Naawi Oodena Urban Reserve – Block D Phase 1-2
The Naawi Oodena Urban Reserve Project involves the construction of enabling infrastructure to support the development of Block D, Phase 1-2, which will include a multi-unit residential building (with 65% of housing dedicated for occupancy of Indigenous people), mixed-used office and commercial spaces (strip mall, grocery store, restaurants), green spaces and recreational facilities. The Project forms part of T1N's broader strategy to lead development outcomes, generate predictable own-source revenues, and create long-term infrastructure that supports housing, employment, commercial development and community building.
Latest update
This determination was based on a consideration of the following factors:
- relevant potential environmental effects;
- comments received from the public; and
- The implementation of technically and economically feasible mitigation measures.
Mitigation and monitoring measures taken into account for this determination included active and adaptive management measures that would be implemented for the protection of the local environment. Based on the consideration of these measures, the Canada Infrastructure Bank is satisfied that the carrying out of the project is not likely to cause significant adverse environmental effects.
Therefore, the Canada Infrastructure Bank may carry out the project, exercise any power, perform any duty or function, or provide financial assistance to enable the project to be carried out in whole or in part.
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 2 | Notice of Determination | - | October 26, 2026 |
| 1 | Notice of Intent to make a determination | - | September 22, 2026 |
Contacts
Canada Infrastructure BankFrédéric Duguay, General Counsel & Corporate Secretary
150 King St W, Suite 2309
Toronto ON M5H 1J9
Telephone: 416-847-7714 or 1-833-551-5245
Email: fduguay@cib-bic.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Block D, Phase 1-2 Naawi Oodena Urban Reserve, Treaty One Territory, Winnipeg, Manitoba (Manitoba)
-
Nature of activity
- Other, not otherwise specified
-
Assessment status
In progress -
Start date
2026-09-22 -
Proponent
Treaty One Nation -
Authorities
- Canada Infrastructure Bank
-
Assessment type
Project on federal lands -
Reference number
90793
Nearby assessments
...within 200 kilometres-
City of Winnipeg Insect Control Branch and Heliport Relocation Project
City of Winnipeg -
Freshwater Institute Underground Chilled Water Piping Replacement
Freshwater Institute in Winnipeg, MB -
Naawi Oodena - Subdivision - Parcel A - 2324
Naawi Oodena -
Temporary Dock - The Forks National Historic Site, Red River, MB
The Forks National Historic Site, Winnipeg -
Roseau River AFN Riverbank Stabilization Project
Roseau River AFN Riverbank Stabilization Project -
Hangar Line Road Extension - 17 Wing Winnipeg
17 Wing Winnipeg -
Perimeter Aviation LP Parking Lot
Winnipeg Richardson International Airport -
New (Multiple) Tower Construction & New Fibre Installation
Mosakahiken Cree Nation (Moose Lake), Northern Manitoba -
New electrical service to existing building at 80 Hangar Line Road
Winnipeg Richardson International Airport (YWG) -
Perimeter Aviation Terminal Building Expansion
Winnipeg Richardson International Airport -
Keewatin Air T-216 Hanger - Medevac Facility Addition
Winnipeg Richardson International Airport -
Energy East Project
Winnipeg -
Perimeter Aviation T-5 Hangar Door Replacement
Winnipeg Richardson International Airport -
Roseau River Anishinaabe First Nation Waste Transfer Station
Roseau River Anishinaabe First Nation -
2026 Airfield Improvements Project
Winnipeg Richardson International Airport -
Pond and Landscape Upgrade at the Winnipeg Tax Centre
Winnipeg -
East Side Air Cargo Development at Winnipeg Richardson International Airport (YWG)
Winnipeg Richardson International Airport -
2023 YWG Airfield Improvements Project
