MLCN Montreal LK East Lagoon
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Expansion of the existing East core sewage lagoon and decommissioning of the west core sewage lagoon. Existing 1.10ha primary lagoon cell being expanded with an additional 4.43ha primary lagoon cell. Existing 12,900 cu.m. primary lagoon cell being expanded with an additional 146,252 cu.m. lagoon storage cell. Approx. 5,750 lin.m. of new 150mm dia. DR17 sewage force main from SPS no.2 to the east lagoon. Approx. 500 lin.m. of new 200mm dia. PVC gravity sewer main from SPS no.1 to SPS no.2. The east lagoon expansion will consist of flagging of the existing forested area to indicate clearing extents, tree clearing within the extents marked by the Engineer, topsoil stripping, earthwork excavation/fill to construct the new lagoon cells, placement of 600mm thick compacted clay liner, topsoil replacement, seeding and erosion protection. New forcemain installation to convey sewage from the west core area to the east lagoon. Decommissioning of the existing west lagoon upon completion of the east lagoon expansion. Any construction waste generated from construction of the new lagoon, forcemain, sewage pumping stations will be transported to an off-site landfill by the Contractor.
Latest update
.
Participate
Key documents
| Document Number | Document Title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination for Montreal Lake East Lagoon | - | December 17, 2020 |
| 1 | Public Comment Period on Intent to Make a Determination | - | October 13, 2020 |
Contacts
ISC-SKENVIndigenous Services Canada
Alvin Hamilton Building, 1783 Hamilton Street
Regina, Saskatchewan S4P 2B6
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Montreal Lake IR 106 (Saskatchewan)
-
Nature of Activity
- Waste Management
-
Assessment Status
Completed -
Start Date
2021-05-02 -
Proponent
Montreal Lake Cree Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
81051
Nearby assessments
...within 200 kilometres-
Montreal Lake RCMP New Detachment
Montreal Lake -
Prince Albert Grand Council (PAGC) Women's Shelter
Montreal Lake -
Repair of the Waskesiu River riffle weir
Prince Albert National Park of Canada -
Boundary Bog Trail Boardwalk Project
Prince Albert National Park -
SaskPower Cable Installation to Kapasiwin Cabins
Prince Albert National Park -
SaskPower Underground Cable Install at Kapasiwin Bungalows
Prince Albert National Park -
SaskPower Transformer Replacement and line trenching at Kapasiwin Bungalows
Prince Albert National Park -
SaskPower New U/G Cable and Transformer at Kapasawin Bungalows
Prince Albert National Park of Canada -
SaskPower Hesje Light Pole
Prince Albert National Park -
Parks Canada ski trail reconfiguration in Waskesiu Lake, SK
Prince Albert National Park -
SaskPower Stabilization of 3 Power Poles in Waskesiu
Prince Albert National Park -
SaskPower Line Trenching at Operations Compound
Prince Albert National Park -
SaskPower replacement of 8 power poles in Prince Albert National Park
Prince Albert National Park -
Rabbit Creek Wildfire Reclamation
Prince Albert National Park -
SaskPower Pole Replacement near Rec Hall
Prince Albert National Park -
Crean Channel Modification
Prince Albert National Park -
Outhouse relocation
Prince Albert National Park of Canada -
SaskPower Trenching at Anglin Lake Dam (MPE Engineering)
Prince Albert National Park -
SaskPower Pole Replacement in Prince Albert National Park - east of Sandy Lake
Prince Albert National Park -
SaskPower Pole Replacement near Halkett (Sandy) Lake
Prince Albert National Park -
SaskPower Transformer Salvage
Prince Albert National Park -
Hunters Lake Trail Rehabilitation
Prince Albert National Park -
SaskPower Ground Grid Replacement near MacKenzie Creek
Prince Albert National Park -
SaskPower Poles Replacement in Prince Albert National Park near south west boundary.
