Fort Alexander First Nation, Sagkeeng, Shoreline Stabilization Phase III, Part B
Slope stabilization and installation of an engineered riprap erosion control blanket along approximately 145 m of the Lake Winnipeg shoreline at the mouth of the Winnipeg River (Traverse Bay) in the Sagkeeng First Nation Fort Alexander Reserve. The project is required to arrest severe shoreline erosion and slope failures that have encroached to within 5 m of the pavement of Provincial Trunk Highway 11. Average shoreline loss has been approximately 1.1 m/year since 2012. There are also several residences within 250 m of the site, along the shoreline and highway.
The design is consistent with that of approximately 4 km of works along the Traverse Bay shoreline, within the reserve, that were completed in several contracts between 2010 and 2025. The shoreline in this area is susceptible to rapid erosion and shoreline slumping above the normal high water mark due to erodible soils and extreme wave action over highly variable water levels resulting from seiche events and wind setup during storms. The combination of wave activity and erodible soils causes the banks to be undercut and then slump toward the shoreline.
As the soils at this site are rapidly slumping toward the lake and material has been lost at the toe of the highway embankment, clay fill will be added and compacted to restore a portion of the embankment between the highway and the shoreline. This work will be completed in fall (mid to late October 2026), prior to freezing, to facilitate compaction of fill soils and reduce long-term settlement.
Once the highway embankment is re-established, the remaining shoreline stabilization and erosion protection works will be completed under frozen conditions (December 2026 to March 2027). Key elements of the design include excavating a keyway for scour protection at the base of the eroded bank (elevation 215.7 m, isolated from the water's edge by a beach), regrading the eroded bank to a stable slope, installing non-woven geotextile along the bank and keyway to an elevation of 220.4 m (above the high water / scour elevation), placing a 0.30 m thick bedding layer of 150 mm down granular material, placing 300 to 600 mm diameter riprap (blast rock) above the bedding material to a final grade of 4h:1v, and site restoration works. At elevations above the riprap blanket, over-steepened slopes will be graded where necessary to 4:1 h:v, overlain with erosion control blankets and topsoil, and seeded. Final site restoration works, above the extreme high water mark, will be completed in spring 2027. Access will be from PTH 11. The site will be cleared and grubbed to the extent necessary for equipment to work from the top of the bank, but this clearing will be minimal, as the site has been previously cleared and highly disturbed, currently supporting only grasses, weeds and some small shrubs. No in-water work will be conducted. Some material (e.g. salvaged topsoil) will be stockpiled on or near the site at locations to be approved by the engineer.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 1 | Notice of Intent to Make a Determination – Start of Public Comment Period | - | October 30, 2026 |
Contacts
Indigenous Services CanadaLori Bueckert, Environmental Analyst
365 Hargrave Street
Winnipeg MB R3B 3A3
Telephone: 204-227-3254
Email: lori.bueckert@canada.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Fort Alexander First Nation, Sagkeeng (Manitoba)
-
Nature of activity
- Highways and Roads
- Remediation and conservation
-
Assessment status
In progress -
Start date
2026-10-30 -
Proponent
Fort Alexander First Nation, Sagkeeng -
Authorities
- Indigenous Services Canada
-
Assessment type
Project on federal lands -
Reference number
90862
Nearby assessments
...within 200 kilometres-
Traverse Bay Shoreline Stabilization - Site A (North Shoreline)
Traverse Bay North Shoreline - Fort Alexander Reserve -