Winnipeg Richardson International Airport -
T-201 Standard Aero Plant 6 Building Expansion
Winnipeg Richardson International Airport -
17 Wing Winnipeg - V6600 Disposal of 13 RHUs and 18 Garages (South Site)
17 Wing Winnipeg -
YWG Groundside Roadway Infrastructure Upgrade Project
Winnipeg Richardson International Airport -
Upgrade of 17 Wing Vehicle Fuel Farm - 17 Wing Winnipeg
17 Wing Winnipeg -
Electric Bus Charging Station Removal and Demolition
Winnipeg Richardson International Airport -
T-149 & T-150 Air Canada Hangar, Petroleum Storage System Upgrades
Winnipeg Richardson International Airport -
Air Canada Hangar T-149 water supply refurbishment project
Winnipeg Richardson International Airport -
Runway 18-36 Rehabilitation at YWG
Winnipeg Richardson International Airport -
T-283 SkyNorth Air Apron Pavement Expansion project
Winnipeg Richardson International Airport -
T-145 STARS Hangar Addition
Winnipeg Richardson International Airport -
Taxiway G Aircraft Maintenance Hangar
Winnipeg Richardson International Airport -
Generator Replacement and Fire Panel Upgrade at existing Hangar building
Winnipeg Richardson International Airport (YWG) -
Avis overflow storage compound Sherwin Road - Decommissioning
Winnipeg Richardson International Airport -
Winnipeg Airport West Lands Moray Street Extension and Site Servicing
Winnipeg Richardson International Airport -
Airport West Perimeter Road and Primary Security Line Relocation
Winnipeg Richardson International Airport -
T-91 VORTAC Site Decommissioning
Winnipeg Richardson International Airport -
Manitoba-Minnesota Transmission Project
Riel Converter Station, near Dorsey, Manitoba -
Vivian Sand Project
Springfield -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Gretna -
St. Andrews Lock and Dam Bridge Deck Replacement
St. Andrews Lock and Dam -
St. Andrews Lock & Dam Quay Wall Rehabilitation Project
St. Andrews Lock & Dam -
Lower Fort Gary Wastewater Treatment Plant Outflow Pipe Replacement
Lower Fort Garry National Historic Site -
Selkirk CCG Asphalt paving
Selkirk Coast Guard Base -
Morden Pesticide and Chemical Building Project
Morden -
Stanley Trail Association Community Pathway Project
Morden -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Morden -
Winkler Port of Entry Redevelopment
Winkler Port of Entry -
Rockwood National Wildlife Area Water Control Structure Re-naturalization Project
Rockwood National Wildlife Area -
Brokenhead Ojibway Nation – New Multi-use Pathways for Active Transportation
Netley -
Brokenhead Ojibway Nation - Cultural Healing Lodge Development
Brokenhead Ojibway Nation -
Brokenhead Ojibway Nation Land Base Building
Brokenhead Ojibway Nation - Reserve No. 4 -
Dakota Tipi First Nation - New Jordan's Principle Facility
Dakota Tipi First Nation -
Xplornet Communications Inc. - XCS - Antenna Structure - Piney Port Border Crossing, Hwy 89, Piney Port, MB
Piney Port Border Crossing -
Brokenhead Ojibway Nation Elders Lodge Project
Brokenhead Ojibway Nation -
Brokenhead Ojibway Nation - Elder's Lodge - 2324
Brokenhead Ojibway Nation - Elder's Lodge - 2324 -
Multi-use Arbour & Powwow Grounds on Brokenhead Reserve
Scanterbury on the Brokenhead Reserve -
Brokenhead - CHRT41 - Jordan's Principle Building/Centre for BON - 2324
Brokenhead Jordan's Principle Centre -
Long Plain FN - Directional Drilling - Water and Sewer Pipeline
Long Plain First Nation -
Long Plain First Nation - Water Treatment Plant Upgrades
Long Plain First Nation -
Long Plain School Renovation & Addition
Long Plain First Nation -
Long Plain - CHRT41 - Prevention Centre - P055810 - 2324
Long Plain First Nation -
In Situ Decommissioning of the Whiteshell Reactor #1
Pinawa -
Dakota Women's Lodge (Winyan Tipi)
Portage la Prairie -
Vehicle and Equipment Management Agency Radiocommunication Antenna Addition in Manitou, MB
Manitou -
South Junction Port of Entry Redevelopment
South Junction Port of Entry -