Prince Albert National Park -
SaskPower Ground Mount Transformer Installation Red Deer Campground
Prince Albert National Park of Canada -
Biocontrol of Yellow Toadflax using Rhinusa pilosa, in Prince Albert National Park
Prince Albert National Park -
Montreal Lake Cree Nation & Little Red River Solid Waste Transfer Station & Decommissioning
Montreal Lake IR 106B -
Montreal Lake IR 106B Gasification
Montreal Lake IR 106B -
Montreal Lake Cree Nation Little Red River Water Treatment Plant Upgrade Project
Montreal Lake Cree Nation -
Upgrade Single Tower & New Fibre Installation
Project site 4: North East region - Montreal Lake -
New Fibre Installation - Central and Southeastern SK
Project site 9: LITTLE RED RIVER I.R. 106C -
The Lac La Ronge Indian Band Little Red River Water Upgrades
LITTLE RED RIVER 106C -
Zagime Anishinabëk RV Trailer Park
Sakimay IR 74 -
Montreal Lake Cree Nation Bittern Lake Subdivision - Phase II
Montreal Lake IR 106B -
Muskoday Convenience Store Remediation
Muskoday First Nation -
SaskPower Pole Mount Transformer Replacement for Hawood
Prince Albert National Park -
Sturgeon River Pedestrian Bridge
Sturgeon Lake Indian Reservation No.101 -
Upgrade Single Tower & New Fibre Installation
Project site 6: North East region - Sturgeon Lake -
Sturgeon Lake First Nation Children's Playgrounds
Park location 3 -
Sturgeon Lake First Nation Subdivision
Sturgeon Lake IR 101A -
Sturgeon Lake First Nation - East Lagoon Expansion
Sturgeon Lake IR 101 -
Phase 2 - Sturgeon Lake First Nation Active Transportation Network
Phase 2 - Sturgeon Lake First Nation Active Transportation Network -
Carry the Kettle First Nation - Ag Permit - D. Gorniak -2019-2021
Carry The Kettle Indian Reserve 76-9 & 79-42 -
Oskâyak Miyoayâwin Youth Learning Centre
STURGEON LAKE INDIAN RESERVE NO. 101 -
Sturgeon Lake First Nation Children's Playgrounds
Park location 2 -
Blanket Permit - SaskEnergy - Gasification of Sturgeon Lake Indian Reserve No. 101
Sturgeon Lake Indian Reserve No. 101 -
Kapasiwin Bungalows Installation of Deep Water and Sewer Infrastructure
Prince Albert National Park -
Sturgeon Lake First Nation Children's Playgrounds
Park location 1 -
On Hold - Aggregate Business Development Plan - Phase 2, Sturgeon Lake First Nation I.R. 101
Sturgeon Lake IR 101 -
Sturgeon Lake First Nation Child and Family Service Centre
STURGEON LAKE INDIAN RESERVE NO. 101 -
Witchekan Lake First Nation Youth Lodge
Witchekan Lake Indian Reserve No. 117 -
Beaver dam and lodge removal
Prince Albert National Park -
New Fibre Installation - Central and Southeastern SK
Project site 2: Wahpaton 94A -
New Fibre Installation - Central and Southeastern SK
Project site 8: WAHPATON I.R. 94A -
Wahpeton Dakota Nation New School
Wahpeton Dakota Nation -
Wahpeton Roads Upgrades
Wahpeton Dakota Nation -
Wahpeton Dakota Nation Sewage Lagoon Expansion
WAHPATON INDIAN RESERVE NO. 94A -
Ahtahkakoop South Subdivision Phase 1
Ahtakakoop Cree Nation -
Fenceline Replacement - Prince Albert Training Area, Saskatchewan
DND Prince Albert Training Area -
Yuasni Tipi Lodge Lease
Wahpeton Dakota Nation -
La Ronge Area Peat Harvesting Project
La Ronge -
Potential Regional Assessment of a Western Energy Corridor from Alberta to Manitoba
Prince Albert -
Potential Regional Assessment of a Western Energy Corridor
near Prince Albert -
