YWG Groundside Roadway Infrastructure Upgrade Project
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Winnipeg Airports Authority and Transport Canada must determine whether the proposed YWG Groundside Roadway Infrastructure Upgrade Project at Winnipeg Richardson International Airport (YWG), located in Winnipeg, Manitoba is likely to cause significant adverse environmental effects.
To help inform this determination, Winnipeg Airports Authority and Transport Canada are inviting comments from the public until June 29, 2022 respecting that determination. All comments received will be considered public and may be posted online.
The Proposed Project
Winnipeg Airports Authority proposes to undertake the YWG Groundside Roadway Infrastructure Upgrade Project at Winnipeg Richardson International Airport. The project area is entirely on developed lands that have supported continuous airport operations since 1928.
The project is for the rehabilitation of the airport outbound roadways Wellington Avenue and Flight Road as well as construction of an active transportation pathway for pedestrian and cyclist access to the air terminal. The project will include removal and construction of existing pavement surfaces, landscaping, land drainage sewers and street lighting infrastructure improvements. The project will allow for improved safety and efficient movement on the main exit roadways and active transportation pathways at the Airport with primary objective to improve public safety and access for vehicle, pedestrian, cyclist, and transit bus operations.
The proposed project will have staged construction with an anticipated two-year duration.
Latest update
Participate
Contacts
Winnipeg Airports Authority Inc.Andrew Curwain, Director, Airport Planning and Infrastructure
249-2000 Wellington Ave`
Winnipeg, Manitoba R3H 1C2
Telephone: 204-987-9400
Email: permits@waa.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Winnipeg Richardson International Airport (Manitoba)
-
Nature of Activity
- Airport and Airfields
-
Assessment Status
Completed -
Start Date
2022-05-30 -
Proponent
Winnipeg Airports Authority Inc. -
Authorities
- Transport Canada
- Winnipeg Airport Authority
-
Assessment Type
Project on federal lands -
Reference Number
83625
Nearby assessments
...within 200 kilometres-
T-201 Standard Aero Plant 6 Building Expansion
Winnipeg Richardson International Airport -
East Side Air Cargo Development at Winnipeg Richardson International Airport (YWG)
Winnipeg Richardson International Airport -
Electric Bus Charging Station Removal and Demolition
Winnipeg Richardson International Airport -
Perimeter Aviation T-5 Hangar Door Replacement
Winnipeg Richardson International Airport -
Perimeter Aviation Terminal Building Expansion
Winnipeg Richardson International Airport -
Keewatin Air T-216 Hanger - Medevac Facility Addition
Winnipeg Richardson International Airport -
2023 YWG Airfield Improvements Project
Winnipeg Richardson International Airport -
Perimeter Aviation LP Parking Lot
Winnipeg Richardson International Airport -
Avis overflow storage compound Sherwin Road - Decommissioning
Winnipeg Richardson International Airport -
New electrical service to existing building at 80 Hangar Line Road
Winnipeg Richardson International Airport (YWG) -
Runway 18-36 Rehabilitation at YWG
Winnipeg Richardson International Airport -
Hangar Line Road Extension - 17 Wing Winnipeg
17 Wing Winnipeg -
Upgrade of 17 Wing Vehicle Fuel Farm - 17 Wing Winnipeg
17 Wing Winnipeg -
17 Wing Winnipeg - V6600 Disposal of 13 RHUs and 18 Garages (South Site)
17 Wing Winnipeg -
Airport West Perimeter Road and Primary Security Line Relocation
Winnipeg Richardson International Airport -
T-283 SkyNorth Air Apron Pavement Expansion project
Winnipeg Richardson International Airport -
T-145 STARS Hangar Addition
Winnipeg Richardson International Airport -
T-149 & T-150 Air Canada Hangar, Petroleum Storage System Upgrades
Winnipeg Richardson International Airport -
Air Canada Hangar T-149 water supply refurbishment project
Winnipeg Richardson International Airport -
Generator Replacement and Fire Panel Upgrade at existing Hangar building
Winnipeg Richardson International Airport (YWG) -
