Carry The Kettle First Nation Lagoon Expansion
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The Proposed Project
A new HDPE DR 11 Sewage Force main to be installed in the ditch of the lagoon access road parallel to the existing sewage force main. New Storage 66,000 Cubic Metres storage cell for the facultative lagoon. New 1.5 Ha Primary Cell for the Facultative Lagoon
New Wet Dry Style Sewage Pumping Station.
During construction top soil will be stripped, the ground will be excavated and lagoon berms will be constructed around the excavation. The lagoon will be lined with a HDPE liner to prevent effluent from seeping into the ground. Weeping tile will be installed under the liner. 300mm of sand will be installed on top of the liner for puncture protection. Topsoil will be replaced on the berms and seeded. Concrete effluent transfer structures will be installed for the new lagoon cells.
A new sewage forcemain will be installed via open trenching down the ditch of an existing roadway next to the existing sewage force main. Top soil will be stripped, replaced and seeded upon completion.
The new sewage pumping station will be excavated near the existing sewage pumping station to tie-into existing gravity sewer infrastructure. The structure will be approximately 6-7 meters in depth and will be comprised of concrete walls. The area will be excavated, temporary formwork for the walls will be constructed, rebar placed and concrete poured. Upon completion of the foundation a small 750 square foot building will be constructed housing a backup generator, motor control center and pumping equipment.
General construction waste, wood, plastics, and access materials will be disposed of off site properly as per provincial laws and regulations. Any access soils and earthworks will be used in the thickening of the lagoon berms.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination for Carry The Kettle First Nation Lagoon Expansion | - | May 31, 2021 |
1 | Public Comment Period on Intent to Make a Determination | - | April 30, 2021 |
Contacts
ISC-SKENVIndigenous Services Canada
1827 Albert Street
Regina, Saskatchewan S4P 2S9
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca
-
Location
- Assiniboine IR 76 (Saskatchewan)
-
Nature of Activity
- Water Management
- Waste Management
-
Assessment Status
Completed -
Start Date
2022-06-01 -
Proponent
Carry The Kettle First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
81589
Nearby assessments
...within 200 kilometres-
Carry the Kettle First Nation - Nakota Junction Gas Station
Assiniboine IR 76 -
Carry The Kettle First Nation Solid Waste Transfer Station
Assiniboine IR 76 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NE-32-17-10-2
Cowessess First Nation -
Peepeekisis Community Centre Gas Bar
Peepeekisis IR #81 -
Saskatchewan Agriculture Drainage Network - Vipond Drainage Network Project
6 kilometres east of Glenavon -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NW-16-12-10-2
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-18-12-10-2
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-23-12-10-2
Cowessess First Nation -
Albany Potash Mine Project
30 kilometers southeast of Regina, Saskatchewan, within the Regional Municipalities of Lajord and Francis -
Muscowpetung Powwow Arbour
Muscowpetung IR 80 -
Zagime Anishinabek School
Sakimay IR 74 -
Zagime Greenhouse
Zagime IR #74-9 / IR #74-2 -
Zagime Anishinabëk Gasification
Zagime Anishinabëk Indian Reserves 74, 74-2, 74-9, 74-12, 74-16, 74-17 and Shesheep IR 74A -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NW-23-14-05-2
Cowessess First Nation -
Basadinaa - Crooked Lake Cottage Lots Head Lease #5- Zagime Anishinabek First Nation
Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #5- Zagime Anishinabek First Nation
Shesheep IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #4- Zagime Anishinabek First Nation
Shesheep IR 74A -
Basadinaa - Crooked Lake Cottage Lots Head Lease #4- Zagime Anishinabek First Nation
Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots
Shesheep IR 74A & Sakimay IR 74 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NE-06-17-05-02
Cowessess First Nation -
