Naawi Oodena - Subdivision - Parcel A - 2324

The following items will be included within the scope of this project:

1. Service Road - Installation of a service road north and west of the gas bar footprint for future development.

2. Water - Water service will be connect to existing City of Winnipeg waterline

3. Wastewater - Wastewater sewer connection to existing City of Winnipeg combined sewer; Manholes.

4. Land Drainage Sewer - Land drainage sewer connection to existing Taylor Avenue drainage sewer; catch basins; curb inlets.

5. Surface Works - Includes stripping soil organics, excavation, asphalt, concrete curbs and gutters, concrete approaches.

More


Latest update

November 3, 2023 - Indigenous Services Canada issued its Notice of Determination and determined that the project is not likely to cause significant adverse environmental effects.

Participate

Contacts

Indigenous Services Canada
Tebesi Mosala, Senior Environmental Specialist
200-365 Hargrave Street
Winnipeg, Manitoba R3B 3A3
Telephone: 204-298-2329
Email: tebesi.mosala@sac-isc.gc.ca


  • Location

    • Naawi Oodena (Manitoba)
  • Nature of Activity

    • Building and Property Development
    • Highways and Roads
  • Assessment Status

    Completed
  • Start Date

    2023-10-04
  • Proponent

    Naawi Oodena
  • Authorities

    • Indigenous Services Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    85974