Sagkeeng First Nation - Shoreline Stabilization - Segment 4
Sagkeeng First Nation -
Sagkeeng (Fort Alexander) Assisted Living Complex
Sagkeeng First Nation -
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection -
Victoria Beach Harbour Manitoba - Routine Maintenance Dredging of Lake Winnipeg at Victoria Beach - Winter 2019
Victoria Beach Harbour -
Victoria Beach Hydrometric Stilling Well Removal - Winter 2024
Victoria Beach Harbour -
Black River First Nation - Transitional Housing
Black River First Nation -
Black River First Nation Subdivision Road
Black River First Nation -
Black River First Nation Watermain Renewal Project
Black River First Nation -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Black River First Nation Reserve No. 260
Black River First Nation Reserve No. 260 -
Black River First Nation Prevention Centre
Black River First Nation -
New Fibre Installation
Black River First Nation no. 9 -
Black River Waste Transfer Station
Black River Reserve -
Launch Ramp Replacement, Balsam Bay, Manitoba
Balsam Bay, Manitoba -
Brokenhead - CHRT41 - Jordan's Principle Building/Centre for BON - 2324
Brokenhead Jordan's Principle Centre -
Multi-use Arbour & Powwow Grounds on Brokenhead Reserve
Scanterbury on the Brokenhead Reserve -
Brokenhead Ojibway Nation - Elder's Lodge - 2324
Brokenhead Ojibway Nation - Elder's Lodge - 2324 -
Brokenhead Ojibway Nation Elders Lodge Project
Brokenhead Ojibway Nation -
Brokenhead Ojibway Nation Land Base Building
Brokenhead Ojibway Nation - Reserve No. 4 -
Brokenhead Ojibway Nation - Cultural Healing Lodge Development
Brokenhead Ojibway Nation -
Brokenhead Ojibway Nation – New Multi-use Pathways for Active Transportation
Netley -
Gimli Harbour Launch Ramp Reconstruction - Gimli, MB - Winter 2021/22
Gimli Harbour, Gimli, MB -
Arnes Harbour Manitoba - Routine Maintenance Dredging of the Drunken River at Lake Winnipeg - Winter 2019
Arnes Harbour -
In Situ Decommissioning of the Whiteshell Reactor #1
Pinawa -
Hnausa Harbour Manitoba - Harbour Dredging of Lake Winnipeg at Hnausa - Winter 2020-21
Hnausa Harbour -
Hnausa Harbour, Manitoba - FFMC Barge Loading Ramp Construction - Winter 2021
Hnausa Harbour -
Hnausa – Wharf Replacement Project
Hnausa -
Float Replacement, Hecla, Manitoba
Hecla, Manitoba -
Hollow Water First Nation Transitional Spaces
Hollow Water First Nation -
Hollow Water First Nation Prevention Centre
Hollow Water First Nation -
Hollow Water - CHRT 41 - Staff Accommodations - 2324
Hollow Water - CHRT 41 - Staff Accommodations - 2324 -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 4: Hollow Water No. 10 -
New Fibre Installation
Hollow Water First Nation no.10 -
Launch Ramp Reconstruction - Riverton, Manitoba
Riverton, Manitoba -
Hollow Water Wharf Construction
Hollow Water -
Selkirk CCG Asphalt paving
Selkirk Coast Guard Base -
Gull Harbour Lighthouse Rebuild
Gull Harbour -
Launch Ramp Reconstruction - Gull Harbour, MB - Fall 2021
Gull Harbour -
Rockwood National Wildlife Area Water Control Structure Re-naturalization Project
Rockwood National Wildlife Area -
Lower Fort Gary Wastewater Treatment Plant Outflow Pipe Replacement
Lower Fort Garry National Historic Site -
St. Andrews Lock & Dam Quay Wall Rehabilitation Project
St. Andrews Lock & Dam -
St. Andrews Lock and Dam Bridge Deck Replacement
St. Andrews Lock and Dam -
Wharf Reconstruction - Little Grindstone, MB - Winter/Spring 2020
Little Grindstone Harbour -
Vivian Sand Project
Springfield -
Pond and Landscape Upgrade at the Winnipeg Tax Centre
Winnipeg -
Sugar Creek Peat Harvesting Project
Fisher River Cree Nation -
Energy East Project
Winnipeg -
New (Multiple) Tower Construction & New Fibre Installation
Mosakahiken Cree Nation (Moose Lake), Northern Manitoba -
Temporary Dock - The Forks National Historic Site, Red River, MB
The Forks National Historic Site, Winnipeg -
T-91 VORTAC Site Decommissioning