Sturgeon Lake First Nation - Renovation for gas bar and convenience store
Sturgeon Lake First Nation - Prince Albert Strip Mall -
Prince Albert Administration Office Addition
Chief Joseph Custer Reserve -
Peter Ballantyne Child and Family Services Inc. Central Office Extension
Chief Joseph Custer Reserve -
Peter Ballantyne Cree Nation Parcel E Development
CHIEF JOSEPH CUSTER RESERVE -
Ahtahkakoop Cree Nation Debden Road Upgrades
AHTAHKAKOOP INDIAN RESERVE NO. 104 -
Big River First Nation Arena Build Project
Big River IR 118 -
Mistahi Sipiy Child and Family Service and Big River First Nation Prevention Building
Big River First Nation -
Blanket Permit - SaskPower - Kistapinan Indian Reserve No.211
Kistapinan Indian Reserve No. 211 -
Peter Ballantyne Child and Family Services Facility
Kistapinin IR 211 -
New Fibre Installation - Central and Southeastern SK
Project site 4: Big River 118 -
Ahtahkakoop Powwow Grounds & Access Road
Ahtahkakoop Cree Nation -
Lac La Ronge Morin Lake Solid Waste Transfer Station & Decommissioning
Morin Lake IR 217 -
Big River First Nation Drainage Reestablishment Phase 1B
BIG RIVER INDIAN RESERVE NO. 118 -
Cree Nation Treatment Haven Replacement
Ahtakakoop First Nation -
Ahtahkakoop Cree Nation Water Treatment Plant
Ahtahkakoop IR 104 -
New Fibre Installation - Central and Southeastern SK
Project site 7: AHTAHKAKOOP I.R. 104 -
Muskoday First Nation Sewage Lagoon Upgrade
Muskoday First Nation -
Ahtahkakoop Cree Nation Lagoon and Sewage Pumping Station
Ahtahkakoop IR #104 -
Muskoday First Nation Subdivision Development
Muskoday First Nation I.R. 99 -
Ahtahkakoop Cree Nation New School
AHTAHKAKOOP INDIAN RESERVE NO. 104 -
Piapot First Nation Prince Albert Urban Gas Bar & Convenience Store
Piapot IR 75 -
Muskoday First Nation Booster Station Upgrades
Muskoday First Nation -
Muskoday First Nation - Drainage Improvements Phase 1
Muskoday First Nation Reserve -
Muskoday First Nation - Construct Cultural Centre
Muskoday First Nation - Construct Cultural Centre -
Muskoday First Nation - Community Access Road
Muskoday First Nation Reserve -
Star-Orion South Diamond Mine Project
Fort à la Corne Provincial Forest -
Hall Lake Stage 3 Subdivision
Morin Lake I.R. No. 217 -
Lac La Ronge Indian Band - Lac La Ronge 156 Lagoon Expansion
Lac La Ronge Indian Band -
Lac La Ronge Indian Band Morin Lake Lagoon and Sewage Pumping Station Upgrade
SE-33-70-26-2 and SW-34-70-26-2 -
Mistawasis Nehiyawak Lagoon Upgrades
Mistawasis Nêhiyawak -
Lac La Ronge Indian Band Clean-up of Solid Waste Disposal Sites
Sucker River IR 156C, Stanley IR 157, Morin Lake IR 217, Little Red River IR 106C, Lac La Ronge IR 156 and Grandmother's Bay IR 219 -
Lac La Ronge Indian Band Bell's Point Subdivision Stages 6 and 7
Lac la Ronge 156 -
Big River First Nation Reserve Drainage Re-Establishment
Big River First Nation -
Lac La Ronge Indian Band Wellness Healing and Recovery Center
Lac La Ronge IR No. 156 -
James Smith Cree Nation Peonan Creek Crossing
James Smith Cree Nation -
Mistawasis Nêhiyawak Lake - Traditional Lands, Gathering Space
Mistawasis Nêhiyawak Lake -
James Smith Miyo-Pimatisiwin Wellness Centre
JAMES SMITH INDIAN RESERVE NO. 100 -
MEDA 324 kW Solar Farm
Muskoday IR 99 -
Mistawasis Nehiyawak Rural Transit Solutions
Mistawasis -
Upgrade Single Tower & New Fibre Installation
