Ochapowace Nation Water Treatment Plant Upgrades
Ochapowace Nation is proposing the construction of the water treatment upgrade (WTP) project. The project involves construction of a new WTP located immediately south of the existing WTP in the community core area, upgrades to the existing raw water supply infrastructure at the existing well site located approximately 6 km northeast of the WTP, and installation of two new wells and ancillary control building at a proposed well site located approximately 800m east of the existing well site. The existing well will be decommissioned. The installation of approximately 800 m of raw water main located alongside an existing gravel road within the developed roadway allowance.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination for the Okanese Water Treatment Plant Upgrades | - | July 2, 2025 |
| 1 | Notice of Intent to Make a Determination - Start of Public Comment Period | - | May 27, 2025 |
Contacts
ISC-SKENVIndigenous Services Canada
Alvin Hamilton Building, 1783 Hamilton Street
Regina, Saskatchewan S4P 2B6
Telephone: 306-581-3134
Email: isc-skenv@sac-isc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Ochapowace Nation (Saskatchewan)
-
Nature of activity
- Water Management
-
Assessment status
Completed -
Start date
2025-05-27 -
Proponent
Ochapowace Nation -
Authorities
- Indigenous Services Canada
-
Assessment type
Project on federal lands -
Reference number
89567
Nearby assessments
...within 200 kilometres-
Ochapowace Nation Landfill Decommissioning
Ochapowace Nation -
New Fibre Installation
Project Site 5: Ochapowace -
Ochapowace Nation Subdivision - Phase I
Ochapowace Nation -
Active Transportation for Ochapowace First Nation
Active Transportation for Ochapowace First Nation -
Kahkewistahaw First Nation Subdivision Development (Phase 23)
Kahkewistahaw IR 72 -
Kahkewistahaw First Nation Water Treatment Plant Upgrade
Kahkewistahaw First Nation -
New Fibre Installation
Project Site 4: Kahkewistahaw -
Kahkewistahaw First Nation Green Links and Teaching Garden: Connecting Elders and Youth
Kahkewistahaw First Nation -
Kahkewistahaw First Nation Lagoon Upgrade
Kahkewistahaw IR 72 -
Kahkewistahaw First Nation Operations & Maintenance Building and Fire Hall
Kahkewistahaw First Nation -
Kahkewistahaw First Nation Solid Waste Transfer Station
Kahkewistahaw IR 72 -
Kahkewistahaw First Nation Community Landfill Reclamation
KAHKEWISTAHAW 72 -
Cowessess - Agricultural Permit G. Lerat
Cowessess Indian Reserve 73 -
Cowessess First Nation Solid Waste Transfer Station
Cowessess First Nation -
Zagime Anishinabek Solid Waste Transfer Station
Sakimay IR 74 -
New Fibre Installation
Project Site 2: Cowessess -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NE-06-17-05-02
Cowessess First Nation -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-06-17-05-2
Cowessess First Nation -
Crooked Lake Outlet Structure Replacement
Crooked Lake - SW-08-19A-05 W2M -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SE-08-19a-05-2
Cowessess First Nation -
Blanket Permit - SaskEnergy - Gasification of Sakimay
Sakimay -
Zagime Anishinabek Youth Centre
Sakimay Indian Reserve No. 74 -
New Fibre Installation
Project Site 3: Zagime Anishinabek -
Zagime Anishinabek Youth Safe House
Shesheep Indian Reserve No. 74A -
Zagime Anishinabek Water Treatment Plant and Sewage Pumping Station Upgrade
Zagime Anishinabek First Nations -
Zagime Anishinabek School
Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #4- Zagime Anishinabek First Nation
Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #5- Zagime Anishinabek First Nation
Sakimay IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #5- Zagime Anishinabek First Nation