Winnipeg Richardson International Airport -
Avis overflow storage compound Sherwin Road - Decommissioning
Winnipeg Richardson International Airport -
Electric Bus Charging Station Removal and Demolition
Winnipeg Richardson International Airport -
T-201 Standard Aero Plant 6 Building Expansion
Winnipeg Richardson International Airport -
YWG Groundside Roadway Infrastructure Upgrade Project
Winnipeg Richardson International Airport -
Runway 18-36 Rehabilitation at YWG
Winnipeg Richardson International Airport -
East Side Air Cargo Development at Winnipeg Richardson International Airport (YWG)
Winnipeg Richardson International Airport -
Perimeter Aviation T-5 Hangar Door Replacement
Winnipeg Richardson International Airport -
2026 Airfield Improvements Project
Winnipeg Richardson International Airport -
Perimeter Aviation Terminal Building Expansion
Winnipeg Richardson International Airport -
2023 YWG Airfield Improvements Project
Winnipeg Richardson International Airport -
Keewatin Air T-216 Hanger - Medevac Facility Addition
Winnipeg Richardson International Airport -
Perimeter Aviation LP Parking Lot
Winnipeg Richardson International Airport -
Airport West Perimeter Road and Primary Security Line Relocation
Winnipeg Richardson International Airport -
Taxiway G Aircraft Maintenance Hangar
Winnipeg Richardson International Airport -
Winnipeg Airport West Lands Moray Street Extension and Site Servicing
Winnipeg Richardson International Airport -
T-283 SkyNorth Air Apron Pavement Expansion project
Winnipeg Richardson International Airport -
T-145 STARS Hangar Addition
Winnipeg Richardson International Airport -
Generator Replacement and Fire Panel Upgrade at existing Hangar building
Winnipeg Richardson International Airport (YWG) -
New electrical service to existing building at 80 Hangar Line Road
Winnipeg Richardson International Airport (YWG) -
Upgrade of 17 Wing Vehicle Fuel Farm - 17 Wing Winnipeg
17 Wing Winnipeg -
T-149 & T-150 Air Canada Hangar, Petroleum Storage System Upgrades
Winnipeg Richardson International Airport -
Air Canada Hangar T-149 water supply refurbishment project
Winnipeg Richardson International Airport -
17 Wing Winnipeg - V6600 Disposal of 13 RHUs and 18 Garages (South Site)
17 Wing Winnipeg -
Hangar Line Road Extension - 17 Wing Winnipeg
17 Wing Winnipeg -
Manitoba-Minnesota Transmission Project
Riel Converter Station, near Dorsey, Manitoba -
Naawi Oodena - Subdivision - Parcel A - 2324
Naawi Oodena -
Freshwater Institute Underground Chilled Water Piping Replacement
Freshwater Institute in Winnipeg, MB -
City of Winnipeg Insect Control Branch and Heliport Relocation Project
City of Winnipeg -
Launch Ramp Reconstruction - Calders Dock, MB - Fall 2021
Calders Dock Harbour -
New Fibre Installation
Project site 11 (Wabaseemoong Independent Nations) -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Peguis First Nation Reserve No. 269
Peguis First Nation Reserve No. 269 -
Fisher River Used Oil Burner Installation
Fisher River Cree Nation -
Peguis First Nation - Recovery Housing 30 Homes & 6-Plex
Peguis First Nation -
Peguis First Nation Interim Flood Protection Project
Peguis First Nation -
Peguis First Nation Interim Flood Protection Project
Peguis First Nation -
Peguis First Nation Recreation Centre Soil Remediation
Peguis First Nation Recreation Centre Soil Remediation -
Fisher River Cree Nation East Road Replacement Project
Fisher River Cree Nation Reserve no. 44 -
New Peguis First Nation Radiocommunication Tower in Peguis, MB
Peguis, MB -
Hydrometric Station Decommissioning - Fisher River, Manitoba
Fisher River, Manitoba -
Fisher River Cree Nation (FRCN) On-Reserve Permanent Diking
Fisher River First Nation -
Fisher River Cree Nation Jordan Principle Building
Fisher River Cree Nation -
Launch Ramp Replacement, Pine Dock, Manitoba
Pine Dock -
Goldeye Lake Drive Subdivision
Fisher River Cree Nation -
Peguis First Nation Interim Flood Protection Project
