Kinistin Solid Waste Transfer Station
Kinistin Saulteaux Nation -
Kinistin Saulteaux Nation Sewage Lagoon Expansion
Kinistin IR No. 91 -
Red Deer Campground Electrical Upgrades
Prince Albert National Park -
Ahtahkakoop Cree Nation Water Treatment Plant
Ahtahkakoop IR 104 -
SaskPower Stabilization of 3 Power Poles in Waskesiu
Prince Albert National Park -
SaskPower Hesje Light Pole
Prince Albert National Park -
New Fibre Installation - Central and Southeastern SK
Project site 7: AHTAHKAKOOP I.R. 104 -
Ahtahkakoop Cree Nation New School
AHTAHKAKOOP INDIAN RESERVE NO. 104 -
Cree Nation Treatment Haven Replacement
Ahtakakoop First Nation -
Ahtahkakoop Cree Nation Lagoon and Sewage Pumping Station
Ahtahkakoop IR #104 -
SaskPower Underground Cable Install at Kapasiwin Bungalows
Prince Albert National Park -
SaskPower Cable Installation to Kapasiwin Cabins
Prince Albert National Park -
SaskPower Transformer Replacement and line trenching at Kapasiwin Bungalows
Prince Albert National Park -
SaskPower New U/G Cable and Transformer at Kapasawin Bungalows
Prince Albert National Park of Canada -
Ahtahkakoop Cree Nation Debden Road Upgrades
AHTAHKAKOOP INDIAN RESERVE NO. 104 -
Repair of the Waskesiu River riffle weir
Prince Albert National Park of Canada -
Prince Albert Grand Council (PAGC) Women's Shelter
Montreal Lake -
Montreal Lake RCMP New Detachment
Montreal Lake -
Big River First Nation Reserve Drainage Re-Establishment
Big River First Nation -
MLCN Montreal LK East Lagoon
Montreal Lake IR 106 -
Ahtahkakoop South Subdivision Phase 1
Ahtakakoop Cree Nation -
Lac La Ronge Morin Lake Solid Waste Transfer Station & Decommissioning
Morin Lake IR 217 -
Montreal Lake Cree Nation Bittern Lake Subdivision - Phase II
Montreal Lake IR 106B -
Lucky Man Cree Nation Community Access Road
LUCKY MAN RESERVE -
Lucky Man Cree Nation Access Road Design and Construction
Lucky Man Reserve -
New Fibre Installation - Central and Southeastern SK
Project site 4: Big River 118 -
Mistahi Sipiy Child and Family Service and Big River First Nation Prevention Building
Big River First Nation -
Big River First Nation Arena Build Project
Big River IR 118 -
Crean Channel Modification
Prince Albert National Park -
Outhouse relocation
Prince Albert National Park of Canada -
Big River First Nation Drainage Reestablishment Phase 1B
BIG RIVER INDIAN RESERVE NO. 118 -
Regional Psychiatric Centre - Removal of an Underground Storage Tank
Regional Psychiatric Centre -
Saskatoon Airport Solar - 1MW Project
1MW Ground Mounted Solar Facility -
125 Aspen Place Infrastructure & New Building Construction Project
125 Aspen Place, Saskatoon -
Saskatchewan Indian Institute of Technologies Hangar Expansion
Saskatchewan Indian Institute of Technologies -
Apron III infill
Saskatoon International Airport YXE -
General Aviation Hangars Development
Saskatoon International Airport YXE -
Muskeg Lake Cree Nation - Construction of commercial/retail building
ASIMAKANISEEKAN ASKIY 102A -
45th & Airport Holdings Ltd. Restaurant and Gas Station Commercial Development
Restaurant/Gas Station Commercial Development -
Nutrien Aviation Hangar Expansion
STARS Saskatoon Base -
Kahkewistahaw First Nation - Mamawi Business Center
Kahkewistahaw No. 72A -
Kahkewistahaw Landing Infrastructure Construction
Kahkewistahaw IR 72A - 2 -
Gas Station Construction Saskatoon
Kahkewistahaw Indian Reserve No. 72A-2 -
Grasswoods Reserve Septage Receiving Station, Retention Pond and Final Disposal to City of Saskatoon Forcemain
