SaskPower Pole Replacement near Rec Hall
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
SaskPower is proposing to replace an urban power pole, transformer, and take off equipment, then trench and lay approximately 30 metres (m) of secondary cable to a customer owned splitter, at which point the customer will be responsible to connections. Ground disturbance will be limited to the base of the pole and the short run of trenching. The work will take place near an existing underground cable, within a developed area and existing roadways in NW-10-057-01 W3M, within the Waskesiu Townsite in Prince Albert National Park (the Project). The Project is required to provide an additional service point near the library/recreation hall.
Equipment that is expected to be used for completion of the Project includes: a digger truck, back-hoe, trenching equipment, and crew trucks. Access to components of the Project will make use of existing roads and trails. Surface disturbance is expected to be minimized to the base of the pole and 30 m of trenching.
Latest update
Participate
Key documents
| Document Number | Document Title | File | Date |
|---|---|---|---|
| 2 | Parks Canada has issued a notice of determination and decided that the project is not likely to cause significant adverse environmental effects | - | December 15, 2019 |
| 1 | New Project Being Assessed by Parks Canada - Public Comments Invited 13 november to 13 december, 2019 | - | November 13, 2019 |
Contacts
Prince Albert National ParkBox 100
Waskesiu Lake, Saskatchewan S0J 2Y0
Telephone: 306-663-4522 or 1-888-773-8883
Email: npfuimpactassessment@pc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Prince Albert National Park (Saskatchewan)
-
Nature of Activity
- Building and Property Development
- Hydroelectric Energy
-
Assessment Status
Completed -
Start Date
2019-11-13 -
Proponent
Parks Canada -
Authorities
- Parks Canada Agency
-
Assessment Type
Project on federal lands -
Reference Number
80307
Nearby assessments
...within 200 kilometres-
Rabbit Creek Wildfire Reclamation
Prince Albert National Park -
SaskPower replacement of 8 power poles in Prince Albert National Park
Prince Albert National Park -
SaskPower Line Trenching at Operations Compound
Prince Albert National Park -
Parks Canada ski trail reconfiguration in Waskesiu Lake, SK
Prince Albert National Park -
SaskPower Stabilization of 3 Power Poles in Waskesiu
Prince Albert National Park -
SaskPower Hesje Light Pole
Prince Albert National Park -
SaskPower Underground Cable Install at Kapasiwin Bungalows
Prince Albert National Park -
SaskPower Cable Installation to Kapasiwin Cabins
Prince Albert National Park -
SaskPower New U/G Cable and Transformer at Kapasawin Bungalows
Prince Albert National Park of Canada -
SaskPower Transformer Replacement and line trenching at Kapasiwin Bungalows
Prince Albert National Park -
Boundary Bog Trail Boardwalk Project
Prince Albert National Park -
Repair of the Waskesiu River riffle weir
Prince Albert National Park of Canada -
Crean Channel Modification
Prince Albert National Park -
Montreal Lake RCMP New Detachment
Montreal Lake -
Prince Albert Grand Council (PAGC) Women's Shelter
Montreal Lake -
MLCN Montreal LK East Lagoon
Montreal Lake IR 106 -
Outhouse relocation
Prince Albert National Park of Canada -
SaskPower Pole Replacement in Prince Albert National Park - east of Sandy Lake
Prince Albert National Park -
Hunters Lake Trail Rehabilitation
Prince Albert National Park -
SaskPower Trenching at Anglin Lake Dam (MPE Engineering)
Prince Albert National Park -
SaskPower Pole Replacement near Halkett (Sandy) Lake
Prince Albert National Park -
SaskPower Transformer Salvage
Prince Albert National Park -
SaskPower Ground Grid Replacement near MacKenzie Creek
Prince Albert National Park -
SaskPower Ground Mount Transformer Installation Red Deer Campground
Prince Albert National Park of Canada -
SaskPower Poles Replacement in Prince Albert National Park near south west boundary.