Project site 1: North East region - Hall Lake -
Upgrade Single Tower & New Fibre Installation
Project site 5: North East region - Mistawasis -
Mistawasis Nêhiyawak Community Center
Mistawasis -
Tower Alteration for James Smith Cree Nation Justice & Policing communication system on James Smith Reserve No. 100
James Smith Cree Nation -
Upgrade Single Tower & New Fibre Installation
Project site 8: Central East region - James Smith -
La Ronge RCMP New Detachment
La Ronge -
James Smith Cree Nation Subdivision Stage 4
James Smith Cree Nation -
James Smith Cree Nation Headstart and Daycare
JAMES SMITH INDIAN RESERVE NO. 100 -
James Smith Cree Nation Solid Waste Transfer Station
James Smith Cree Nation -
Dore Lake Wharf Removal
Dore Lake -
Lac Eauclaire Timber Harvest Program
Pelican Lake IR 191-C -
Pelican Lake Timber Harvesting Plan
Chitek Lake IR 191 -
Pelican Lake Timber Harvesting Plan 2021-22
Chitek Lake IR 191 & 191A -
Pelican Lake Bioenergy Project
Pelican Lake First Nation -
Walk Into History
Chitek Lake -
Upgrade Single Tower & New Fibre Installation
Project site 2: North East region - Chamakese Resort (Chitek Lake) -
Pelican Lake Farms - farm site development
Pelican Lake IR 191-B -
Pelican Lake First Nation 191 A, B, C, D Gasification Project
Pelican Lake First Nation 191 A, B, C, D -
Witchekan Lake Subdivision
Witchekan Lake IR 161 -
Pelican Lake North Sewage Lagoon Expansion and Upgrades
Chitek Lake IR 191 -
Witchekan Lake First Nation Cultural Centre
Witchekan Lake Indian Reserve No. 117 -
Witchekan Lake First Nation Sweat Lodge
Witchekan Lake Indian Reserve No. 117 -
Witchekan Lake First Nation Solid Waste Transfer Station
Witchekan Lake First Nation -
Food Sovereignty Project- Bison and Elk Farms, and Community Gardens
Pelican Lake First Nation, near Leoville -
Pelican Lake Child and Family Services Facility
Pelican Lake First Nation -
Pelican Lake First Nation - Quonset Addition
Chitek Lake IR 191 -
Pelican Lake First Nation Subdivision
CHITEK LAKE INDIAN RESERVE NO. 191 -
New Fibre Installation - Central and Southeastern SK
Project site 5: MUSKEG LAKE I.R. 102 -
Beardy's & Okemasis Cree Nation Stage 4 Subdivision
Beardy's & Okemasis Cree Nation -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Point of presence -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 3 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 2 -
Beardy's and Okemasis Cree Nation Water Treatment Plant Upgrades Project
Beardy's and Okemasis Cree Nation -
Willow Cree Healing Lodge - Construction of Ready to Move (RTM) Buildings
Willow Cree Healing Lodge -
Lac La Ronge Indian Band - Sucker River 156C Sewage Pumping System Upgrades
Lac La Ronge Indian Band - Sucker River 156C -
Sucker River Water Treatment Plant Upgrade
Sucker River IR 156C -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 1 -
Upgrade Single Tower & New Fibre Installation
Project site 3: North East region - One Arrow -
Beardy's and Okemasis Cree Nation Solid Waste Removal and Landfill Decommissioning
Beardy's and Okemasis Cree Nation -
Pelican Lake Community Harvest Program Phase 2022-2024
Chitek Lake IR 191 -
Fuel Reduction Program for Batoche National Historic Site
Batoche National Historic Site -
Batoche Drainage Improvement
Grasslands National Park -
Tway National Wildlife Area Water Control Structure Re-naturalization Project.
