Gull Harbour Lighthouse Rebuild
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The Canadian Coast Guard is proposing to complete a full rebuild of the Gull Harbour Lighthouse located on Federal Land bordered by Hecla-Grindstone Provincial Park near Arborg Manitoba. the property has two light house buildings located on it: a wooden lighthouse originally built in 1898, and a steel framed tower with a lighthouse building on top built in 1924. This project will be focused on the latter, 27-meter-high steel tower and lighthouse.
This Lighthouse is heritage lighthouse protected under the Heritage Lighthouse Protection Act (HLPA) and is subject to certain restrictions regarding the methods of rebuilding. Due to decades of neglect, the tower and lighthouse structure is past the point of repair and has been deemed too dangerous to remain. Through conversations with the Federal Heritage Buildings Review Office and a public comment period associated with the heritage values of the structure, it has been determined that rebuilding the structure with exact proportions and aesthetics is the most appropriate approach to the rebuild.
there may be some vegetation brushing at the base of the tower in order to remove and rebuild the structure. Access to the site will be conducted via a 1-kilometer-long dirt path/road.
Latest update
Participate
Contacts
Steven ColeMarine Civil Infrastructure
Steven Cole, Project Engineer
Victoria Coast Guard Base 25 Huron Street
Victoria, British Columbia V8V 4V9
Telephone: 250-413-2835
Email: steven.cole@dfo-mpo.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Gull Harbour (Manitoba)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
In progress -
Start Date
2025-09-01 -
Proponent
Department of Fisheries and Oceans - Canadian Coast Guard -
Authorities
- Fisheries and Oceans Canada
-
Assessment Type
Project on federal lands -
Reference Number
89500
Nearby assessments
...within 200 kilometres-
Launch Ramp Reconstruction - Gull Harbour, MB - Fall 2021
Gull Harbour -
Float Replacement, Hecla, Manitoba
Hecla, Manitoba -
Wharf Reconstruction - Little Grindstone, MB - Winter/Spring 2020
Little Grindstone Harbour -
Hollow Water Wharf Construction
Hollow Water -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 4: Hollow Water No. 10 -
New Fibre Installation
Hollow Water First Nation no.10 -
Hollow Water - CHRT 41 - Staff Accommodations - 2324
Hollow Water - CHRT 41 - Staff Accommodations - 2324 -
Hollow Water First Nation Prevention Centre
Hollow Water First Nation -
Hollow Water First Nation Transitional Spaces
Hollow Water First Nation -
Launch Ramp Reconstruction - Riverton, Manitoba
Riverton, Manitoba -
Hnausa – Wharf Replacement Project
Hnausa -
Hnausa Harbour, Manitoba - FFMC Barge Loading Ramp Construction - Winter 2021
Hnausa Harbour -
Hnausa Harbour Manitoba - Harbour Dredging of Lake Winnipeg at Hnausa - Winter 2020-21
Hnausa Harbour -
Sugar Creek Peat Harvesting Project
Fisher River Cree Nation -
Launch Ramp Reconstruction - Calders Dock, MB - Fall 2021
Calders Dock Harbour -
Black River First Nation Watermain Renewal Project
Black River First Nation -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Black River First Nation Reserve No. 260
Black River First Nation Reserve No. 260 -
New Fibre Installation
Black River First Nation no. 9 -
Black River First Nation Prevention Centre
Black River First Nation -
Black River Waste Transfer Station
Black River Reserve -
Black River First Nation - Transitional Housing
Black River First Nation -
Arnes Harbour Manitoba - Routine Maintenance Dredging of the Drunken River at Lake Winnipeg - Winter 2019
Arnes Harbour -
Victoria Beach Hydrometric Stilling Well Removal - Winter 2024
