Muskowekwan Water Treatment Plant Upgrades

The project will include the construction of a new water treatment plant (WTP) and the connection of a water supply well for Muskowekwan First Nation located on NW 12-27-15 W2M.  The WTP building will sit upon a new underground concrete storage reservoir.  Total area of the building is 616 sq. m.  Total area of facility, including gravel surfaces and truck load out is 0.32 ha (3200 sq. m).  Building construction is typical wood frame construction , with brick veneer.  Treatment process include biological pretreatment with membrane filtration.  The process is sized to meet the ten year design period with room for expansion to meet the twenty year design period.  The existing WTP will be decommissioned upon completion of the new facility.
 


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Latest update

The assessment is in progress.

Key documents

Key documents
Document Number Document Title File Date
1 Public Comment Period on Intent to Make a Determination - October 21, 2020

List all records

Contacts

ISC-SKENV
Indigenous Services Canada
Hilary Hunter, A/ Sr. Environment Officer
1827 Albert Street
Regina, SK S4P 2S9
Telephone: 306-780-5392
Email: aadnc.isc-skenv.aandc@canada.ca


  • Location

    • Muskowekwan IR 85 (Saskatchewan)
  • Project Type

    • Water Management
  • Status

    In progress
  • Start Date

    2020-10-21
  • Proponent

    Muskowekwan First Nation
  • Authorities

    • Indigenous Services Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    81095