Grasswoods IR 192J -
Aspen Power Station Project
Lanigan -
SaskPower - 2E-33 Mullingar Rural Rebuild
Mosquito Grizzly Bear's Head Lean Man TLE Indian Reserve -
Witchekan Lake Subdivision
Witchekan Lake IR 161 -
Yellow Quill First Nation Subdivision Stage 2
Yellow Quill IR 90 -
Witchekan Lake First Nation Solid Waste Transfer Station
Witchekan Lake First Nation -
North Creek Trail Realignment
17 Wing Detachment - Dundurn's Range and Training Area -
Yellow Quill First Nation Wastewater Infrastructure Upgrades
Yellow Quill IR 90 -
Witchekan Lake First Nation Cultural Centre
Witchekan Lake Indian Reserve No. 117 -
Witchekan Lake First Nation Sweat Lodge
Witchekan Lake Indian Reserve No. 117 -
Woods Trail Bridge Replacement and Water Course Alteration – 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Construction and Installation of a Clear Span Acrow Panel Bridge at 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Yellow Quill First Nation New Subdivision
Yellow Quill IR 90 -
Replacement of the Fuel Transfer Station and Fuel Tank Systems
17 Wing Detachment Dundurn -
Install Security Fence along Pryor Road at 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Upgrade Woods Trail - 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Woods Trail Intersection Realignment
17 Wing Detachment Dundurn's Range and Training Area -
Magazine Area Recapitalization Canadian Forces Ammunition Depot (CFAD) - 17 Wing Detachment Dundurn
Canadian Forces Ammunition Depot Dundurn,17 Wing Detachment Dundurn -
Dakota Springs Spa
Whitecap IR #94 -
Whitecap Dakota First Nation Community Drainage
Whitecap Dakota First Nation No 94 -
Buffalo Berry Culvert Work
Whitecap IR #94 -
Whitecap Dakota Nation Virtual Health Hub
Whitecap Dakota First Nation No 94 -
Whitecap Dakota First Nation Multi-Use Trails
Whitecap Dakota First Nation Multi-Use Trails -
Whitecap Dakota First Nation Sewage Pumping Station 3
Whitecap Dakota First Nation No 94 -
Whitecap Dakota First Nation Subdivision Stage 4
NE 35-33-6 W3M -
Fishing Lake First Nation Sewage Pumping Station Upgrades
Fishing Lake First Nation -
Whitecap Dakota Nation Wellbeing Centre
Whitecap No. 94 -
Whitecap Dakota Nation Water Treatment Plant Upgrade & Wells Project
Whitecap Dakota First Nation No 94 -
Pelican Lake Bioenergy Project
Pelican Lake First Nation -
Pelican Lake Timber Harvesting Plan
Chitek Lake IR 191 -
Pelican Lake Timber Harvesting Plan 2021-22
Chitek Lake IR 191 & 191A -
Pelican Lake Farms - farm site development
Pelican Lake IR 191-B -
Pelican Lake First Nation 191 A, B, C, D Gasification Project
Pelican Lake First Nation 191 A, B, C, D -
Pelican Lake North Sewage Lagoon Expansion and Upgrades
Chitek Lake IR 191 -
Food Sovereignty Project- Bison and Elk Farms, and Community Gardens
Pelican Lake First Nation, near Leoville -
Walk Into History
Chitek Lake -
Upgrade Single Tower & New Fibre Installation
Project site 2: North East region - Chamakese Resort (Chitek Lake) -
Pelican Lake Child and Family Services Facility
Pelican Lake First Nation -
Pelican Lake First Nation - Quonset Addition
Chitek Lake IR 191 -
Pelican Lake First Nation Subdivision
CHITEK LAKE INDIAN RESERVE NO. 191 -
Lac Eauclaire Timber Harvest Program
Pelican Lake IR 191-C -
Pelican Lake Community Harvest Program Phase 2022-2024
Chitek Lake IR 191 -
Red Earth Cree Nation Carrot River and Natacam Lagoon Upgrades
Red Earth Cree Nation -
Red Earth Water Supply and Treatment Project
Red Earth First Nation -
Red Earth Road Assessment and Upgrades
