Zagime Anishinabëk Gasification
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Natural Gas Low Pressure Distribution Infrastructure - Permit for the whole of WR# 323653 for as long as needed. SaskEnergy may install and maintain natural gas natural gas mains and any supporting infrastructure required to support natural gas distribution services (e.g. meter stations, valves, tie-ins etc.) on above noted reserves. The majority of work will involve the installation, maintenance, repair and decommissioning of mains noted in WR 323653.
Typical work on these projects includes but is not limited to: initial survey of project area, scoping of work, bell hole excavation, exposure of existing mains for tie-ins, installation of mains via trenching/ploughing/directional drilling/boring or other standard means, tie-ins, backfill and re-contouring of excavated or disturbed areas, re-seeding as required, and final clean up of the project area.
Infrastructure installations may also involve topsoil stripping, graveling and grading, building of approaches as required. SaskEnergy infrastructure may be installed adjacent to or within utility corridors that may include power, telecommunications, natural gas transmission, oil, water and/or natural gas distribution. The mains will primarily be installed in land areas that have been subject to previous disturbance, including but not limited to previously cleared cultivated and pasture lands, land developed for residential and rural residential use, urban areas, road verges, and industrial lands. However, portions may also traverse uncleared and/or undeveloped lands and natural landscapes with native plant and wildlife communities.
All construction will follow established standards current at the time of project installation. Potential waste generation includes products of hydrocarbon combustion (e.g. Carbon dioxide), drilling mud (bentonite), potential spills/leaks of materials not limited to hydrocarbons, lubricants, antifreezes and greases typically used in construction equipment. Spill prevention will be emphasized, spill kits used, and clean up and reporting completed following best practices. The Land Manager for the listed IRs will be made aware of all spills.
All SaskEnergy work will involve natural gas and follows established safety standards.
A separate application for a blanket permit for subsequent mains, services and infrastructure will follow upon the quote acceptance by the customer.
Work may take place with in 30 m of Crooked Lake. All work will be in road verges. Future services will be installed to existing buildings in developed lots. No impacts are anticipated, however the Department of Fisheries and Oceans is being consulted.
All SaskEnergy work will adhere to the Migratory Bird Convention Act and Regulations.
Portions of proposed route which cross heritage sensitive areas and may have the potential to impact cultural, historical or archaeological resources will identified and suitable mitigation will be determined in with the input of the Land Manager for Zagime.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
4 | Notice of Determination for Zagime Anishinabëk Gasification | - | March 4, 2022 |
1 | Public Comment Period on Intent to Make a Determination | - | January 26, 2022 |
2 | Map of project | PDF (2.3 MB) | January 25, 2022 |
Contacts
ISC-SKENVIndigenous Services Canada
Alvin Hamilton Building, 1783 Hamilton Street
Regina, Saskatchewan S4P 2B6
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca
-
Location
- Zagime Anishinabëk Indian Reserves 74, 74-2, 74-9, 74-12, 74-16, 74-17 and Shesheep IR 74A (Saskatchewan)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