Victoria Beach Harbour -
Victoria Beach Harbour Manitoba - Routine Maintenance Dredging of Lake Winnipeg at Victoria Beach - Winter 2019
Victoria Beach Harbour -
Fisher River Used Oil Burner Installation
Fisher River Cree Nation -
Fisher River Cree Nation East Road Replacement Project
Fisher River Cree Nation Reserve no. 44 -
Fisher River Cree Nation Jordan Principle Building
Fisher River Cree Nation -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 3: BCN-BLD-TW3 -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 2: BCN-BLD-TW2 -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation School
Bloodvein School -
Hydrometric Station Decommissioning - Fisher River, Manitoba
Fisher River, Manitoba -
Sagkeeng First Nation - Shoreline Stabilization - Segment 4
Sagkeeng First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein River Airport Wildlife Fencing
Bloodvein River -
Traverse Bay Shoreline Stabilization - Site A (North Shoreline)
Traverse Bay North Shoreline - Fort Alexander Reserve -
Bloodvein First Nation Staff Housing
Bloodvein First Nation -
Bloodvein First Nation CFS Prevention Building
Bloodvein First Nation -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Peguis First Nation Reserve No. 269
Peguis First Nation Reserve No. 269 -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 1: BCN-BLD-TW1 -
New (Multiple) and Upgrades (Multiple) Radiocommunications Towers
Bloodvein -
Bell MTS Radiocommunication Tower on Bloodvein Reserve No. 12
Bloodvein Reserve No. 12 -
Peguis First Nation Recreation Centre Soil Remediation
Peguis First Nation Recreation Centre Soil Remediation -
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection -
Sagkeeng (Fort Alexander) Assisted Living Complex
Sagkeeng First Nation -
Gimli Harbour Launch Ramp Reconstruction - Gimli, MB - Winter 2021/22
Gimli Harbour, Gimli, MB -
New Peguis First Nation Radiocommunication Tower in Peguis, MB
Peguis, MB -
Launch Ramp Replacement, Balsam Bay, Manitoba
Balsam Bay, Manitoba -
Brokenhead - CHRT41 - Jordan's Principle Building/Centre for BON - 2324
Brokenhead Jordan's Principle Centre -
Multi-use Arbour & Powwow Grounds on Brokenhead Reserve
Scanterbury on the Brokenhead Reserve -
Brokenhead Ojibway Nation - Elder's Lodge - 2324
Brokenhead Ojibway Nation - Elder's Lodge - 2324 -
Brokenhead Ojibway Nation Elders Lodge Project
Brokenhead Ojibway Nation -
ENV - 268 - EA - ERP - Kinonjeoshtegon - CHRT 41 - JP New Building and Renovation - P057361 - 2425
Kinonjeoshtegon First Nation -
Brokenhead Ojibway Nation Land Base Building
Brokenhead Ojibway Nation - Reserve No. 4 -
Brokenhead Ojibway Nation - Cultural Healing Lodge Development
Brokenhead Ojibway Nation -
Rockwood National Wildlife Area Water Control Structure Re-naturalization Project
Rockwood National Wildlife Area -
Berens River 13 Rapid Housing Fourplexes
Berens River 13 -
Selkirk CCG Asphalt paving
Selkirk Coast Guard Base -
In Situ Decommissioning of the Whiteshell Reactor #1
Pinawa -
Chief Elsie Bouchie Culture Camp
Pigeon River 13A -
Little Grand Rapids Dock & Dock Foundation Posts
Little Grand Rapids -
Little Grand Rapids RCMP New Living Quarters
Little Grand Rapids -
Southeast CFS Little Grand Rapids Staff Housing (Personnel and Visiting Professionals) and Prevention Centre
Little Grand Rapids First Nation -
McBeth Point Harbour Improvements
McBeth Point Harbour -
Little Grand Rapids First Nation School
Little Grand Rapids First Nation School -
Lower Fort Gary Wastewater Treatment Plant Outflow Pipe Replacement
Lower Fort Garry National Historic Site -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake St. Martin Outlet Channel outlet on Lake Winnipeg -