Red Earth Cree Nation -
Red Earth Cree Nation Teacherage Replacement
Red Earth Cree Nation -
Red Earth Cree Nation Cultural Healing Center
Red Earth Cree Nation -
Red Earth Cree Nation Daycare and Head Start Building
Red Earth Cree Nation -
Red Earth River Dike Extension
Red Earth IR 29A -
Mihkoskiwakak Nehiyawak Walking Path to Healthy Living
Mihkoskiwakak Nehiyawak Walking Path to Healthy Living -
Red Earth Cree Nation Shoreline Reinforcement
Red Earth Cree Nation Carrot River 29A -
Upgrade Single Tower & New Fibre Installation
Project Site 1: Central East region - Red Earth No. 29 (51356) -
Red Earth Road Assessment and Upgrades
Red Earth Cree Nation -
Red Earth Sewage Pumping Station Upgrades
Red Earth Cree Nation -
Fishing Lake First Nation - Agricultural Permit - C. Fehr
Fishing Lake IR 89 -
Agricultural permit - Fishing Lake - C. Fehr #2
Fishing Lake IR 89 -
Fishing Lake First Nation Prevention Centre
FISHING LAKE INDIAN RESERVE NO. 89 -
Last Mountain Lake National Wildlife Area Water Control Structure Re-naturalization Project
Last Mountain Lake National Wildlife Area -
Carry the Kettle First Nation - Ag Permit - D. Gorniak -2019-2021
Carry The Kettle Indian Reserve 76-9 & 79-42 -
Solid Waste Transfer Station - Fishing Lake First Nation
Fishing Lake Indian Reserve 89 -
GL7 Phase 1 Transmission Rebuild Project (L007) / Saulteaux and Moosomin First Nations
Saulteaux IR 159G & Moosomin IR 112L -
Fishing Lake First Nation - Sewage Lagoon Expansion
Fishing Lake IR 89A -
La Ronge Area Peat Harvesting Project
La Ronge -
New (Multiple) Tower Construction
Poject site 5: Kawacatoose FN I.r. 88 -
Moosomin Road Repair and Drainage
Moosomin IR No. 112B -
Saulteaux First Nation Subdivision Development
Saulteaux Indian Reserve No. 159 -
Saulteaux First Nation Firehall and Vehicle Storage Facility
Saulteaux Indian Reserve Number 159 -
Saulteaux Fire Hall / Maintenance Facility
Saulteaux IR 159 -
New (Multiple) Tower Construction
Poject site 4: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 1: Kawacatoose FN I.r. 88 -
Kawacatoose First Nation Water Treatment Plant Upgrade and Expansion
Kawacatoose IR 88 -
New (Multiple) Tower Construction
Poject site 2: Kawacatoose FN I.r. 88 -
Last Mountain Lake National Wildlife Area Observation Tower II
Last Mountain Lake National Wildlife Area -
Shoal Lake Cree Nation New Subdivision
Shoal Lake Cree Nation -
Shoal Lake Cree Nation New Subdivision
Shoal Lake Indian Reserve No. 28A -
Shoal Lake Cree Nation Road Repair and Upgrades
SHOAL LAKE INDIAN RESERVE NO. 28A -
Shoal Lake Cree Nation Mini Mall Project
Shoal Lake Cree Nation -
New (Multiple) Tower Construction
Poject site 6: Kawacatoose FN I.r. 88 -
Upgrade Single Tower & New Fibre Installation
Project site 4: Central East region - Pakwaw Lake -
Shoal Lake Cree Nation Lagoon Upgrades
Shoal Lake Cree Nation -
Shoal Lake Cree Nation Teacherage Improvements
Shoal Lake Indian Reserve No. 28A -
New (Multiple) Tower Construction
Poject site 3: Kawacatoose FN I.r. 88 -
Saulteaux IR159 Timber Harvest Plan 2021-22
Saulteaux IR 159EE -
Thunderchild First Nation - Turtle Lake Site 115C WTP Process Waste Pond
Thunderchild IR 115C -
New (Multiple) Tower Construction
Poject site 8: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 7: Kawacatoose FN I.r. 88 -
Mosquito Grizzly Bear's Head Lean Man First Nation - Core Area Subdivision
Mosquito Grizzly Bear's Head Lean Man First Nation -
Saulteaux IR159 Timber Harvest Plan 2020-21
Saulteaux IR 159EE