Shesheep IR 74 -
Basadinaa - Crooked Lake Cottage Lots Head Lease #4- Zagime Anishinabek First Nation
Shesheep IR 74A -
Basadinaa - Crooked Lake Cottage Lots
Shesheep IR 74A & Sakimay IR 74 -
Zagime Anishinabëk Gasification
Zagime Anishinabëk Indian Reserves 74, 74-2, 74-9, 74-12, 74-16, 74-17 and Shesheep IR 74A -
Zagime Anishinabek New Subdivision Project
Zagime Anishinabek -
Basadinaa - Crooked Lake Cottage Lots Head Lease #3- Zagime Anishinabek First Nation
Sakimay IR 74, Shesheep IR 74A -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-29-20-04-2
Cowessess First Nation -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-09-15-05-2
Cowessess First Nation -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Saskatchewan Agriculture Drainage Network - Atwater Drainage Network Project
60 kilometres southeast of Yorkton -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NW-23-14-05-2
Cowessess First Nation -
Zagime Greenhouse
Zagime IR #74-9 / IR #74-2 -
Vertical Farming and Sustainable Grazing for Food Security and Innovation
near Grenfell -
Bekevar Wind Energy Project
Cowessess IR No. 73A -
Zagime Anishinabek First Nation - Section 95 housing project
Sakimay 74-5 -
Saskatchewan Agriculture Drainage Network - Vipond Drainage Network Project
6 kilometres east of Glenavon -
Peepeekisis Community Centre Gas Bar
Peepeekisis IR #81 -
Zagime Community Center
Zagime IR #74-3 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NE-32-17-10-2
Cowessess First Nation -
SaskPower Rural Rebuild - 2D-41 Birmingham Southwest
Star Blanket Indian Reserve No. 83-D -
PADCOM Potash Solution Mining Project
16 kilometres west of Russell -
Energy East Project
Moosomin -
Carry The Kettle First Nation Solid Waste Transfer Station
Assiniboine IR 76 -
New (Multiple) Tower Construction
PHEASANT RUMP NAKOTA BAND I.R. 68 (Site #2) -
Carry The Kettle First Nation Lagoon Expansion
Assiniboine IR 76 -
Ocean Man First Nation 1 MW Solar Project
Ocean Man IR 69I -
Star Blanket Cree Nation, Okanese First Nation, and Little Black Bear Band Regional Waste Diversion Center
Star Blanket Cree Nation -
Carry the Kettle First Nation - Nakota Junction Gas Station
Assiniboine IR 76 -
Pheasant Rump Nakota First Nation Road Improvements
Pheasant Rump Nakota First Nation -
Blanket Permit - SaskEnergy - Gasification of Assiniboine Indian Reserve No. 76
Assiniboine Reserve No. 76 -
Peepeekisis Cree Nation Youth Impact Centre
Peepeekisis Cree Nation -
Peepeekisis Community Centre
Peepeekisis IR #81 -
White Bear First Nation Solid Waste Transfer Station Project
White Bear First Nation -
New Fibre Installation
Project Site 1: White Bear -
Yorkton Tribal Council Child & Family Services Office Building
Kahkewistahaw IR 92 A-1 -
Ocean Man Indian Reserve 69E Well pad
Ocean Man Indian Reserve 69E -
Ocean Man Indian Reserve 69E Pipeline2
Ocean Man Indian Reserve 69E -
Ocean Man Indian Reserve 69E Pipeline3
Ocean Man Indian Reserve 69E -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-23-12-10-2
Cowessess First Nation -
Ocean Man Indian Reserve 69 Well Pad FS-2023
Ocean Man Indian Reserve 69 -
Ocean Man Indian Reserve 69E Pipeline4
Ocean Man Indian Reserve 69E -
White Bear First Nation Wastewater Upgrade Project
White Bear First Nation -
Ocean Man Indian Reserve 69E Well pad2
Ocean Man Indian Reserve 69E -
Keeseekoose - Agricultural Permit - K. Martenuik
Keeseekoose - Agricultural Permit - K. Marteniuk -
New (Multiple) Tower Construction
PHEASANT RUMP NAKOTA BAND I.R. 68 (Site #1) -
Ocean Man First Nation Headstart and Daycare
Ocean Man Indian Reserve No. 69 -
White Bear First Nation Community Spray Park
White Bear 70 -
Peepeekisis Cree Nation Community Lagoon Improvements