Basadinaa - Crooked Lake Cottage Lots Head Lease #3- Zagime Anishinabek First Nation
Sakimay IR 74, Shesheep IR 74A -
Peepeekisis Community Centre
Peepeekisis IR #81 -
Pasqua First Nation - New Spray Park
Pasqua 79 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-09-15-05-2
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation
Cowessess First Nation -
Standing Buffalo Dakota Nation - Water Treatment Plant Upgrade
Standing Buffalo IR 78 -
Standing Buffalo Dakota Nation - Solid Waste Transfer Station
Standing Buffalo IR 78 -
Crooked Lake Outlet Structure Replacement
Crooked Lake - SW-08-19A-05 W2M -
Pasqua First Nation Elders's Centre
Pasqua First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SE-08-19a-05-2
Cowessess First Nation -
Cowessess - Agricultural Permit Gordon D. Lerat
Cowessess Indian Reserve 73 -
Ocean Man Indian Reserve 69E Well pad2
Ocean Man Indian Reserve 69E -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NW-23-14-05-2
Cowessess First Nation -
Kahkewistahaw First Nation Solid Waste Transfer Station
Kahkewistahaw IR 72 -
New (Multiple) Tower Construction
School Tower -
Okanese First Nation Head Start Building Construction
Okanese First Nation -
Meadow Lake Tribal Council: Solar Project
NE¼-31-09-09 W2M -
Saskatchewan Agriculture Drainage Network - Wascana Block A Drainage Network Project
25 kilometres southeast of Regina -
Ocean Man First Nation 1 MW Solar Project
Ocean Man IR 69I -
Okanese Cree Nation - Water Treatment Plant Upgrade
Okanese IR 82 -
Kahkewistahaw First Nation Lagoon Upgrade
Kahkewistahaw IR 72 -
Bekevar Wind Energy Project
Cowessess IR No. 73A -
Kahkewistahaw First Nation Subdivision Development (Phase 23)
Kahkewistahaw IR 72 -
Star Blanket Water Treatment Plant Upgrades
Star Blanket First Nation -
Ocean Man Indian Reserve 69E Well pad
Ocean Man Indian Reserve 69E -
Ocean Man Indian Reserve 69E Pipeline3
Ocean Man Indian Reserve 69E -
Ocean Man Indian Reserve 69E Pipeline2
Ocean Man Indian Reserve 69E -
New (Multiple) Tower Construction
Muscowpetung Saulteaux Nation - South Tower -
Cowessess 10 MW Solar Project
Cowessess IR #73 -
Ocean Man Indian Reserve 69 Well Pad FS-2023
Ocean Man Indian Reserve 69 -
Ocean Man Indian Reserve 69E Pipeline4
Ocean Man Indian Reserve 69E -
Notice of Determination -Start of Public Comment Period
Muscowpetung Saulteaux Nation -
Awasis Solar - 10 MW Project
Cowessess IR #73 -
Awasis Solar Project
SE 7-17-18 W2 -
Zagime Anishinabek Solid Waste Transfer Station
Sakimay IR 74 -
SaskPower's Power Generation - Ocean Man Solar Interconnect
Ocean Man IR 69I -
New (Multiple) Tower Construction
Muscowpetung Saulteaux Nation - North Tower -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-29-20-04-2
Cowessess First Nation -
Saskatchewan Agriculture Drainage Network - Lang West Drainage Network Project
32 kilometres northwest of Weyburn -
New (Multiple) Tower Construction
PHEASANT RUMP NAKOTA BAND I.R. 68 (Site #2) -
Enbridge Line 3 Replacement Program
Regina -
Albert Street Building Development
1246 Albert Street, Regina, Saskatchewan -
1236 Albert Street - Cowessess First Nation - Building Development
Cowessess IR No. 73 -
Cowessess Urban Indigenous Health centre
Cowessess Indian reserve No. 73 -
1201 Angus Street - Cowessess First Nation - Building Development for parking
Cowessess IR No. 73 -
Piapot Lagoon, Forcemain and Sewage Pumping Station
Piapot IR 75 -
Runway De-Icing Liquid Storage Tank
Regina -
New (Multiple) Tower Construction
PHEASANT RUMP NAKOTA BAND I.R. 68 (Site #1) -
Runway 13-31 Rehabilitation
Regina -
Piapot First Nation Road to Community Wells
Piapot IR 75 -
West Land Road and Sewer Extension
Sakimay IR 74-6 -
Cultural Centre for Women, Girls and Two Spirited Band Members
Kisbey -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
New (Multiple) Tower Construction
PHEASANT RUMP NAKOTA INDIAN RESERVE NO. 68D (Site #3) -
Pheasant Rump Nakota Nation Subdivision Expansion
SW 19-08-005 W2M -
Pheasant Rump Nakota IR 68D Gasification Project
Pheasant Rump Nakota IR 68D -
Pheasant Rump Nakota First Nation - Cultural Centre
Pheasant Rump Nakota First Nation - Cultural Centre -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Zagime Anishinabek First Nation - Section 95 housing project