Prince Albert National Park -
Biocontrol of Yellow Toadflax using Rhinusa pilosa, in Prince Albert National Park
Prince Albert National Park -
Zagime Anishinabëk RV Trailer Park
Sakimay IR 74 -
Montreal Lake IR 106B Gasification
Montreal Lake IR 106B -
Montreal Lake Cree Nation & Little Red River Solid Waste Transfer Station & Decommissioning
Montreal Lake IR 106B -
Montreal Lake Cree Nation Little Red River Water Treatment Plant Upgrade Project
Montreal Lake Cree Nation -
Upgrade Single Tower & New Fibre Installation
Project site 4: North East region - Montreal Lake -
New Fibre Installation - Central and Southeastern SK
Project site 9: LITTLE RED RIVER I.R. 106C -
SaskPower Pole Mount Transformer Replacement for Hawood
Prince Albert National Park -
The Lac La Ronge Indian Band Little Red River Water Upgrades
LITTLE RED RIVER 106C -
Sturgeon River Pedestrian Bridge
Sturgeon Lake Indian Reservation No.101 -
Upgrade Single Tower & New Fibre Installation
Project site 6: North East region - Sturgeon Lake -
Sturgeon Lake First Nation Children's Playgrounds
Park location 3 -
Witchekan Lake First Nation Youth Lodge
Witchekan Lake Indian Reserve No. 117 -
Sturgeon Lake First Nation Subdivision
Sturgeon Lake IR 101A -
Phase 2 - Sturgeon Lake First Nation Active Transportation Network
Phase 2 - Sturgeon Lake First Nation Active Transportation Network -
Oskâyak Miyoayâwin Youth Learning Centre
STURGEON LAKE INDIAN RESERVE NO. 101 -
Sturgeon Lake First Nation - East Lagoon Expansion
Sturgeon Lake IR 101 -
Sturgeon Lake First Nation Children's Playgrounds
Park location 2 -
Sturgeon Lake First Nation Children's Playgrounds
Park location 1 -
Kapasiwin Bungalows Installation of Deep Water and Sewer Infrastructure
Prince Albert National Park -
On Hold - Aggregate Business Development Plan - Phase 2, Sturgeon Lake First Nation I.R. 101
Sturgeon Lake IR 101 -
Sturgeon Lake First Nation Child and Family Service Centre
STURGEON LAKE INDIAN RESERVE NO. 101 -
Blanket Permit - SaskEnergy - Gasification of Sturgeon Lake Indian Reserve No. 101
Sturgeon Lake Indian Reserve No. 101 -
Beaver dam and lodge removal
Prince Albert National Park -
Ahtahkakoop South Subdivision Phase 1
Ahtakakoop Cree Nation -
Muskoday Convenience Store Remediation
Muskoday First Nation -
New Fibre Installation - Central and Southeastern SK
Project site 2: Wahpaton 94A -
New Fibre Installation - Central and Southeastern SK
Project site 8: WAHPATON I.R. 94A -
Wahpeton Dakota Nation New School
Wahpeton Dakota Nation -
Wahpeton Roads Upgrades
Wahpeton Dakota Nation -
Wahpeton Dakota Nation Sewage Lagoon Expansion
WAHPATON INDIAN RESERVE NO. 94A -
Ahtahkakoop Cree Nation Debden Road Upgrades
AHTAHKAKOOP INDIAN RESERVE NO. 104 -
Big River First Nation Arena Build Project
Big River IR 118 -
Mistahi Sipiy Child and Family Service and Big River First Nation Prevention Building
Big River First Nation -
New Fibre Installation - Central and Southeastern SK
Project site 4: Big River 118 -
Fenceline Replacement - Prince Albert Training Area, Saskatchewan
DND Prince Albert Training Area -
Ahtahkakoop Powwow Grounds & Access Road
Ahtahkakoop Cree Nation -
Lac La Ronge Morin Lake Solid Waste Transfer Station & Decommissioning
Morin Lake IR 217 -
Yuasni Tipi Lodge Lease
Wahpeton Dakota Nation -
Big River First Nation Drainage Reestablishment Phase 1B
BIG RIVER INDIAN RESERVE NO. 118 -
Potential Regional Assessment of a Western Energy Corridor from Alberta to Manitoba
Prince Albert -
Potential Regional Assessment of a Western Energy Corridor
near Prince Albert -
Sturgeon Lake First Nation - Renovation for gas bar and convenience store
Sturgeon Lake First Nation - Prince Albert Strip Mall -