Completed -
Start Date
2022-04-01 -
Proponent
Zagime Anishinabek First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
83315
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Basadinaa - Crooked Lake Cottage Lots Head Lease #5- Zagime Anishinabek First Nation
Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #5- Zagime Anishinabek First Nation
Shesheep IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #4- Zagime Anishinabek First Nation
Shesheep IR 74A -
Basadinaa - Crooked Lake Cottage Lots Head Lease #4- Zagime Anishinabek First Nation
Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots
Shesheep IR 74A & Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #3- Zagime Anishinabek First Nation
Sakimay IR 74, Shesheep IR 74A -
Zagime Anishinabek Water Treatment Plant and Sewage Pumping Station Upgrade
Zagime Anishinabek First Nations -
Zagime Anishinabek School
Sakimay IR 74 -
Crooked Lake Outlet Structure Replacement
Crooked Lake - SW-08-19A-05 W2M -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SE-08-19a-05-2
Cowessess First Nation -
Zagime Greenhouse
Zagime IR #74-9 / IR #74-2 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation
Cowessess First Nation -
Cowessess - Agricultural Permit G. Lerat
Cowessess Indian Reserve 73 -
Cowessess First Nation Solid Waste Transfer Station
Cowessess First Nation -
Kahkewistahaw First Nation Operations & Maintenance Building and Fire Hall
Kahkewistahaw First Nation -
Kahkewistahaw First Nation Green Links and Teaching Garden: Connecting Elders and Youth
Kahkewistahaw First Nation -
Kahkewistahaw First Nation Lagoon Upgrade
Kahkewistahaw IR 72 -
Kahkewistahaw First Nation Water Treatment Plant Upgrade
Kahkewistahaw First Nation -
Kahkewistahaw First Nation Subdivision Development (Phase 23)
Kahkewistahaw IR 72 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NE-06-17-05-02
Cowessess First Nation -
Kahkewistahaw First Nation Solid Waste Transfer Station
Kahkewistahaw IR 72 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-06-17-05-2
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-29-20-04-2
Cowessess First Nation -
Peepeekisis Community Centre Gas Bar
Peepeekisis IR #81 -
Zagime Anishinabek Solid Waste Transfer Station
Sakimay IR 74 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-09-15-05-2
Cowessess First Nation -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NE-32-17-10-2
Cowessess First Nation -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NW-23-14-05-2
Cowessess First Nation -
Saskatchewan Agriculture Drainage Network - Vipond Drainage Network Project
6 kilometres east of Glenavon -
Zagime Anishinabek First Nation - Section 95 housing project
Sakimay 74-5 -
Peepeekisis Community Centre
Peepeekisis IR #81 -
Carry The Kettle First Nation Solid Waste Transfer Station
Assiniboine IR 76 -
Carry The Kettle First Nation Lagoon Expansion
Assiniboine IR 76 -
Carry the Kettle First Nation - Nakota Junction Gas Station
Assiniboine IR 76 -
Blanket Permit - SaskEnergy - Gasification of Assiniboine Indian Reserve No. 76
Assiniboine Reserve No. 76 -
Okanese First Nation Head Start Building Construction
Okanese First Nation -
Okanese Cree Nation - Water Treatment Plant Upgrade
Okanese IR 82 -
Blanket Permit - SaskEnergy - Gasification of Okanese Indian Reserve No. 82
Okanese First Nation -
Bekevar Wind Energy Project
Cowessess IR No. 73A -
Zagime Community Center
Zagime IR #74-3 -
Star Blanket Water Treatment Plant Upgrades
Star Blanket First Nation -
Yorkton Tribal Council Child & Family Services Office Building
Kahkewistahaw IR 92 A-1 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-23-12-10-2