PEEPEEKISIS INDIAN RESERVE NO. 81 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation NW-16-12-10-2
Cowessess First Nation -
Okanese Lagoon Access Road Upgrades
Okanese First Nation -
Okanese First Nation Head Start Building Construction
Okanese First Nation -
Okanese Cree Nation - Water Treatment Plant Upgrade
Okanese IR 82 -
SaskPower's Power Generation - Ocean Man Solar Interconnect
Ocean Man IR 69I -
Peepeekisis Cree Nation Youth Safe House
PEEPEEKISIS INDIAN RESERVE NO. 81 -
Blanket Permit - SaskEnergy - Gasification of Okanese Indian Reserve No. 82
Okanese First Nation -
Peepeekisis Cree Nation Road Construction
PEEPEEKISIS INDIAN RESERVE NO. 81 -
Restoring Wetlands Within the Lake Winnipeg Basin with Cowessess First Nation SW-18-12-10-2
Cowessess First Nation -
Saskatchewan Agriculture Drainage Network - Blackbird Creek Drainage Network Project
50 kilometres east of Yorkton, Saskatchewan -
Birdtail Sioux First Nation Aerated Lagoon Project
Birdtail Lagoon First Nation -
Little Black Bear First Nation Water Treatment Plant Upgrades
LITTLE BLACK BEAR INDIAN RESERVE NO. 84 -
Birdtail Sioux Dakota Nation Prevention Centre for the Delivery of FNCFS
Birdtail Sioux Dakota Nation -
Pheasant Rump Lagoon Expansion
Pheasant Rump Nakota IR 68D -
Cultural Centre for Women, Girls and Two Spirited Band Members
Kisbey -
Pheasant Rump Nakota IR 68D Gasification Project
Pheasant Rump Nakota IR 68D -
New (Multiple) Tower Construction
PHEASANT RUMP NAKOTA INDIAN RESERVE NO. 68D (Site #3) -
Star Blanket Water Treatment Plant Upgrades
Star Blanket First Nation -
Pheasant Rump Nakota Nation Subdivision Expansion
SW 19-08-005 W2M -
Pheasant Rump Nakota First Nation - Cultural Centre
Pheasant Rump Nakota First Nation - Cultural Centre -
Meadow Lake Tribal Council: Solar Project
NE¼-31-09-09 W2M -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southwest -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northwest -
Waywayseecappo First Nation - Water Treatment Plant
Waywayseecappo First Nation -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southeast -
Waywayseecappo - New Water Treatment Plant - 2324
Waywayseecappo WTP -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northeast -
Waywayseecappo First Nation - School Water Treatment Plant Recovery
Waywayseecappo First Nation -
Key Junction Gas Bar & Confectionery
The Key First Nation -
Standing Buffalo Day Care and Head Start
Standing Buffalo Indian Reserve No. 78 -
Standing Buffalo Gas Station Expansion
Standing Buffalo Dakota Nation -
Standing Buffalo Dakota Nation - Solid Waste Transfer Station
Standing Buffalo IR 78 -
Standing Buffalo Dakota Nation - Water Treatment Plant Upgrade
Standing Buffalo IR 78 -
Standing Buffalo Dakota Nation Youth Centre
Standing Buffalo Indian Reserve No. 78 -
Cote First Nation Solid Waste Transfer Station
Cote IR 64 -
Pasqua First Nation - New Spray Park
Pasqua 79 -
Pasqua First Nation Subdivision Phase 4
Pasqua First Nation -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Cromer -
Pasqua First Nation Lagoon Upgrade
Pasqua First Nation -
Pasqua First Nation Solid Waste Transfer Station
Treaty Four Reserve Grounds 77 -
Pheasant Rump Nakota Nation Solid Waste Transfer Station
Pheasant Rump IR 68 -
Tower Hill VHF Tower
Riding Mountain National Park -
PARKS CANADA AGENCY - Riding Mountain National Park (West Side) Addition of New Site Known as Tower Hill
PARKS CANADA AGENCY - Riding Mountain National Park (West Side) -
Albany Potash Mine Project
30 kilometers southeast of Regina, Saskatchewan, within the Regional Municipalities of Lajord and Francis -
Pasqua First Nation Elders's Centre
Pasqua First Nation -
Muscowpetung Powwow Arbour
Muscowpetung IR 80 -
New (Multiple) Tower Construction
School Tower -
Pope National Wildlife Area Water Control Structure Renaturalization Project
Pope National Wildlife Area -
Pope National Wildlife Area Spillway Replacement Project
Pope National Wildlife Area -
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324 -
Tootinaowaziibeeng - CFS Prevention Building Project
Tootinaowaziibeeng -
Kawacatoose First Nation Road Repair Project
Kawacatoose First Nation -
New Fibre Installation - Central and Southeastern SK
Project site 1: Cote 64 -
Baldy Prescribed Fire
Riding Mountain National Park of Canada -
Cote First Nation Main Landfill Decommissioning
Cote IR 64 -
Cote First Nation #64 - Landfill decommissioning at the Main Landfill Site
Badgerville -
New (Multiple) Tower Construction
Muscowpetung Saulteaux Nation - North Tower -
Walkway to support healthy lifestyle for Cote First Nation
Bagerville -
New (Multiple) Tower Construction
Muscowpetung Saulteaux Nation - South Tower -
Upgrade Single Tower & New Fibre Installation
Project Site 2: Central East region -Badgerville -
New Fibre Installation - Central and Southeastern SK
Project site 6: COTE I.R. 64 -
Muscowpetung Powwow Arbour
Muscowpetung Saulteaux Nation -
Cote First Nation Wood Treatment Remediation Project
Cote IR 64 -
Muscowpetung Daycare & Headstart
Muscowpetung First Nation -
Muscowpetung Saulteaux Nation New School
MUSCOWPETUNG INDIAN RESERVE NO.80 -
Menzies Prescribed Fire
Riding Mountain National Park of Canada -
Muscowpetung Saulteaux Nation - Solid Waste Transfer Station
Muscowpetung Saulteaux Nation -
Keeseekoose Education Center Drainage
KEESEEKOOSE INDIAN RESERVE NO. 66 -
Keeseekoose Multi-Purpose Health facility
Keeseekoose IR 66 -
New Fibre Installation - Central and Southeastern SK
Project site 10: KEESEEKOOSE I.R. 66 -
Hutterite Brethren Church of Twin Creek Inc. - Grazing Permit - Muskowekwan First Nation - 2019-2023
Muskowekwan 85-10 and 85-15 -
Saskatchewan Agriculture Drainage Network - Wascana Block A Drainage Network Project
25 kilometres southeast of Regina -
Keeseekoose - Agricultural Permit - S. Marsh
Keeseekoose - Agricultural Permit - S. Marsh -
Keeseekoose First Nation Well Completions
KEESEEKOOSE INDIAN RESERVE NO. 66 -
Keeseekoose Road to Community Wells
KEESEEKOOSE INDIAN RESERVE NO. 66 -
Agricultural permits on Saskatchewan First Nation Reserve Lands
Saskatchewan First Nations -
Grazing Permits on Saskatchewan First Nations Reserve Lands
Saskatchewan First Nation Communities -
The Key First Nation Lagoon Upgrade Project
The Key First Nation -
The Key First Nation Firehall
The Key First Nation -
Cowessess 10 MW Solar Project
Cowessess IR #73 -
Muskowekwan Gas Bar & Convenience Store
Muskowekwan IR 85 -
Awasis Solar - 10 MW Project
Cowessess IR #73 -
Awasis Solar Project
SE 7-17-18 W2 -
Awasis Organics Facility
COWESSESS INDIAN RESERVE NO. 73 -
Muskowekwan Solid Waste Transfer Station
Muskowekwan IR 85 -
Piapot Lagoon, Forcemain and Sewage Pumping Station
Piapot IR 75 -
Muskowekwan Water Treatment Plant Upgrades
Muskowekwan IR 85 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Keeseekoowenin First Nation (Indian Reserve 61) Project site 2 -
Keeseekoowenin Ojibway First Nation - Water Treatment Plant and Upgraded Lagoon
Keeseekoowenin Ojibway First Nation -
Muskowekwan Lagoon & Sewage Pumping Station
Muskowekwan IR 85 -
Muskowekwan Potash Mine Project
Lestock -
Water Retention within the Lake Winnipeg Basin with Sioux Valley Dakota Nation
Sioux Valley Dakota Nation -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Keeseekoowenin First Nation (Indian Reserve 61) Project site 1 -
Muskowekwan First Nation Wastewater Infrastructure Upgrades
MUSKOWEKWAN INDIAN RESERVE NO. 85 -
Seech-Hopper 3 Prescribed Fire
