Pelican Narrows Sewage Pumping Station 4 and 5 Replacement
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The existing Sewage Pumping Station (SPS) No. 4 located on Nesoteo Road was constructed in 1993 with an 1800 mm wet well with an adjacent 2500 mm square well and two 5 HP pumps. It will be entirely decommissioned and all infrastructure removed from the site before the proposed new SPS No. 4 is constructed west of the existing site. The new development will include a split face block building with metal roofing to be situated above a new wet well, new fence and posts, new watermain (WM), Sanitary Force Main (SFM) and Sanitary Sewer (SanS) pipelines from the street, larger access road, and fuel tank storage. The new building will have a larger footprint than the existing and will contain separate electrical and generator rooms. It is proposed to be constructed west of and adjacent to the existing SPS No. 4 which will result in clearing, grubbing and topsoil stripping an area measuring about 1,400 square metres (sq.m).
SPS No. 5 located on McKay Road was constructed in 1997 with a 1800 mm wet well and 7.5 HP sewage pumps will be decommissioned and removed. All infrastructure except for the existing wet well will be decommissioned, and removed from the site with the construction of a new, larger building. A new, larger smooth face block and metal roof building is proposed at the existing SPS No.5 site. The building structure and concrete building slab will be decommissioned and removed leaving the existing wet well and pipes. To construct the new, larger building over the existing wet well, vegetation clearing and grubbing will take place over an area approximately 1,090 sq. m. Topsoil will be removed over an approximate area of 1,250 sq. m. The proposed new, larger facility will have separate pump room built on top of the existing remaining od 1,800 mm wet well. Additionally, the building will have separate electrical and generator rooms. In order to accommodate the building expansion, clay fill will be imported to regrade the slope behind (northeast) of the existing building footprint. Fuel tank storage, new chain link fence with gates and a gravel pad are included as are a new gate valve and pipe extension.
The new facilities are being designed to meet the Pelican Narrows projected 2037 population sewage loading requirements (15-year projection).
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination for the Pelican Narrows Sewage Pumping Station 4 and 5 Replacement | - | November 21, 2023 |
1 | Notice of Intent -Start of Public Comment Period | - | October 19, 2023 |
Contacts
ISC-SKENVIndigenous Services Canada
Alvin Hamilton Building, 1783 Hamilton Street
Regina, Saskatchewan S4P 2B6
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca
-
Location
- Pelican Narrows - SPS No.4 S25 T71 R7 W2M; SPS No. 5 S30 T71 R6 W2M (Saskatchewan)
-
Nature of Activity
- Waste Management
-
Assessment Status
Completed -
Start Date
2023-10-19 -
Proponent
Peter Ballantyne Cree Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
86028
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Deschambault Lake Diesel Generating Station
Kimosum Pwatinahk IR 203 -
Deschambault Lake Sewage Pumping Station Upgrades
Peter Ballantyne Cree Nation Kimosom Pwatinahk Indian Reserve No. 203 -
Deschambault Lake Sewage Pumping Station Upgrades
Peter Ballantyne Cree Nation Kimosom Pwatinahk Indian Reserve No. 203 -
Deschambault Nursing Station
Deschambault Lake Indian Settlement -
Sandy Bay Lagoon Upgrade
Peter Ballantyne Cree Nation WAPASKOKIMAW INDIAN RESERVE NO. 202 -
Peter Ballantyne Cree Nation Timber Harvest on IR 207
Pisiwiminiwatim IR 207 -
McIlvenna Bay Mine Project
Creighton -
Construction of a Royal Canadian Mounted Police Detachment in Flin Flon, Manitoba
Flin Flon -
Solid Waste Transfer Station - Stanley Mission
La Ronge Provincial Park -
Lac La Ronge Indian Band Stanley Mission Reserve No. 157 Solid Waste Transfer Station
Lac La Ronge Provincial Park -
Mathias Colomb Cree Nation Water Treatment Plant Upgrade
Mathias Colomb Cree Nation -
Grandmothers Bay Lagoon and Sewage Pumping Station Upgrades
Grandmother's Bay 219 -
Mathias Colomb Cree Nation Water Treatment Plant Upgrade
Mathias Colomb Cree Nation -
Solid Waste Transfer Station - Grandmother's Bay
Grandmother's Bay IR 219 -
Sturgeon Weir Solid Waste Transfer Station
Title No. 117312140, Parcel No. 135289660, Blk/Par F-Plan 96PA11458 Ext 0 in NE 13-61-30-W1M -
Wharf Reconstruction - Missinipe, SK - Winter 2021-22
Missinipe -
Peter Ballantyne Cree Nation Southend Lot Drainage and Improvement
Southend -
Peter Ballantyne Cree Nation Southend Solid Waste Transfer Station
SE 1/4 36-10-84 W2M -
La Ronge Area Peat Harvesting Project
La Ronge -
Sucker River Water Treatment Plant Upgrade
Sucker River IR 156C -
Lac La Ronge Indian Band - Sucker River 156C Sewage Pumping System Upgrades
Lac La Ronge Indian Band - Sucker River 156C -
Lac La Ronge Indian Band Clean-up of Solid Waste Disposal Sites
Sucker River IR 156C, Stanley IR 157, Morin Lake IR 217, Little Red River IR 106C, Lac La Ronge IR 156 and Grandmother's Bay IR 219 -
Cumberland House Cree Nation Fire Hall & Equipment
Cumberland House Cree Nation -
Cumberland House Cree Nation Water Treatment Plant Upgrade
Cumberland House Cree Nation -
Lac La Ronge Indian Band - Lac La Ronge 156 Lagoon Expansion
Lac La Ronge Indian Band -
Lac La Ronge Indian Band Wellness Healing and Recovery Center
Lac La Ronge IR No. 156 -
Hall Lake Stage 3 Subdivision
Morin Lake I.R. No. 217 -
Remedial Action Plan - Lot L & Remedial Action / Risk Management Plan - Lot 21E
Opaskwayak Cree Nation -
Montreal Lake Cree Nation Bittern Lake Subdivision - Phase II
Montreal Lake IR 106B -
Remedial Action Plan - Lot L & Remedial Action / Risk Management Plan - Lot 21E
Opaskwayak Cree Nation -
Carry the Kettle First Nation - Ag Permit - D. Gorniak -2019-2021
Carry The Kettle Indian Reserve 76-9 & 79-42 -
Cormorant Lake Harbour Manitoba - Steel Pile Removal - Winter 2019/2020
Cormorant Lake Harbour -
Red Earth Cree Nation Shoreline Reinforcement
Red Earth Cree Nation Carrot River 29A -
Red Earth River Dike Extension
Red Earth IR 29A -
Lalor Concentrator Project
210 kilometres east of Flin Flon -
Cumberland House Cree Nation On-reserve Timber Harvesting and Wildfire Fuel Break
Cumberland House Cree Nation IR 20 -
Lac La Ronge Indian Band Morin Lake Lagoon and Sewage Pumping Station Upgrade
SE-33-70-26-2 and SW-34-70-26-2 -
Shoal Lake Cree Nation Lagoon Upgrades
Shoal Lake Cree Nation -
Red Earth Water Supply and Treatment Project
Red Earth First Nation -
Red Earth Cree Nation Carrot River and Natacam Lagoon Upgrades
Red Earth Cree Nation