Cree Nation Treatment Haven Replacement
Ahtakakoop First Nation -
Ahtahkakoop Cree Nation Water Treatment Plant
Ahtahkakoop IR 104 -
New Fibre Installation - Central and Southeastern SK
Project site 7: AHTAHKAKOOP I.R. 104 -
Ahtahkakoop Cree Nation Lagoon and Sewage Pumping Station
Ahtahkakoop IR #104 -
Prince Albert Administration Office Addition
Chief Joseph Custer Reserve -
Peter Ballantyne Child and Family Services Inc. Central Office Extension
Chief Joseph Custer Reserve -
Peter Ballantyne Cree Nation Parcel E Development
CHIEF JOSEPH CUSTER RESERVE -
Ahtahkakoop Cree Nation New School
AHTAHKAKOOP INDIAN RESERVE NO. 104 -
Montreal Lake Cree Nation Bittern Lake Subdivision - Phase II
Montreal Lake IR 106B -
Peter Ballantyne Child and Family Services Facility
Kistapinin IR 211 -
Blanket Permit - SaskPower - Kistapinan Indian Reserve No.211
Kistapinan Indian Reserve No. 211 -
Big River First Nation Reserve Drainage Re-Establishment
Big River First Nation -
Mistawasis Nehiyawak Lagoon Upgrades
Mistawasis Nêhiyawak -
Carry the Kettle First Nation - Ag Permit - D. Gorniak -2019-2021
Carry The Kettle Indian Reserve 76-9 & 79-42 -
Mistawasis Nêhiyawak Lake - Traditional Lands, Gathering Space
Mistawasis Nêhiyawak Lake -
Mistawasis Nehiyawak Rural Transit Solutions
Mistawasis -
Upgrade Single Tower & New Fibre Installation
Project site 5: North East region - Mistawasis -
Mistawasis Nêhiyawak Community Center
Mistawasis -
Muskoday First Nation Sewage Lagoon Upgrade
Muskoday First Nation -
Muskoday First Nation Subdivision Development
Muskoday First Nation I.R. 99 -
Muskoday First Nation Booster Station Upgrades
Muskoday First Nation -
Piapot First Nation Prince Albert Urban Gas Bar & Convenience Store
Piapot IR 75 -
Muskoday First Nation - Construct Cultural Centre
Muskoday First Nation - Construct Cultural Centre -
Muskoday First Nation - Drainage Improvements Phase 1
Muskoday First Nation Reserve -
Muskoday First Nation - Community Access Road
Muskoday First Nation Reserve -
Lac Eauclaire Timber Harvest Program
Pelican Lake IR 191-C -
Pelican Lake Timber Harvesting Plan
Chitek Lake IR 191 -
Pelican Lake Timber Harvesting Plan 2021-22
Chitek Lake IR 191 & 191A -
Witchekan Lake Subdivision
Witchekan Lake IR 161 -
Pelican Lake Bioenergy Project
Pelican Lake First Nation -
Witchekan Lake First Nation Cultural Centre
Witchekan Lake Indian Reserve No. 117 -
Pelican Lake Farms - farm site development
Pelican Lake IR 191-B -
Walk Into History
Chitek Lake -
Upgrade Single Tower & New Fibre Installation
Project site 2: North East region - Chamakese Resort (Chitek Lake) -
Witchekan Lake First Nation Sweat Lodge
Witchekan Lake Indian Reserve No. 117 -
Pelican Lake First Nation 191 A, B, C, D Gasification Project
Pelican Lake First Nation 191 A, B, C, D -
Witchekan Lake First Nation Solid Waste Transfer Station
Witchekan Lake First Nation -
Pelican Lake North Sewage Lagoon Expansion and Upgrades
Chitek Lake IR 191 -
MEDA 324 kW Solar Farm
Muskoday IR 99 -
Food Sovereignty Project- Bison and Elk Farms, and Community Gardens
Pelican Lake First Nation, near Leoville -
Pelican Lake Child and Family Services Facility
Pelican Lake First Nation -
Star-Orion South Diamond Mine Project
Fort à la Corne Provincial Forest -
Pelican Lake First Nation - Quonset Addition
Chitek Lake IR 191 -
Pelican Lake First Nation Subdivision
CHITEK LAKE INDIAN RESERVE NO. 191 -
New Fibre Installation - Central and Southeastern SK
Project site 5: MUSKEG LAKE I.R. 102 -
La Ronge Area Peat Harvesting Project
La Ronge -
James Smith Cree Nation Peonan Creek Crossing
James Smith Cree Nation -
James Smith Miyo-Pimatisiwin Wellness Centre
JAMES SMITH INDIAN RESERVE NO. 100 -
Dore Lake Wharf Removal
Dore Lake -
Tower Alteration for James Smith Cree Nation Justice & Policing communication system on James Smith Reserve No. 100
James Smith Cree Nation -
Upgrade Single Tower & New Fibre Installation
Project site 8: Central East region - James Smith -
Beardy's & Okemasis Cree Nation Stage 4 Subdivision
Beardy's & Okemasis Cree Nation -
James Smith Cree Nation Subdivision Stage 4
James Smith Cree Nation -
James Smith Cree Nation Headstart and Daycare
JAMES SMITH INDIAN RESERVE NO. 100 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Point of presence -
Pelican Lake Community Harvest Program Phase 2022-2024
Chitek Lake IR 191 -
James Smith Cree Nation Solid Waste Transfer Station
James Smith Cree Nation -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 3 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 2 -
Beardy's and Okemasis Cree Nation Water Treatment Plant Upgrades Project
Beardy's and Okemasis Cree Nation -
Willow Cree Healing Lodge - Construction of Ready to Move (RTM) Buildings
Willow Cree Healing Lodge -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 1 -
Beardy's and Okemasis Cree Nation Solid Waste Removal and Landfill Decommissioning
Beardy's and Okemasis Cree Nation -
Upgrade Single Tower & New Fibre Installation
Project site 3: North East region - One Arrow -
Lucky Man Cree Nation Community Access Road
LUCKY MAN RESERVE -
Fuel Reduction Program for Batoche National Historic Site
Batoche National Historic Site -
Batoche Drainage Improvement
Grasslands National Park -
Lac La Ronge Indian Band Morin Lake Lagoon and Sewage Pumping Station Upgrade
SE-33-70-26-2 and SW-34-70-26-2 -
Remediation of One Arrow First Nation River Lot 62
One Arrow IR 95 -
Hall Lake Stage 3 Subdivision
Morin Lake I.R. No. 217 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 2) -
Upgrade Single Tower & New Fibre Installation
Project site 1: North East region - Hall Lake -
Flying Dust - New Water Treatment Plant
Flying Dust IR 105 -
Lac La Ronge Indian Band - Lac La Ronge 156 Lagoon Expansion
Lac La Ronge Indian Band -
Tway National Wildlife Area Water Control Structure Re-naturalization Project.
Tway National Wildlife Area -
Lac La Ronge Indian Band Bell's Point Subdivision Stages 6 and 7
Lac la Ronge 156 -
SaskPower - 2E-33 Mullingar Rural Rebuild
Mosquito Grizzly Bear's Head Lean Man TLE Indian Reserve -
Lac La Ronge Indian Band Clean-up of Solid Waste Disposal Sites
Sucker River IR 156C, Stanley IR 157, Morin Lake IR 217, Little Red River IR 106C, Lac La Ronge IR 156 and Grandmother's Bay IR 219 -
Lac La Ronge Indian Band Wellness Healing and Recovery Center
Lac La Ronge IR No. 156 -
New Fibre Installation - Central and Southeastern SK
Project site 3: One Arrow 95-1A -
La Ronge RCMP New Detachment
La Ronge -
Flying Dust Commercial Project
Meadow Lake -
Flying Dust First Nation Regional Landfill
Flying Dust IR 105 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
MAKWA LAKE I.R. 129B (Tower 1) -
Saulteaux IR159 Timber Harvest Plan 2021-22
Saulteaux IR 159EE -
GL7 Phase 1 Transmission Rebuild Project (L007) / Saulteaux and Moosomin First Nations
Saulteaux IR 159G & Moosomin IR 112L -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
EAGLES LAKE I.R. 165C -
Saulteaux IR159 Timber Harvest Plan 2020-21
Saulteaux IR 159EE -
Flying Dust First Nation Railway Infrastructure Development Project
Flying Dust First Nation Indian Reserve No. 105 -
Saskatchewan Agriculture Drainage Network - Brooksby Drainage Network Project
30 kilometres northeast of Melfort -
Flying Dust First Nation Residential Subdivision Development
Flying Dust First Nation Indian Reserve No. 105 -