Sakimay 74-5 -
Saskatchewan Agriculture Drainage Network - Dry Lake Drainage Network Project
50 kilometres northeast of Weyburn -
Zagime Community Center
Zagime IR #74-3 -
Grazing Permits on Saskatchewan First Nations Reserve Lands
Saskatchewan First Nation Communities -
Agricultural permits on Saskatchewan First Nation Reserve Lands
Saskatchewan First Nations -
White Bear First Nation Community Spray Park
White Bear 70 -
Muskowekwan Gas Bar & Convenience Store
Muskowekwan IR 85 -
Hutterite Brethren Church of Twin Creek Inc. - Grazing Permit - Muskowekwan First Nation - 2019-2023
Muskowekwan 85-10 and 85-15 -
Muskowekwan Solid Waste Transfer Station
Muskowekwan IR 85 -
Muskowekwan Water Treatment Plant Upgrades
Muskowekwan IR 85 -
Yorkton Tribal Council Child & Family Services Office Building
Kahkewistahaw IR 92 A-1 -
Muskowekwan Lagoon & Sewage Pumping Station
Muskowekwan IR 85 -
Muskowekwan Potash Mine Project
Lestock -
Piapot Wind Farm Project
Piapot Indian Reserve 75 -
Pheasant Rump Nakota Nation Solid Waste Transfer Station
Pheasant Rump IR 68 -
Muskowekwan Wind Farm Project
Muskowekwan Indian Reserve 85-43, 85-49, 85-50, 85-63, 85-64, 85-65 -
Construction of a Royal Canadian Mounted Police Detachment in Estevan, Saskatchewan
Estevan -
Moose Jaw Combined Cycle Power Station Project
Moose Jaw -
TransCanada Energy East Pipeline Project
Moosomin -
PADCOM Potash Solution Mining Project
16 kilometres west of Russell -
Keeseekoose - Agricultural Permit - K. Martenuik
Keeseekoose - Agricultural Permit - K. Marteniuk -
WireIE (Canada) Inc. - Radiocommunication Tower - Torquay Border Crossing, Hwy 350, Torquay SK
Torquay Border Crossing -
Saskatchewan Agriculture Drainage Network - Blackbird Creek Drainage Network Project
50 kilometres east of Yorkton, Saskatchewan -
Oungre Port of Entry Redevelopment
Oungre Port of Entry -
Estevan Port of Entry Redevelopment
Estevan Port of Entry -
Key Junction Gas Bar & Confectionery
The Key First Nation -
Saskatchewan Agriculture Drainage Network - Saline Lake Drainage Network Project
100 kilometres northwest of Yorkton -
Birdtail Sioux First Nation Aerated Lagoon Project
Birdtail Lagoon First Nation -
North Portal Septic Tank Replacement
North Portal -
Fishing Lake First Nation - Sewage Lagoon Expansion
Fishing Lake IR 89A -
Birdtail Sioux Dakota Nation - Prevention Centre for the Delivery of FNCFS
Birdtail Sioux Dakota Nation -
Last Mountain Lake National Wildlife Area Observation Tower II
Last Mountain Lake National Wildlife Area -
Stalwart National Wildlife Area Water Control Structure Re-naturalization Project
Stalwart National Wildlife Area -
Solid Waste Transfer Station - Fishing Lake First Nation
Fishing Lake Indian Reserve 89 -
WireIE (Canada) Inc. - Antenna Structure - Regway Border Crossing, Hwy 6, Regway SK
Regway Border Crossing -
Regway Port of Entry Redevelopment
Regway Port of Entry -
Agricultural permit - Fishing Lake - C. Fehr #2
Fishing Lake IR 89 -
Fishing Lake First Nation - Agricultural Permit - C. Fehr
Fishing Lake IR 89 -
WireIE (Canada) Inc. - Radiocommunication Tower - Northgate Border Crossing, Hwy 9, Northgate SK
Northgate Border Crossing -
Enbridge Line 3 Replacement Program
Cromer -
Cote First Nation Solid Waste Transfer Station
Cote IR 64 -
Cote First Nation Main Landfill Decommissioning
Cote IR 64 -
Cote First Nation #64 - Landfill decommissioning at the Main Landfill Site
Badgerville -
Walkway to support healthy lifestyle for Cote First Nation
Bagerville -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southwest -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northwest -
Cote First Nation Wood Treatment Remediation Project
Cote IR 64 -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southeast -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northeast -
Keeseekoose Multi-Purpose Health facility
Keeseekoose IR 66 -
Keeseekoose - Agricultural Permit - S. Marsh
Keeseekoose - Agricultural Permit - S. Marsh -
Saskatchewan Agriculture Drainage Network - 600 Creek Drainage Network Project
20 kilometers southeast of Storthoaks -
Tower Hill VHF Tower
Riding Mountain National Park