Woods Trail Intersection Realignment

The Department of National Defence (DND) has proposed a project which involves the re-alignment of Woods Trail between its bridge and North Creek Trail and decommissioning its two branch trails in the 17 Wing Detachment Dundurn's Range and Training Area. Brightwater creek runs through the training area. The creek passes by Woods Trail, and the embankment has begun to erode. The embankment deterioration has compromised the structural integrity of primary and secondary trails for personnel and vehicles' safety along the route. The estimated re-routed trail is 195 m in length and roughly 313 km of secondary trails to be decommissioned. Restoration of the creek embankment will be addressed as a separate project.


Latest update

August 19, 2021— The Department of National Defence issued its Notice of Determination and determined that the project is not likely to cause significant adverse environmental effects.

.

Participate

Contacts

Department of National Defence
Parneet Saini, Officer Commanding, Real Property Operations Unit (West) Detachment Dundurn
Real Property Operations Section Dundurn
General Delivery Station Main
Dundurn, Saskatchewan S0K 1K0
Email: parnneet.saini@forces.gc.ca


  • Location

    • 17 Wing Detachment Dundurn's Range and Training Area (Saskatchewan)
  • Nature of Activity

    • Highways and Roads
  • Assessment Status

    Completed
  • Start Date

    2021-05-27
  • Proponent

    Department of National Defence
  • Authorities

    • Department of National Defence
  • Assessment Type

    Project on federal lands
  • Reference Number

    81660