Launch Ramp Replacement, Balsam Bay, Manitoba
Balsam Bay, Manitoba -
Gimli Harbour Launch Ramp Reconstruction - Gimli, MB - Winter 2021/22
Gimli Harbour, Gimli, MB -
Twinning of the Trans-Canada Highway in Manitoba
Whiteshell Provincial Park -
Swan Lake First Nation Youth & Prevention Centre
Swan Lake First Nation -
Swan Lake First Nation (SLFN) Former Railway Right of Way (ROW) Remediation/Risk Management Project (CSV63)
Swan Lake First Nation (SLFN) Former Railway Right of Way (ROW) Remediation/Risk Management Project (CSV63) -
Sagkeeng (Fort Alexander) Assisted Living Complex
Sagkeeng First Nation -
Fort Alexander First Nation, Sagkeeng, Shoreline Stabilization Phase III, Part B
Fort Alexander First Nation, Sagkeeng -
Sagkeeng First Nation - Shoreline Stabilization - Segment 4
Sagkeeng First Nation -
Traverse Bay Shoreline Stabilization - Site A (North Shoreline)
Traverse Bay North Shoreline - Fort Alexander Reserve -
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection -
Victoria Beach Harbour Manitoba - Routine Maintenance Dredging of Lake Winnipeg at Victoria Beach - Winter 2019
Victoria Beach Harbour -
Victoria Beach Hydrometric Stilling Well Removal - Winter 2024
Victoria Beach Harbour -
Sprague Port of Entry Redevelopment
Sprague Port of Entry -
Subsurface Septic System Rehabilitation
Ontario -
Shoal Lake 40 First Nation Wastewater Treatment System
Shoal Lake 40 First Nation -
Shoal Lake 40 New K-8 School
Shoal Lake 40 -
Twinning of the Trans-Canada Highway in Manitoba
Whiteshell Provincial Park -
Trans-Canada Highway Twinning Project
Highway 17 at Manitoba/Ontario border -
Arnes Harbour Manitoba - Routine Maintenance Dredging of the Drunken River at Lake Winnipeg - Winter 2019
Arnes Harbour -
Potential Regional Assessment of the Trans-Canada Highway Improvement Project
Kenora -
Potential Regional Assessment of the Trans-Canada Highway Improvement Project
Whiteshell Provincial Park -
New Fibre Installation
Project site 24 (Shoal Lake No.39) -
Women's Lodge & Cultural Safe Space
Kejick -
Addition to Buffalo Point First Nation Radiocommunication Tower at Buffalo Point, MB.
Buffalo Point, MB -
Iskatewizaagegan #39 Independent First Nation - Micro Subdivision Development
Iskatewizaagegan #39 Independent First Nation -
Northwest Angle 33 First Nation Water Treatment Project - Angle Inlet
Northwest Angle #33 FN -
Hnausa Harbour Manitoba - Harbour Dredging of Lake Winnipeg at Hnausa - Winter 2020-21
Hnausa Harbour -
Hnausa Harbour, Manitoba - FFMC Barge Loading Ramp Construction - Winter 2021
Hnausa Harbour -
Hnausa – Wharf Replacement Project
Hnausa -
Black River First Nation - Transitional Housing
Black River First Nation -
Black River First Nation Watermain Renewal Project
Black River First Nation -
Black River First Nation Subdivision Road
Black River First Nation -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Black River First Nation Reserve No. 260
Black River First Nation Reserve No. 260 -
Black River First Nation Prevention Centre
Black River First Nation -
New Fibre Installation
Black River First Nation no. 9 -
Black River Waste Transfer Station
Black River Reserve -
New Fibre Installation - Sandy Bay
Project site: Sandy Bay -
Sandy Bay First Nation New Water Treatment Plant
Sandy Bay First Nation -
Sandy Bay First Nation CFS Prevention Center Temporary Facilities (10 RTMs)
Sandy Bay First Nation -
New Fibre Installation - RFNOW
Project site 1: CA12:CARBS-SLFN-23 -
Windigo Island Dock Replacement Project
Animakee Wa Zhing #37 -
Upgrade of the Windigo Island Docking Infrastructure Accessibility
Windigo Islands -
Windigo Island Water Treatment Project
Animakee Wa Zhing First Nation - Windigo Island -
Launch Ramp Reconstruction - Riverton, Manitoba
Riverton, Manitoba -
New Fibre Installation
Project site 11 (Wabaseemoong Independent Nations) -
Cartwright Port of Entry Redevelopment
Cartwright Port of Entry -