Winnipeg Airport West Lands Moray Street Extension and Site Servicing
Winnipeg Richardson International Airport -
T-91 VORTAC Site Decommissioning
Winnipeg Richardson International Airport -
Naawi Oodena - Subdivision - Parcel A - 2324
Naawi Oodena -
Energy East Project
Winnipeg -
New (Multiple) Tower Construction & New Fibre Installation
Mosakahiken Cree Nation (Moose Lake), Northern Manitoba -
Temporary Dock - The Forks National Historic Site, Red River, MB
The Forks National Historic Site, Winnipeg -
Pond and Landscape Upgrade at the Winnipeg Tax Centre
Winnipeg -
Freshwater Institute Underground Chilled Water Piping Replacement
Freshwater Institute in Winnipeg, MB -
City of Winnipeg Insect Control Branch and Heliport Relocation Project
City of Winnipeg -
Manitoba-Minnesota Transmission Project
Riel Converter Station, near Dorsey, Manitoba -
St. Andrews Lock and Dam Bridge Deck Replacement
St. Andrews Lock and Dam -
Lower Fort Gary Wastewater Treatment Plant Outflow Pipe Replacement
Lower Fort Garry National Historic Site -
Selkirk CCG Asphalt paving
Selkirk Coast Guard Base -
Rockwood National Wildlife Area Water Control Structure Re-naturalization Project
Rockwood National Wildlife Area -
Vivian Sand Project
Springfield -
Brokenhead Ojibway Nation Land Base Building
Brokenhead Ojibway Nation - Reserve No. 4 -
Brokenhead Ojibway Nation - Cultural Healing Lodge Development
Brokenhead Ojibway Nation -
Brokenhead Ojibway Nation Elders Lodge Project
Brokenhead Ojibway Nation -
Brokenhead Ojibway Nation - Elder's Lodge - 2324
Brokenhead Ojibway Nation - Elder's Lodge - 2324 -
Multi-use Arbour & Powwow Grounds on Brokenhead Reserve
Scanterbury on the Brokenhead Reserve -
Brokenhead - CHRT41 - Jordan's Principle Building/Centre for BON - 2324
Brokenhead Jordan's Principle Centre -
Launch Ramp Replacement, Balsam Bay, Manitoba
Balsam Bay, Manitoba -
Dakota Tipi First Nation - New Jordan's Principle Facility
Dakota Tipi First Nation -
Gimli Harbour Launch Ramp Reconstruction - Gimli, MB - Winter 2021/22
Gimli Harbour, Gimli, MB -
Roseau River AFN Riverbank Stabilization Project
Roseau River AFN Riverbank Stabilization Project -
Roseau River Anishinaabe First Nation Waste Transfer Station
Roseau River Anishinaabe First Nation -
Long Plain FN - Directional Drilling - Water and Sewer Pipeline
Long Plain First Nation -
In Situ Decommissioning of the Whiteshell Reactor #1
Pinawa -
Long Plain School Renovation & Addition
Long Plain First Nation -
Long Plain - CHRT41 - Prevention Centre - P055810 - 2324
Long Plain First Nation -
Long Plain First Nation - Water Treatment Plant Upgrades
Long Plain First Nation -
Dakota Women's Lodge (Winyan Tipi)
Portage la Prairie -
Victoria Beach Hydrometric Stilling Well Removal - Winter 2024
Victoria Beach Harbour -
Victoria Beach Harbour Manitoba - Routine Maintenance Dredging of Lake Winnipeg at Victoria Beach - Winter 2019
Victoria Beach Harbour -
Morden Pesticide and Chemical Building Project
Morden -
Stanley Trail Association Community Pathway Project
Morden -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Gretna -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Morden -
Sagkeeng (Fort Alexander) Assisted Living Complex
Sagkeeng First Nation -
Arnes Harbour Manitoba - Routine Maintenance Dredging of the Drunken River at Lake Winnipeg - Winter 2019
Arnes Harbour -
Sagkeeng First Nation - Shoreline Stabilization - Segment 4
Sagkeeng First Nation -
Traverse Bay Shoreline Stabilization - Site A (North Shoreline)
Traverse Bay North Shoreline - Fort Alexander Reserve -
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection -
Winkler Port of Entry Redevelopment
Winkler Port of Entry -
Hnausa Harbour, Manitoba - FFMC Barge Loading Ramp Construction - Winter 2021
Hnausa Harbour -
Hnausa Harbour Manitoba - Harbour Dredging of Lake Winnipeg at Hnausa - Winter 2020-21
Hnausa Harbour -
Vehicle and Equipment Management Agency Radiocommunication Antenna Addition in Manitou, MB
Manitou -
Black River First Nation Watermain Renewal Project
Black River First Nation -
Black River First Nation - Transitional Housing
Black River First Nation -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Black River First Nation Reserve No. 260
Black River First Nation Reserve No. 260 -
Black River First Nation Prevention Centre
Black River First Nation -
New Fibre Installation
Black River First Nation no. 9 -
Black River Waste Transfer Station
Black River Reserve -
Launch Ramp Reconstruction - Riverton, Manitoba
Riverton, Manitoba -
Sandy Bay First Nation New Water Treatment Plant
Sandy Bay First Nation -
New Fibre Installation - Sandy Bay
Project site: Sandy Bay -
Sandy Bay First Nation CFS Prevention Center Temporary Facilities (10 RTMs)
Sandy Bay First Nation -
Swan Lake First Nation Youth & Prevention Centre
Swan Lake First Nation -
Xplornet Communications Inc. - XCS - Antenna Structure - Piney Port Border Crossing, Hwy 89, Piney Port, MB
Piney Port Border Crossing -
Lake Manitoba - South Access Road Upgrades - 2324
Lake Manitoba -
Float Replacement, Hecla, Manitoba
Hecla, Manitoba -
South Junction Port of Entry Redevelopment
South Junction Port of Entry -
Lake Manitoba First Nation - CHRT41 FNCFS Prevention Centre
Lake Manitoba First Nation -
New Fibre Installation
Project site: Various parts of Manitoba -
New Broadband Communications North Inc. Telecommunication Tower at Lake Manitoba First Nation on Dog Creek Reserve No. 46
Lake Manitoba First Nation, MB -
Trans-Canada Highway Twinning Project
Highway 17 at Manitoba/Ontario border -
Gull Harbour Lighthouse Rebuild
Gull Harbour -
Launch Ramp Reconstruction - Gull Harbour, MB - Fall 2021
Gull Harbour -
Subsurface Septic System Rehabilitation
Ontario -
New Fibre Installation - RFNOW
Project site 1: CA12:CARBS-SLFN-23 -
Shoal Lake 40 New K-8 School
Shoal Lake 40 -
New Fibre Installation
Project site 24 (Shoal Lake No.39) -
Women's Lodge & Cultural Safe Space
Kejick -
Wharf Reconstruction - Little Grindstone, MB - Winter/Spring 2020
Little Grindstone Harbour -
Hollow Water First Nation Transitional Spaces
Hollow Water First Nation -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Peguis First Nation Reserve No. 269
Peguis First Nation Reserve No. 269 -
Hollow Water First Nation Prevention Centre
Hollow Water First Nation -
Hollow Water - CHRT 41 - Staff Accommodations - 2324
Hollow Water - CHRT 41 - Staff Accommodations - 2324 -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 4: Hollow Water No. 10 -
New Fibre Installation
Hollow Water First Nation no.10 -
Sugar Creek Peat Harvesting Project
Fisher River Cree Nation -
New Peguis First Nation Radiocommunication Tower in Peguis, MB
Peguis, MB -
Hollow Water Wharf Construction
Hollow Water -
Peguis First Nation Recreation Centre Soil Remediation
Peguis First Nation Recreation Centre Soil Remediation -
Hydrometric Station Decommissioning - Fisher River, Manitoba
Fisher River, Manitoba -
New Fibre Installation
Project site 11 (Wabaseemoong Independent Nations) -
Sprague Port of Entry Redevelopment
Sprague Port of Entry -
Northwest Angle 33 First Nation Water Treatment Project - Angle Inlet
Northwest Angle #33 FN -
Fisher River Used Oil Burner Installation
Fisher River Cree Nation -
Fisher River Cree Nation East Road Replacement Project
Fisher River Cree Nation Reserve no. 44 -
Fisher River Cree Nation Jordan Principle Building
Fisher River Cree Nation -
Railway Crossings Upgrade - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Area A Security Fence - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Larkhill Avenue Reconstruction - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Construction of Land Vehicle Crew Training System Building - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Building Construction - Canadian Forces Base Shilo
Canadian Forces Base - Shilo -
Royal Avenue Reconstruction - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Ortona Road Fireguard Expansion - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Reconstruction of Rifle Range 2 - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Aldershot Road Reconstruction - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
N132 Petroleum, Oils and Lubricants (POL) Revitalization - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Addition to Buffalo Point First Nation Radiocommunication Tower at Buffalo Point, MB.
