Brandon Dispatchable Capacity Project

Manitoba Hydro is proposing the expansion of an existing natural gas-fueled electricity generating facility, located in Brandon, Manitoba. As proposed, the Brandon Dispatchable Capacity Project would include the development of three new simple-cycle combustion turbines, with an anticipated increase in production capacity of approximately 750 megawatts. Project components would also include a 32-kilometre natural gas pipeline, two electrical transmission lines totalling 3.5 kilometres, and upgrades to the existing electrical transmission station. The project is expected to operate for about 30 years.


Latest update

September 18, 2026 — The Impact Assessment Agency of Canada terminated the impact assessment process for the Brandon Dispatchable Capacity Project. Following the coming into force of the Regulations Amending the Regulations Designating Physical Activities on September 3, 2026, it is no longer a designated project.

At a glance

Planning

Terminated assessment

Planning

Terminated 77/180 days

Key documents

Impact Statement

Impact Statement

Not applicable
Impact Assessment

Impact Assessment

Not applicable
Decision Making

Decision Making

Not applicable
Post Decision

Post Decision

Not applicable

Participate

Contacts

Impact Assessment Agency of Canada
160 Elgin Street, 22nd Floor
Ottawa ON K1A 0H3
Email: information@iaac-aeic.gc.ca

Media Relations
Impact Assessment Agency of Canada
160 Elgin Street, 22nd Floor
Ottawa ON K1A 0H3
Email: media@iaac-aeic.gc.ca


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

  • Location

    • East Brandon Industrial Area within the City of Brandon (Manitoba)
  • Nature of activity

    • Oil and Gas
  • Assessment status

    Terminated
  • Start date

    2026-06-29
  • Proponent

    Manitoba Hydro
  • Authorities

    • Impact Assessment Agency of Canada
  • Assessment type

    Planning Phase for Impact Assessment
  • Reference number

    90571

Nearby assessments

...within 200 kilometres
Date modified: