SaskPower Pole Mount Transformer Replacement for Hawood

SaskPower is proposing to replace a pole mount transformer on an existing wooden pole, and directionally drill 65 m to a customer supplied metering point in SE-16-57-01 W3M. within Prince Albert National Park. The project is required to increase the capacity of the line and maintain the quality of service to an existing customer. Equipment that is expected to be used for completion of the project includes: a digger truck, back-hoe, bucket truck, directional boring equipment, and crew trucks. access to components of the project will make use of existing roads and trails. Surface disturbance is expected to be minimized to the bell holes at the existing pole and metering point.


Latest update

January 23, 2020 - The assessment decision statement has been issued to the proponent.

Participate

Key documents

Key documents
Document number Document title File Date
2 Parks Canada has issued a notice of determination and decided that the project is not likely to cause significant adverse environmental effects - December 15, 2019
1 New Project Being Assessed by Parks Canada - Public Comments Invited 20 September to 20 October, 2019 - September 20, 2019

Contacts

Prince Albert National Park
Box 100
Waskesiu Lake, Saskatchewan S0J 2Y0
Telephone: 306-663-4522 or 1-888-773-8883
Email: npfuimpactassessment@pc.gc.ca


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

  • Location

    • Prince Albert National Park (Saskatchewan)
  • Nature of activity

    • Recreation and Tourism
    • Hydroelectric Energy
  • Assessment status

    Completed
  • Start date

    2019-09-20
  • Proponent

    Parks Canada
  • Authorities

    • Parks Canada Agency
  • Assessment type

    Project on federal lands
  • Reference number

    80213