Buffalo Point, MB -
Base Refueling Point Tank Replacement
CFB/ASU Shilo -
Construction of New Supply Well- Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Construction of Land Vehicle Crew Training System Building
Canadian Forces Base/Area Support Unit Shilo -
Housing Renovations (HAYSL80) - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Construct Transition Centre - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Installation of Running Trail - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
New Staff Campground for Riding Mountain National Park
Riding Mountain National Park -
Clear Lake Cabin Area Kayak Launch Site
Riding Mountain National Park -
Demolition of Unnamed Building at Waggle Springs - Canadian Forces Base Shilo
Waggle Springs -
Windigo Island Dock Replacement Project
Animakee Wa Zhing #37 -
Upgrade of the Windigo Island Docking Infrastructure Accessibility
Windigo Islands -
Windigo Island Water Treatment Project
Animakee Wa Zhing First Nation - Windigo Island -
Ebb and Flow First Nation - Road and Drainage Upgrades
Ebb and Flow First Nation -
Xplornet Inc. Radiocommunication Antenna Addition on Ebb and Flow First Nation Reserve No. 280
Ebb and Flow First Nation Reserve No. 280 -
CSC97 - Ebb and Flow First Nation Water Supply Line Project
Ebb and Flow First Nation -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake Manitoba Outlet Channel inlet in Lake Manitoba -
Cartwright Port of Entry Redevelopment
Cartwright Port of Entry -
Xplornet Communications Inc. Telecommunication Tower at Canada Border Services Agency - Cartwright Port of Entry, MB
Cartwright, MB -
Trans-Canada Highway Twinning Project
Kenora -
East Trails Project - East Gate
Riding Mountain National Park -
Launch Ramp Reconstruction - Calders Dock, MB - Fall 2021
Calders Dock Harbour -
Obashkaandagaang First Nation Water Treatment Project
Obashkaandagaang First Nation -
Replace Existing Distribution Water Main at West End WTP and Upgrade 10 Residential Septic Fields ICIP (57278)
Washagamis Bay First Nation -
Communal Wastewater Collection and Treatment Rehabilitation
Kenora -
Niisaachewan Anishinaabe Nation Gas Station, Convenience Store & Canteen
Niisaachewan Anishinaabe First Nation -
Niisaachewan Anishinaabe Nation - Micro Subdivision Development Project
Niisaachewan Anishinaabe Nation -
Escarpment Trailhead Sign Replacement and New vault Privy
Riding Mountain National Park -
Waywayseecappo First Nation Elton Property Gas Bar
Waywayseecappo First Nation -
Contaminated Soil Remediation
Martheson Bay Road, Kenora Indian Reserve No. 38b, Kenora, Ontario -
Development of 20 Residential Housing Lots on Anishinabe of Wauzhushk Onigum Nation
Anishinabe of Wauzhushk Onigum -
Anishinabe of Wauzhushk Onigum - Golden Eagle Centre Retrofitting Project
Anishinabe of Wauzhushk Onigum -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake Manitoba Outlet Channel outlet on Lake St. Martin -
Construction of Land-Based and Cultural Learning Centre on Wauzhushk Onigum Nation
Wauzhushk Onigum Nation -
New Fibre Installation
Project site 08 (Kenora No. 38B)