Beardy's & Okemasis Cree Nation Sewage Lagoon and Pumping Station Upgrades
Beardy's and Okemasis IR No. 96 & 97 -
Lac La Ronge Indian Band - Sucker River 156C Sewage Pumping System Upgrades
Lac La Ronge Indian Band - Sucker River 156C -
Sucker River Water Treatment Plant Upgrade
Sucker River IR 156C -
Thunderchild First Nation - Turtle Lake Site 115C WTP Process Waste Pond
Thunderchild IR 115C -
Fixed Point-to-Point Link from Dorintosh, SK to Waterhen Lake, SK
Waterhen 130 Reserve -
Highway 165 Grade Raise near Beauval, SK
Beauval, SK -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
LA PLONGE I.R. 192 -
La Plonge Solar and Battery Energy Storage System
English River First Nation Reserve -
La Plonge Solar Project
English River First Nation Reserve -
English River First Nation Sewage Lagoon Upgrades
La Plonge Indian Reserve No. 192 -
Thunderchild First Nation - Turtle Lake Site 115C Sewage Lagoon Operations
Thunderchild First Nation -
Saulteaux Fire Hall / Maintenance Facility
Saulteaux IR 159 -
Saulteaux First Nation Firehall and Vehicle Storage Facility
Saulteaux Indian Reserve Number 159 -
New Fibre Installation, Upgrade (Single) Tower
Moonlight bay -
Saulteaux First Nation Subdivision Development
Saulteaux Indian Reserve No. 159 -
Moosomin Road Repair and Drainage
Moosomin IR No. 112B -
Thunderchild First Nation - Solid Waste Transfer Station
Thunderchild IR115B & 115C -
Thunderchild First Nation Lagoon Upgrade
Thunderchild IR115B -
Weepuskow Sahgaiechan IR 165D Timber Harvest Plan 2020-21
WEPUSKOW SAHGAIECHAN IR 165 D -
Lac La Ronge Indian Band Stanley Mission Reserve No. 157 Solid Waste Transfer Station
Lac La Ronge Provincial Park -
Solid Waste Transfer Station - Stanley Mission
La Ronge Provincial Park -
Peter Ballantyne Cree Nation Timber Harvest on IR 207
Pisiwiminiwatim IR 207 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 3) -
Thunderchild First Nation New Subdivision
THUNDERCHILD FIRST NATION INDIAN RESERVE NO. 115B -
Thunderchild Community Walking Trail
Thunderchild First Nation -
Thunderchild Wellness Centre
Thunderchild Wellness Centre -
Thunderchild First Nation Powwow Arbor
THUNDERCHILD FIRST NATION 115B -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 3: West Central region - Thunderchild -
Thunderchild First Nation Water Treatment Plant and Well Upgrades
THUNDERCHILD FIRST NATION 115B -
Lac La Ronge Indian Band Stanley Mission - Loon Lake Subdivision Stage 3
Stanley Mission 157 -
Kinistin Saulteaux Nation Barrier River Bridge Replacement
Kinistin Saulteaux Nation -
Kinistin Solid Waste Transfer Station
Kinistin Saulteaux Nation -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 7: West Central region - Thunderchild Fixed Wireless Tower -
Kinistin Saulteaux Nation Sewage Lagoon Expansion
Kinistin IR No. 91 -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 2) -
New Towers Construction, Upgrade single tower & New Fibre Installation
Project Site 6: West Central region - Stanley Mission -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers
CANOE LAKE I.R. 165 (Tower 1) -
Kawacatoose First Nation Subdivision
Kawacatoose IR 88 -
Saskatoon Airport Solar - 1MW Project
1MW Ground Mounted Solar Facility -
Regional Psychiatric Centre - Removal of an Underground Storage Tank
Regional Psychiatric Centre -
General Aviation Hangars Development
Saskatoon International Airport YXE -
Apron III infill
Saskatoon International Airport YXE -
Saskatchewan Indian Institute of Technologies Hangar Expansion
Saskatchewan Indian Institute of Technologies -
45th & Airport Holdings Ltd. Restaurant and Gas Station Commercial Development
Restaurant/Gas Station Commercial Development -
Nutrien Aviation Hangar Expansion
STARS Saskatoon Base