Tway National Wildlife Area -
Remediation of One Arrow First Nation River Lot 62
One Arrow IR 95 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 2) -
Lucky Man Cree Nation Community Access Road
LUCKY MAN RESERVE -
Flying Dust - New Water Treatment Plant
Flying Dust IR 105 -
Saskatchewan Agriculture Drainage Network - Brooksby Drainage Network Project
30 kilometres northeast of Melfort -
New Fibre Installation - Central and Southeastern SK
Project site 3: One Arrow 95-1A -
Flying Dust Commercial Project
Meadow Lake -
SaskPower - 2E-33 Mullingar Rural Rebuild
Mosquito Grizzly Bear's Head Lean Man TLE Indian Reserve -
Lac La Ronge Indian Band Stanley Mission Reserve No. 157 Solid Waste Transfer Station
Lac La Ronge Provincial Park -
Flying Dust First Nation Regional Landfill
Flying Dust IR 105 -
Solid Waste Transfer Station - Stanley Mission
La Ronge Provincial Park -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 1) -
Peter Ballantyne Cree Nation Timber Harvest on IR 207
Pisiwiminiwatim IR 207 -
Highway 165 Grade Raise near Beauval, SK
Beauval, SK -
Lac La Ronge Indian Band Stanley Mission - Loon Lake Subdivision Stage 3
Stanley Mission 157 -
La Plonge Solar and Battery Energy Storage System
English River First Nation Reserve -
La Plonge Solar Project
English River First Nation Reserve -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
LA PLONGE I.R. 192 -
English River First Nation Sewage Lagoon Upgrades
La Plonge Indian Reserve No. 192 -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 6: West Central region - Stanley Mission -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
EAGLES LAKE I.R. 165C -
Flying Dust First Nation Railway Infrastructure Development Project
Flying Dust First Nation Indian Reserve No. 105 -
Saulteaux IR159 Timber Harvest Plan 2021-22
Saulteaux IR 159EE -
Flying Dust First Nation Residential Subdivision Development
Flying Dust First Nation Indian Reserve No. 105 -
Beardy's & Okemasis Cree Nation Sewage Lagoon and Pumping Station Upgrades
Beardy's and Okemasis IR No. 96 & 97 -
GL7 Phase 1 Transmission Rebuild Project (L007) / Saulteaux and Moosomin First Nations
Saulteaux IR 159G & Moosomin IR 112L -
Saulteaux IR159 Timber Harvest Plan 2020-21
Saulteaux IR 159EE -
Fixed Point-to-Point Link from Dorintosh, SK to Waterhen Lake, SK
Waterhen 130 Reserve -
Deschambault Nursing Station
Deschambault Lake Indian Settlement -
Deschambault Lake Sewage Pumping Station Upgrades
Peter Ballantyne Cree Nation Kimosom Pwatinahk Indian Reserve No. 203 -
Deschambault Lake Sewage Pumping Station Upgrades
Peter Ballantyne Cree Nation Kimosom Pwatinahk Indian Reserve No. 203 -
Deschambault Lake Lagoon Expansion
The Peter Ballantyne Cree Nation (PBCN) Kimosom Pwatinahk I.R No. 203 -
Wharf Reconstruction - Missinipe, SK - Winter 2021-22
Missinipe -
Weepuskow Sahgaiechan IR 165D Timber Harvest Plan 2020-21
WEPUSKOW SAHGAIECHAN IR 165 D -
Deschambault Lake Diesel Generating Station
Kimosum Pwatinahk IR 203 -
Thunderchild First Nation - Turtle Lake Site 115C WTP Process Waste Pond
Thunderchild IR 115C -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 5: West Central region - Grandmother's Bay -
Grandmothers Bay Lagoon and Sewage Pumping Station Upgrades
Grandmother's Bay 219 -
Kinistin Solid Waste Transfer Station
Kinistin Saulteaux Nation -
Kinistin Saulteaux Nation Sewage Lagoon Expansion
Kinistin IR No. 91 -
Kinistin Saulteaux Nation Barrier River Bridge Replacement
Kinistin Saulteaux Nation -
Solid Waste Transfer Station - Grandmother's Bay
Grandmother's Bay IR 219 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 3) -
Thunderchild First Nation - Turtle Lake Site 115C Sewage Lagoon Operations
Thunderchild First Nation -
New Fibre Installation, Upgrade (Single) Tower
Moonlight bay -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 2) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 1) -
Saulteaux Fire Hall / Maintenance Facility
Saulteaux IR 159 -
Saulteaux First Nation Firehall and Vehicle Storage Facility
Saulteaux Indian Reserve Number 159 -
Kawacatoose First Nation Subdivision
Kawacatoose IR 88 -
Thunderchild First Nation - Solid Waste Transfer Station
Thunderchild IR115B & 115C -
Saulteaux First Nation Subdivision Development
Saulteaux Indian Reserve No. 159 -
Moosomin Road Repair and Drainage
Moosomin IR No. 112B -
Thunderchild First Nation Lagoon Upgrade
Thunderchild IR115B