Riding Mountain National Park of Canada -
Piapot First Nation Road to Community Wells
Piapot IR 75 -
Erosion Control on Hales Creek within the Lake Winnipeg Basin with Sioux Valley Dakota Nation
Sioux Valley Dakota Nation -
Saskatchewan Agriculture Drainage Network - 600 Creek Drainage Network Project
20 kilometers southeast of Storthoaks -
Construction of a Royal Canadian Mounted Police Detachment in Estevan, Saskatchewan
Estevan -
Saskatchewan Agriculture Drainage Network - Lang West Drainage Network Project
32 kilometres northwest of Weyburn -
Bell AI Fabric Data Centre Project
Rural Municipality of Sherwood -
Jackfish Creek Bison Pasture Expansion
Riding Mountain National Park -
Extension of Bison Enclosure South onto Plains Rough Fescue Grassland Restoration Area
Riding Mountain National Park -
On hold - Muskowekwan Wind Farm Project
Muskowekwan Indian Reserve 85-43, 85-49, 85-50, 85-63, 85-64, 85-65 -
Saskatchewan Agriculture Drainage Network - Saline Lake Drainage Network Project
100 kilometres northwest of Yorkton -
George Gordon First Nation Solid Waste Remediation
GEORGE GORDON FIRST NATION NO. 86 -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Regina -
1236 Albert Street - Cowessess First Nation - Building Development
Cowessess IR No. 73 -
Albert Street Building Development
1246 Albert Street, Regina, Saskatchewan -
Cowessess Urban Indigenous Health centre
Cowessess Indian reserve No. 73 -
1201 Angus Street - Cowessess First Nation - Building Development for parking
Cowessess IR No. 73 -
Piapot First Nation Commercial Office Building
Piapot Urban Reserve, Regina -
Jackfish Creek Prescribed Fire
Riding Mountain National Park of Canada -
Multi-use Front Lake Community Walking Path
Multi-use Front Lake Community Walking Path -
George Gordon First Nation Lagoon Upgrades
Gordon 86 Indian Reserve -
George Gordon First Nation Wastewater Infrastructure Upgrades
Gordon 86 Indian Reserve -
Installation of Potassium Acetate Tanks - Public Comments Invited
Regina International Airport -
Installation of Potassium Acetate Tanks - Public Comments Invited
Regina International Airport -
Runway De-Icing Liquid Storage Tank
Regina -
George Gordon First Nation Fire Hall
George Gordon First Nation -
Runway 13-31 Rehabilitation
Regina -
West Land Road and Sewer Extension
Sakimay IR 74-6 -
Saskatchewan Indigenous Enterprise Foundation Inc. Southern Office Complex
Lot 19 Plan 112422, NE 1/4 Sec. 20-17-20, W.2 M -
North Portal Septic Tank Replacement
North Portal -
WireIE (Canada) Inc. - Radiocommunication Tower - Northgate Border Crossing, Hwy 9, Northgate SK
Northgate Border Crossing -
Sage Meadow Development Phase 1A Infrastructure Works
Saulteaux Junction Indian Reserve No.76 -
South Lake Prescribed Fire
Riding Mountain National Park of Canada -
Smallmouth Bass Project
Riding Mountain National Park -
Estevan Port of Entry Redevelopment
Estevan Port of Entry -
Utility Service Agreement BELL MTS Inc. Moon Lake Telecommunications Tower
Riding Mountain National Park -
MB Hydro Pole and Arm Replacement
Riding Mountain National Park of Canada -
Ominnik Marsh Trail Accessibility Reroute
Riding Mountain National Park -
Rolling River First Nation - Construction of Three Bridges
Rolling River Reserve 67 -
Research, Monitoring and Management of Invasive Smallmouth Bass in Clear Lake, Riding Mountain National Park
Riding Mountain National Park -
Ominnik Marsh Trail Anchor System & Boardwalk Replacement
Riding Mountain National Park of Canada -
Management of Zebra Mussels in Clear Lake in Riding Mountain National Park
Riding Mountain National Park of Canada -
New Cabin 56-4th St. S. Clear Lake Cabin Area
Riding Mountain National Park of Canada -