Little Grand Rapids First Nation Transitional Housing (Temporary Housing)
Little Grand Rapids First Nation -
Aboveground Fuel Storage Replacement in Little Grand Rapids, Manitoba
Little Grand Rapids -
Little Grand Rapids Submarine Cable Installation Project
Little Grand Rapids -
St. Andrews Lock and Dam Bridge Deck Replacement
St. Andrews Lock and Dam -
Project 4 - All-Season Road Connecting Berens River to Poplar River First Nation
East side of Lake Winnipeg, between Poplar and Berens Rivers -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake St. Martin Outlet Channel inlet on Lake St. Martin -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 5: BCN-BRR-TW2 -
Berens River Bridge Replacement
Berens River First Nation -
Berens River First Nation Road Upgrades
Berens River -
Berens River Water Treatment Plant Upgrade
Berens River First Nation -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 3: Berens River 13 -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 4: BCN-BRR-TW1 -
Dauphin River Harbour Manitoba - Routine Maintenance Dredging of the Dauphin River at Lake Winnipeg - Winter 2019
Dauphin River Harbour -
Dauphin River Small Craft Harbour Dredging and Pile Installation
Dauphin River Small Craft Harbour -
Harbour Improvements - Berens River - Sigurdsson Island, MB
Berens River -
Berens River Harbour Launch Ramp Reconstruction
Berens River Small Craft Harbours -
New Fibre Installation - Dauphin River
Project site 1: Anama Bay -
Berens River Small Craft Harbour Breakwater Repairs and Pile Installation
Berens River - Sigurdsson Island Small Craft Harbour -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 6: BCN-BRR-TW3 -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake Manitoba Outlet Channel outlet on Lake St. Martin -
Lake Manitoba - South Access Road Upgrades - 2324
Lake Manitoba -
Pauingassi First Nation Child and Family Services Prevention Building and Staff Housing
Pauingassi First Nation -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake Manitoba Outlet Channel inlet in Lake Manitoba -
Lake St. Martin - Water Treatment Plant Zebra Mussels Control
Lake St. Martin -
Lake Manitoba First Nation - CHRT41 FNCFS Prevention Centre
Lake Manitoba First Nation -
New Fibre Installation
Project site: Various parts of Manitoba -
New Broadband Communications North Inc. Telecommunication Tower at Lake Manitoba First Nation on Dog Creek Reserve No. 46
Lake Manitoba First Nation, MB -
Manitoba-Minnesota Transmission Project
Riel Converter Station, near Dorsey, Manitoba -
Vivian Sand Project
Springfield -
Pond and Landscape Upgrade at the Winnipeg Tax Centre
Winnipeg -
New Fibre Installation - Dauphin River
Project site 2: Obushkudayang Indian Reserve -
T-91 VORTAC Site Decommissioning
Winnipeg Richardson International Airport -
Energy East Project
Winnipeg -
Avis overflow storage compound Sherwin Road - Decommissioning
Winnipeg Richardson International Airport -
New (Multiple) Tower Construction & New Fibre Installation
Mosakahiken Cree Nation (Moose Lake), Northern Manitoba -
Temporary Dock - The Forks National Historic Site, Red River, MB
The Forks National Historic Site, Winnipeg -
Electric Bus Charging Station Removal and Demolition
Winnipeg Richardson International Airport -
Airport West Perimeter Road and Primary Security Line Relocation
Winnipeg Richardson International Airport -
Runway 18-36 Rehabilitation at YWG
Winnipeg Richardson International Airport -
T-201 Standard Aero Plant 6 Building Expansion
Winnipeg Richardson International Airport -
YWG Groundside Roadway Infrastructure Upgrade Project
Winnipeg Richardson International Airport -
Winnipeg Airport West Lands Moray Street Extension and Site Servicing
Winnipeg Richardson International Airport -
