Hall Lake Stage 3 Subdivision
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The Lac La Ronge Indian Band is proposing the development of a new 57 lot subdivision in the community of Hall Lake (Morin Lake I.R. No. 217). The community has no available lots for home construction. The first phase of the subdivision will include water, sewer, lot grading and road development for 22 lots. Construction includes installation of water mains (including hydrants and valves), sanitary sewer mains (including manholes), power lines, storm sewer infrastructure (culverts). Feasibility, pre-design and detailed design have been completed and approved by ISC. Site clearing will be required for lot grading. Construction will include installation of underground utilities, lot grading and road development.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination for the Hall Lake Stage 3 Subdivision | - | July 19, 2021 |
1 | Public Comment Period on Intent to Make a Determination | - | April 23, 2021 |
Contacts
ISC-SKENVIndigenous Services Canada
1827 Albert Street
Regina, Saskatchewan S4P 2S9
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca
-
Location
- Morin Lake I.R. No. 217 (Saskatchewan)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
Completed -
Start Date
2021-07-05 -
Proponent
Lac La Ronge Indian Band -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
81569
Nearby assessments
...within 200 kilometres-
Lac La Ronge Indian Band Wellness Healing and Recovery Center
Lac La Ronge IR No. 156 -
Lac La Ronge Indian Band Clean-up of Solid Waste Disposal Sites
Sucker River IR 156C, Stanley IR 157, Morin Lake IR 217, Little Red River IR 106C, Lac La Ronge IR 156 and Grandmother's Bay IR 219 -
Sucker River Water Treatment Plant Upgrade
Sucker River IR 156C -
Carry the Kettle First Nation - Ag Permit - D. Gorniak -2019-2021
Carry The Kettle Indian Reserve 76-9 & 79-42 -
Lambert La Ronge Peat Harvest Project
La Ronge -
Solid Waste Transfer Station - Stanley Mission
La Ronge Provincial Park -
Wharf Reconstruction - Missinipe, SK - Winter 2021-22
Missinipe -
Solid Waste Transfer Station - Grandmother's Bay
Grandmother's Bay IR 219 -
MLCN Montreal LK East Lagoon
Montreal Lake IR 106 -
Crean Channel Modification
Prince Albert National Park -
Prince Albert Grand Council (PAGC) Women's Shelter
Montreal Lake -
Dore Lake Wharf Removal
Dore Lake -
SaskPower Transformer Replacement and line trenching at Kapasiwin Bungalows
Prince Albert National Park -
SaskPower New U/G Cable and Transformer at Kapasawin Bungalows
Prince Albert National Park of Canada -
SaskPower Cable Installation to Kapasiwin Cabins
Prince Albert National Park -
SaskPower Underground Cable Install at Kapasiwin Bungalows
Prince Albert National Park -
SaskPower Hesje Light Pole
Prince Albert National Park -
Highway 165 Grade Raise near Beauval, SK
Beauval, SK -
SaskPower Stabilization of 3 Power Poles in Waskesiu
Prince Albert National Park -
SaskPower replacement of 8 power poles in Prince Albert National Park
Prince Albert National Park -
Rabbit Creek Wildfire Reclamation
Prince Albert National Park -
Boundary Bog Trail Boardwalk Project
Prince Albert National Park -
SaskPower Pole Replacement near Rec Hall
Prince Albert National Park -
SaskPower Line Trenching at Operations Compound
Prince Albert National Park -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
LA PLONGE I.R. 192 -
Peter Ballantyne Cree Nation Timber Harvest on IR 207
Pisiwiminiwatim IR 207 -
Deschambault Nursing Station
Deschambault Lake Indian Settlement -
Deschambault Lake Diesel Generating Station
Kimosum Pwatinahk IR 203 -
SaskPower Trenching at Anglin Lake Dam
Prince Albert National Park -
SaskPower Pole Replacement in Prince Albert National Park - east of Sandy Lake
Prince Albert National Park -
Hunters Lake Trail Rehabilitation
Prince Albert National Park -
SaskPower Pole Replacement near Halkett (Sandy) Lake
Prince Albert National Park -
SaskPower Transformer Salvage
Prince Albert National Park -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
CANOE LAKE I.R. 165 (Tower 3) -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
WAPACHEWUNAK I.R. 192D (Tower 1) -
SaskPower Ground Grid Replacement near MacKenzie Creek
Prince Albert National Park -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
CANOE LAKE I.R. 165 (Tower 2) -
Wapachewunak Water Treatment Plant Optimization
Wapachewunak IR 192D -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
WAPACHEWUNAK I.R. 192D (Tower 2) -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
CANOE LAKE I.R. 165 (Tower 1) -
Weepuskow Sahgaiechan IR 165D Timber Harvest Plan 2020-21
WEPUSKOW SAHGAIECHAN IR 165 D -
SaskPower Poles Replacement in Prince Albert National Park near south west boundary.
Prince Albert National Park -
SaskPower Ground Mount Transformer Installation Red Deer Campground
Prince Albert National Park of Canada -
Biocontrol of Yellow Toadflax using Rhinusa pilosa, in Prince Albert National Park
Prince Albert National Park -
Montreal Lake IR 106B Gasification
Montreal Lake IR 106B -
Montreal Lake Cree Nation Solid Waste Transfer Station & Decommissioning
Montreal Lake IR 106B -
Muskoday Convenience Store Remediation
Muskoday First Nation -
Zagime Anishinabëk RV Trailer Park
Sakimay IR 74 -
SaskPower Pole Mount Transformer Replacement for Hawood
Prince Albert National Park -
Sturgeon Lake First Nation Children's Playgrounds
Park location 3 -
Sturgeon Lake First Nation Subdivision
Sturgeon Lake IR 101A -
Sturgeon Lake First Nation - East Lagoon Expansion
Sturgeon Lake IR 101 -
Sturgeon Lake First Nation Children's Playgrounds
Park location 2 -
Sturgeon Lake First Nation Children's Playgrounds
Park location 1 -
Kapasiwin Bungalows Installation of Deep Water and Sewer Infrastructure
Prince Albert National Park -
Aggregate Business Development Plan - Phase 2, Sturgeon Lake First Nation I.R. 101
Sturgeon Lake IR 101 -
Lac Eauclaire Timber Harvest Program
Pelican Lake IR 191-C -
Mistahi Sipiy CFS and Big River First Nation Prevention Building
Big River First Nation -
Peter Ballantyne Cree Nation Southend Solid Waste Transfer Station
SE 1/4 36-10-84 W2M -
Big River First Nation Arena Build Project
Big River IR 118 -
New (Multiple) Tower Construction, Upgrade (Multiple) Tower
MAKWA LAKE I.R. 129B (Tower 2) -
Flying Dust - New Water Treatment Plant
Flying Dust IR 105 -
Lac La Ronge Morin Lake Solid Waste Transfer Station & Decommissioning
Morin Lake IR 217