Westman Communications Fiber - Phase 2 - Clear Lake Cabin Area
Riding Mountain National Park of Canada -
Westman Communications Fiber Optic Cable
Riding Mountain National Park -
Northeast end of Clear Lake Cabin area storm water catch basin, drainage pipe and dissipation pool
Riding Mountain National Park -
Tiger Salamander Crossing
Riding Mountain National Park -
New Resort Development - 116 TaWaPit Drive, Wasagaming
Riding Mountain National Park -
Clear Lake Pier Repairs
Riding Mountain National Park of Canada -
Lakeshore Trail Re-design
Riding Mountain National Park of Canada -
WireIE (Canada) Inc. - Radiocommunication Tower - Carievale Border Crossing, Hwy 8, Carievale SK
Carievale Border Crossing -
Fishing Lake First Nation - Sewage Lagoon Expansion
Fishing Lake IR 89A -
New (Multiple) Tower Construction
Poject site 8: Kawacatoose FN I.r. 88 -
Mooswa East Water Line
Riding Mountain National Park -
Westman Communications Fibre Optic throughout Wasagaming
Riding Mountain National Park of Canada -
Boreal Trail Reconstruction
Riding Mountain National Park of Canada -
2026-2029 Wildfire Risk Reduction Wasagaming
Riding Mountain National Park of Canada -
Hydro - North Shore Line Project
Riding Mountain National Park of Canada -
New Fibre Installation
Riding Mountain National Park -
Northgate-Riding Mountain National Park Trail Expansion
Riding Mountain National Park of Canada -
Edwards Creek Trail Upgrade Proposal
Riding Mountain National Park of Canada -
New (Multiple) Tower Construction
Poject site 7: Kawacatoose FN I.r. 88 -
Wasagaming Wildfire Risk Reduction 2023-2026
Riding Mountain National Park -
New (Multiple) Tower Construction
Poject site 6: Kawacatoose FN I.r. 88 -
Saskatchewan Agriculture Drainage Network - Dry Lake Drainage Network Project
50 kilometres northeast of Weyburn -
Clear Lake Golf Course Clubhouse Patio
Riding Mountain National Park of Canada -
North Shore Hydro Distribution Line Rebuild
Riding Mountain National Park of Canada -
Solid Waste Transfer Station - Fishing Lake First Nation
Fishing Lake Indian Reserve 89 -
New (Multiple) Tower Construction
Poject site 3: Kawacatoose FN I.r. 88 -
Grey Owl Parking Lot Privy and Reroute
Riding Mountain National Park -
Fishing Lake First Nation Prevention Centre
FISHING LAKE INDIAN RESERVE NO. 89 -
Kawacatoose First Nation Water Treatment Plant Upgrade and Expansion
Kawacatoose IR 88 -
Fishing Lake First Nation - Agricultural Permit - C. Fehr
Fishing Lake IR 89 -
Agricultural permit - Fishing Lake - C. Fehr #2
Fishing Lake IR 89 -
New (Multiple) Tower Construction
Poject site 2: Kawacatoose FN I.r. 88 -
Pine Creek and Ebb and Flow - Anishinaabe Aki Petro-Can Gas Bar in Dauphin, MB - 2425
Dauphin -
New (Multiple) Tower Construction
Poject site 1: Kawacatoose FN I.r. 88 -
New (Multiple) Tower Construction
Poject site 4: Kawacatoose FN I.r. 88 -
Highway 19 Urgent Maintenance, Ditch Development and Culvert Replacements
Riding Mountain National Park of Canada -
WireIE (Canada) Inc. - Radiocommunication Tower - Torquay Border Crossing, Hwy 350, Torquay SK
Torquay Border Crossing -
New (Multiple) Tower Construction
Poject site 5: Kawacatoose FN I.r. 88 -
Waywayseecappo First Nation Elton Property Gas Bar
Waywayseecappo First Nation -
Highway 19 Roadway Rehabilitation Addendum 2 Swanson Creek Culvert
Riding Mountain National Park -
Brandon Dispatchable Capacity Project
East Brandon Industrial Area within the City of Brandon -
Oungre Port of Entry Redevelopment
Oungre Port of Entry -
Escarpment Trailhead Sign Replacement and New vault Privy
Riding Mountain National Park -
On hold - Piapot Wind Farm Project
Piapot Indian Reserve 75 -
Clear Lake Cabin Area Kayak Launch Site
Riding Mountain National Park