Generator Replacement and Fire Panel Upgrade at existing Hangar building
Winnipeg Richardson International Airport (YWG) -
T-283 SkyNorth Air Apron Pavement Expansion project
Winnipeg Richardson International Airport -
T-145 STARS Hangar Addition
Winnipeg Richardson International Airport -
East Side Air Cargo Development at Winnipeg Richardson International Airport (YWG)
Winnipeg Richardson International Airport -
Little Saskatchewan First Nation - Mino-Aya-Win Centre
Little Saskatchewan First Nation -
2023 YWG Airfield Improvements Project
Winnipeg Richardson International Airport -
T-149 & T-150 Air Canada Hangar, Petroleum Storage System Upgrades
Winnipeg Richardson International Airport -
Air Canada Hangar T-149 water supply refurbishment project
Winnipeg Richardson International Airport -
Perimeter Aviation T-5 Hangar Door Replacement
Winnipeg Richardson International Airport -
Perimeter Aviation Terminal Building Expansion
Winnipeg Richardson International Airport -
Upgrade of 17 Wing Vehicle Fuel Farm - 17 Wing Winnipeg
17 Wing Winnipeg -
Keewatin Air T-216 Hanger - Medevac Facility Addition
Winnipeg Richardson International Airport -
Perimeter Aviation LP Parking Lot
Winnipeg Richardson International Airport -
17 Wing Winnipeg - V6600 Disposal of 13 RHUs and 18 Garages (South Site)
17 Wing Winnipeg -
New electrical service to existing building at 80 Hangar Line Road
Winnipeg Richardson International Airport (YWG) -
Hangar Line Road Extension - 17 Wing Winnipeg
17 Wing Winnipeg -
Pinaymootang First Nation Water Treatment Upgrades
Pinaymootang First Nation -
Naawi Oodena - Subdivision - Parcel A - 2324
Naawi Oodena -
Freshwater Institute Underground Chilled Water Piping Replacement
Freshwater Institute in Winnipeg, MB -
City of Winnipeg Insect Control Branch and Heliport Relocation Project
City of Winnipeg -
Sandy Bay First Nation New Water Treatment Plant
Sandy Bay First Nation -
New Fibre Installation - Sandy Bay
Project site: Sandy Bay -
Sandy Bay First Nation CFS Prevention Center Temporary Facilities (10 RTMs)
Sandy Bay First Nation -
New Fibre Installation
Project site 11 (Wabaseemoong Independent Nations) -
Ebb and Flow First Nation - Road and Drainage Upgrades
Ebb and Flow First Nation -
Xplornet Inc. Radiocommunication Antenna Addition on Ebb and Flow First Nation Reserve No. 280
Ebb and Flow First Nation Reserve No. 280 -
CSC97 - Ebb and Flow First Nation Water Supply Line Project
Ebb and Flow First Nation -
Dakota Tipi First Nation - New Jordan's Principle Facility
Dakota Tipi First Nation -
New Fibre Installation / Upgrade Multiple Towers
Kewaywin PoP -
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades -
Trans-Canada Highway Twinning Project
Highway 17 at Manitoba/Ontario border -
New Fibre Installation / Upgrade Multiple Towers
Wunnumin Lake PoP -
New Fibre Installation / Upgrade Multiple Towers
Kasabonika Lake PoP -
Wharf Demolition and Reconstruction - George Island, MB - Summer 2020/Winter 2021
George Island Harbour -
Pikangikum Rapid Housing Initiative
Pikangikum First Nation -
Pikangikum First Nation - Nursing Station Fuel Storage Tank System Repairs
Pikangikum First Nation -
Pikangikum Remediation
Pikangikum First Nation -
Pikangikum Cultural Learning and Community Centre
Pikangikum First Nation -
Pikangikum First Nation - 10 Unit Residential Construction Project
Pikangikum First Nation -
Poplar River First Nation Water Treatment Plant
Poplar River First Nation -
Long Plain FN - Directional Drilling - Water and Sewer Pipeline
Long Plain First Nation -
Long Plain - CHRT41 - Prevention Centre - P055810 - 2324
Long Plain First Nation -
Long Plain School Renovation & Addition
Long Plain First Nation