Xplornet Communications Inc. Telecommunication Tower at Canada Border Services Agency - Cartwright Port of Entry, MB
Cartwright, MB -
Trans-Canada Highway Twinning Project
Kenora -
Lake Manitoba - South Access Road Upgrades - 2324
Lake Manitoba -
Area A Security Fence - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Railway Crossings Upgrade - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Royal Avenue Reconstruction - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Building Construction - Canadian Forces Base Shilo
Canadian Forces Base - Shilo -
Aldershot Road Reconstruction - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Larkhill Avenue Reconstruction - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Reconstruction of Rifle Range 2 - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Construction of Land Vehicle Crew Training System Building - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Construction of an Outdoor Rink – Canadian Forces Base Shilo
CFB Shilo -
Ortona Road Fireguard Expansion - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
N132 Petroleum, Oils and Lubricants (POL) Revitalization - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Float Replacement, Hecla, Manitoba
Hecla, Manitoba -
Obashkaandagaang First Nation Water Treatment Project
Obashkaandagaang First Nation -
Base Refueling Point Tank Replacement
CFB/ASU Shilo -
Construction of New Supply Well- Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Construction of Land Vehicle Crew Training System Building
Canadian Forces Base/Area Support Unit Shilo -
Construct Transition Centre - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Installation of Running Trail - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Housing Renovations (HAYSL80) - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Replace Existing Distribution Water Main at West End WTP and Upgrade 10 Residential Septic Fields ICIP (57278)
Washagamis Bay First Nation -
New Fibre Installation
Project site: Various parts of Manitoba -
Lake Manitoba First Nation - CHRT41 FNCFS Prevention Centre
Lake Manitoba First Nation -
Demolition of Unnamed Building at Waggle Springs - Canadian Forces Base Shilo
Waggle Springs -
New Broadband Communications North Inc. Telecommunication Tower at Lake Manitoba First Nation on Dog Creek Reserve No. 46
Lake Manitoba First Nation, MB -
Gull Harbour Lighthouse Rebuild
Gull Harbour -
Launch Ramp Reconstruction - Gull Harbour, MB - Fall 2021
Gull Harbour -
Niisaachewan Anishinaabe Nation Gas Station, Convenience Store & Canteen
Niisaachewan Anishinaabe First Nation -
Niisaachewan Anishinaabe Nation - Micro Subdivision Development Project
Niisaachewan Anishinaabe Nation -
Communal Wastewater Collection and Treatment Rehabilitation
Kenora -
Development of 20 Residential Housing Lots on Anishinabe of Wauzhushk Onigum Nation
Anishinabe of Wauzhushk Onigum -
Anishinabe of Wauzhushk Onigum - Golden Eagle Centre Retrofitting Project
Anishinabe of Wauzhushk Onigum -
Construction of Land-Based and Cultural Learning Centre on Wauzhushk Onigum Nation
Wauzhushk Onigum Nation -
Contaminated Soil Remediation
Martheson Bay Road, Kenora Indian Reserve No. 38b, Kenora, Ontario -
Lena Port of Entry Redevelopment
Lena Port of Entry -
New Fibre Installation
Project site 08 (Kenora No. 38B) -
Hollow Water First Nation Transitional Spaces
Hollow Water First Nation -
Hollow Water First Nation Prevention Centre
Hollow Water First Nation -
Hollow Water - CHRT 41 - Staff Accommodations - 2324
Hollow Water - CHRT 41 - Staff Accommodations - 2324 -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 4: Hollow Water No. 10 -
New Fibre Installation
Hollow Water First Nation no.10 -
Wauzhushk Onigum Multi-Purpose Centre
Wauzhushk Onigum Multi-Purpose Centre -
Hollow Water Wharf Construction
Hollow Water -
Wharf Reconstruction - Little Grindstone, MB - Winter/Spring 2020
Little Grindstone Harbour