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NW-16-12-10-2
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-18-12-10-2
Cowessess First Nation -
Ocean Man First Nation 1 MW Solar Project
Ocean Man IR 69I -
Standing Buffalo Gas Station Expansion
Standing Buffalo Dakota Nation -
Standing Buffalo Dakota Nation - Solid Waste Transfer Station
Standing Buffalo IR 78 -
Standing Buffalo Dakota Nation - Water Treatment Plant Upgrade
Standing Buffalo IR 78 -
Ocean Man Indian Reserve 69E Well pad2
Ocean Man Indian Reserve 69E -
Ocean Man Indian Reserve 69E Well pad
Ocean Man Indian Reserve 69E -
Ocean Man Indian Reserve 69E Pipeline3
Ocean Man Indian Reserve 69E -
Ocean Man Indian Reserve 69E Pipeline2
Ocean Man Indian Reserve 69E -
Ocean Man First Nation Headstart and Daycare
Ocean Man Indian Reserve No. 69 -
Ocean Man Indian Reserve 69 Well Pad FS-2023
Ocean Man Indian Reserve 69 -
Ocean Man Indian Reserve 69E Pipeline4
Ocean Man Indian Reserve 69E -
New (Multiple) Tower Construction
PHEASANT RUMP NAKOTA BAND I.R. 68 (Site #2) -
SaskPower's Power Generation - Ocean Man Solar Interconnect
Ocean Man IR 69I -
Pasqua First Nation - New Spray Park
Pasqua 79 -
New (Multiple) Tower Construction
PHEASANT RUMP NAKOTA BAND I.R. 68 (Site #1) -
Keeseekoose - Agricultural Permit - K. Martenuik
Keeseekoose - Agricultural Permit - K. Marteniuk -
Meadow Lake Tribal Council: Solar Project
NE¼-31-09-09 W2M -
PADCOM Potash Solution Mining Project
16 kilometres west of Russell -
Pasqua First Nation Elders's Centre
Pasqua First Nation -
New (Multiple) Tower Construction
School Tower -
Saskatchewan Agriculture Drainage Network - Blackbird Creek Drainage Network Project
50 kilometres east of Yorkton, Saskatchewan -
Muscowpetung Powwow Arbour
Muscowpetung IR 80 -
Albany Potash Mine Project
30 kilometers southeast of Regina, Saskatchewan, within the Regional Municipalities of Lajord and Francis -
Pheasant Rump Lagoon Expansion
Pheasant Rump Nakota IR 68D -
Cultural Centre for Women, Girls and Two Spirited Band Members
Kisbey -
New (Multiple) Tower Construction
PHEASANT RUMP NAKOTA INDIAN RESERVE NO. 68D (Site #3) -
Pheasant Rump Nakota IR 68D Gasification Project
Pheasant Rump Nakota IR 68D -
Pheasant Rump Nakota Nation Subdivision Expansion
SW 19-08-005 W2M -
Pheasant Rump Nakota First Nation - Cultural Centre
Pheasant Rump Nakota First Nation - Cultural Centre -
White Bear First Nation Community Spray Park
White Bear 70 -
Energy East Project
Moosomin -
New (Multiple) Tower Construction
Muscowpetung Saulteaux Nation - North Tower -
New (Multiple) Tower Construction
Muscowpetung Saulteaux Nation - South Tower -
Muscowpetung Powwow Arbour
Muscowpetung Saulteaux Nation -
Key Junction Gas Bar & Confectionery
The Key First Nation -
Hutterite Brethren Church of Twin Creek Inc. - Grazing Permit - Muskowekwan First Nation - 2019-2023
Muskowekwan 85-10 and 85-15 -
Grazing Permits on Saskatchewan First Nations Reserve Lands
Saskatchewan First Nation Communities -
Agricultural permits on Saskatchewan First Nation Reserve Lands
Saskatchewan First Nations -
Saskatchewan Agriculture Drainage Network - Wascana Block A Drainage Network Project
25 kilometres southeast of Regina -
Piapot Lagoon, Forcemain and Sewage Pumping Station
Piapot IR 75 -
Birdtail Sioux First Nation Aerated Lagoon Project
Birdtail Lagoon First Nation -
Muskowekwan Gas Bar & Convenience Store
Muskowekwan IR 85 -
Muskowekwan Solid Waste Transfer Station
Muskowekwan IR 85 -
Muskowekwan Water Treatment Plant Upgrades
Muskowekwan IR 85 -
Cowessess 10 MW Solar Project
Cowessess IR #73 -
Birdtail Sioux Dakota Nation Prevention Centre for the Delivery of FNCFS
Birdtail Sioux Dakota Nation -
Awasis Solar Project
SE 7-17-18 W2 -
Awasis Solar - 10 MW Project
Cowessess IR #73 -
Muskowekwan Lagoon & Sewage Pumping Station
Muskowekwan IR 85 -
Cote First Nation Solid Waste Transfer Station
Cote IR 64 -
Muskowekwan Potash Mine Project
Lestock -
Piapot First Nation Road to Community Wells
Piapot IR 75 -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southwest -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northwest -
On hold - Muskowekwan Wind Farm Project
Muskowekwan Indian Reserve 85-43, 85-49, 85-50, 85-63, 85-64, 85-65 -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Regina -
1236 Albert Street - Cowessess First Nation - Building Development
Cowessess IR No. 73 -
Albert Street Building Development
1246 Albert Street, Regina, Saskatchewan -
Cowessess Urban Indigenous Health centre
Cowessess Indian reserve No. 73 -
1201 Angus Street - Cowessess First Nation - Building Development for parking
Cowessess IR No. 73 -
Cote First Nation Main Landfill Decommissioning
Cote IR 64 -
Cote First Nation #64 - Landfill decommissioning at the Main Landfill Site
Badgerville -
Walkway to support healthy lifestyle for Cote First Nation
Bagerville -
Waywayseecappo - New Water Treatment Plant - 2324
Waywayseecappo WTP -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northeast -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southeast -
Pheasant Rump Nakota Nation Solid Waste Transfer Station
Pheasant Rump IR 68 -
Runway De-Icing Liquid Storage Tank
Regina -
Cote First Nation Wood Treatment Remediation Project
Cote IR 64 -
Saskatchewan Agriculture Drainage Network - Lang West Drainage Network Project
32 kilometres northwest of Weyburn -
Runway 13-31 Rehabilitation
Regina -
West Land Road and Sewer Extension
Sakimay IR 74-6 -
Saskatchewan Indigenous Enterprise Foundation Inc. Southern Office Complex
Lot 19 Plan 112422, NE 1/4 Sec. 20-17-20, W.2 M -
Saskatchewan Agriculture Drainage Network - Saline Lake Drainage Network Project
100 kilometres northwest of Yorkton -
Keeseekoose Multi-Purpose Health facility
Keeseekoose IR 66 -
The Key First Nation Lagoon Upgrade Project
The Key First Nation -
Tower Hill VHF Tower
Riding Mountain National Park -
PARKS CANADA AGENCY - Riding Mountain National Park (West Side) Addition of New Site Known as Tower Hill
PARKS CANADA AGENCY - Riding Mountain National Park (West Side) -
Keeseekoose - Agricultural Permit - S. Marsh
Keeseekoose - Agricultural Permit - S. Marsh -
Tootinaowaziibeeng - CHRT 41 - Wellness Centre
Tootinaowaziibeeng -
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324 -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Cromer -
Fishing Lake First Nation - Sewage Lagoon Expansion
Fishing Lake IR 89A -
Kawacatoose First Nation Water Treatment Plant Upgrade and Expansion
Kawacatoose IR 88 -
Solid Waste Transfer Station - Fishing Lake First Nation
Fishing Lake Indian Reserve 89 -
Agricultural permit - Fishing Lake - C. Fehr #2
Fishing Lake IR 89 -
Fishing Lake First Nation - Agricultural Permit - C. Fehr
Fishing Lake IR 89 -
Pope National Wildlife Area Water Control Structure Renaturalization Project
Pope National Wildlife Area -
Construction of a Royal Canadian Mounted Police Detachment in Estevan, Saskatchewan
Estevan -
Menzies Prescribed Fire
Riding Mountain National Park of Canada -
Saskatchewan Agriculture Drainage Network - Dry Lake Drainage Network Project
50 kilometres northeast of Weyburn -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Keeseekoowenin First Nation (Indian Reserve 61) Project site 2 -
Estevan Port of Entry Redevelopment
Estevan Port of Entry -
North Portal Septic Tank Replacement
North Portal -
Saskatchewan Agriculture Drainage Network - 600 Creek Drainage Network Project
20 kilometers southeast of Storthoaks -
On hold - Piapot Wind Farm Project
Piapot Indian Reserve 75 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Keeseekoowenin First Nation (Indian Reserve 61) Project site 1 -
WireIE (Canada) Inc. - Radiocommunication Tower - Northgate Border Crossing, Hwy 9, Northgate SK
Northgate Border Crossing -
Water Retention within the Lake Winnipeg Basin with Sioux Valley Dakota Nation
Sioux Valley Dakota Nation -
Extension of Bison Enclosure South onto Plains Rough Fescue Grassland Restoration Area
Riding Mountain National Park -
Erosion Control on Hales Creek within the Lake Winnipeg Basin with Sioux Valley Dakota Nation
Sioux Valley Dakota Nation -
Jackfish Creek Prescribed Fire
Riding Mountain National Park of Canada -
WireIE (Canada) Inc. - Radiocommunication Tower - Torquay Border Crossing, Hwy 350, Torquay SK
Torquay Border Crossing -
Oungre Port of Entry Redevelopment
Oungre Port of Entry -
Last Mountain Lake National Wildlife Area Observation Tower II
Last Mountain Lake National Wildlife Area -
Last Mountain Lake National Wildlife Area Water Control Structure Re-naturalization Project
Last Mountain Lake National Wildlife Area -
WireIE (Canada) Inc. - Radiocommunication Tower - Carievale Border Crossing, Hwy 8, Carievale SK
Carievale Border Crossing -
Moose Jaw Combined Cycle Power Station Project
Moose Jaw -
South Lake Prescribed Fire
Riding Mountain National Park of Canada -
Smallmouth Bass Project
Riding Mountain National Park -
Utility Service Agreement BELL MTS Inc. Moon Lake Telecommunications Tower
Riding Mountain National Park -
MB Hydro Pole and Arm Replacement
Riding Mountain National Park of Canada -
Boreal Trail Reconstruction
Riding Mountain National Park of Canada -
Ominnik Marsh Trail Accessibility Reroute
Riding Mountain National Park -
Research, Monitoring and Management of Invasive Smallmouth Bass in Clear Lake, Riding Mountain National Park
Riding Mountain National Park -
Management of Zebra Mussels in Clear Lake in Riding Mountain National Park
Riding Mountain National Park of Canada -
Stalwart National Wildlife Area Water Control Structure Re-naturalization Project
Stalwart National Wildlife Area -
New Cabin 56-4th St. S. Clear Lake Cabin Area
Riding Mountain National Park of Canada -
Northeast end of Clear Lake Cabin area storm water catch basin, drainage pipe and dissipation pool
Riding Mountain National Park -
Westman Communications Fiber - Phase 2 - Clear Lake Cabin Area
Riding Mountain National Park of Canada -
Westman Communications Fiber Optic Cable
Riding Mountain National Park -
Tiger Salamander Crossing
Riding Mountain National Park -
Clear Lake Pier Repairs
Riding Mountain National Park of Canada -
Lakeshore Trail Re-design
Riding Mountain National Park of Canada -
Mooswa East Water Line
Riding Mountain National Park -
Sanitary Force Main Pipeline Replacement Design and Construction - 15 Wing Moose Jaw
15 Wing Moose Jaw -
Water Distribution Network Replacement and Storm and Sanitary Network Rehabilitation at 15 Wing Moose Jaw
15 Wing Moose Jaw -
Remediate Sites and Construct Buildings for Future Aircrew Training (FAcT) Program- 15 Wing Moose Jaw
15 Wing Moose Jaw -
Runway Rehabilitation - 15 Wing Moose Jaw
15 Wing Moose Jaw -
Westman Communications Fibre Optic throughout Wasagaming
Riding Mountain National Park of Canada -
Rolling River First Nation - Construction of Three Bridges
Rolling River Reserve 67 -
Hydro - North Shore Line Project
Riding Mountain National Park of Canada -
New Fibre Installation
Riding Mountain National Park