Peguis First Nation -
Potential Regional Assessment of the Trans-Canada Highway Improvement Project
Kenora -
Potential Regional Assessment of the Trans-Canada Highway Improvement Project
Whiteshell Provincial Park -
Twinning of the Trans-Canada Highway in Manitoba
Whiteshell Provincial Park -
Twinning of the Trans-Canada Highway in Manitoba
Whiteshell Provincial Park -
Trans-Canada Highway Twinning Project
Highway 17 at Manitoba/Ontario border -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 3: BCN-BLD-TW3 -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 2: BCN-BLD-TW2 -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation School
Bloodvein School -
Launch Ramp Replacement, Matheson Island, Manitoba
Matheson Island -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein River Airport Wildlife Fencing
Bloodvein River -
Bloodvein First Nation CFS Prevention Building
Bloodvein First Nation -
Bloodvein First Nation Staff Housing
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 1: BCN-BLD-TW1 -
New (Multiple) and Upgrades (Multiple) Radiocommunications Towers
Bloodvein -
Bell MTS Radiocommunication Tower on Bloodvein Reserve No. 12
Bloodvein Reserve No. 12 -
Naawi Oodena Urban Reserve – Block D Phase 1-2
Block D, Phase 1-2 Naawi Oodena Urban Reserve, Treaty One Territory, Winnipeg, Manitoba -
Subsurface Septic System Rehabilitation
Ontario -
Shoal Lake 40 New K-8 School
Shoal Lake 40 -
Iskatewizaagegan #39 Independent First Nation - Micro Subdivision Development
Iskatewizaagegan #39 Independent First Nation -
Shoal Lake 40 First Nation Wastewater Treatment System
Shoal Lake 40 First Nation -
Women's Lodge & Cultural Safe Space
Kejick -
New Fibre Installation
Project site 24 (Shoal Lake No.39) -
Communal Wastewater Collection and Treatment Rehabilitation
Kenora -
Niisaachewan Anishinaabe Nation Gas Station, Convenience Store & Canteen
Niisaachewan Anishinaabe First Nation -
Niisaachewan Anishinaabe Nation - Micro Subdivision Development Project
Niisaachewan Anishinaabe Nation -
Trans-Canada Highway Twinning Project
Kenora -
Lake Manitoba - South Access Road Upgrades - 2324
Lake Manitoba -
Obashkaandagaang First Nation Water Treatment Project
Obashkaandagaang First Nation -
Replace Existing Distribution Water Main at West End WTP and Upgrade 10 Residential Septic Fields ICIP (57278)
Washagamis Bay First Nation -
ENV - 268 - EA - ERP - Kinonjeoshtegon - CHRT 41 - JP New Building and Renovation - P057361 - 2425
Kinonjeoshtegon First Nation -
Contaminated Soil Remediation
Martheson Bay Road, Kenora Indian Reserve No. 38b, Kenora, Ontario -
Dakota Tipi First Nation - New Jordan's Principle Facility
Dakota Tipi First Nation -
Anishinabe of Wauzhushk Onigum - Golden Eagle Centre Retrofitting Project
Anishinabe of Wauzhushk Onigum -
Lake Manitoba First Nation - CHRT41 FNCFS Prevention Centre
Lake Manitoba First Nation -
Development of 20 Residential Housing Lots on Anishinabe of Wauzhushk Onigum Nation
Anishinabe of Wauzhushk Onigum -
New Fibre Installation
Project site: Various parts of Manitoba -
New Broadband Communications North Inc. Telecommunication Tower at Lake Manitoba First Nation on Dog Creek Reserve No. 46
Lake Manitoba First Nation, MB -
New Fibre Installation
Project site 08 (Kenora No. 38B) -
Wauzhushk Onigum Multi-Purpose Centre
Wauzhushk Onigum Multi-Purpose Centre -
Construction of Land-Based and Cultural Learning Centre on Wauzhushk Onigum Nation
Wauzhushk Onigum Nation -
Little Grand Rapids Dock & Dock Foundation Posts
Little Grand Rapids -
Little Grand Rapids RCMP New Living Quarters
Little Grand Rapids -
Southeast CFS Little Grand Rapids Staff Housing (Personnel and Visiting Professionals) and Prevention Centre
Little Grand Rapids First Nation -
Sandy Bay First Nation New Water Treatment Plant
Sandy Bay First Nation -
Little Grand Rapids First Nation School
Little Grand Rapids First Nation School -
New Fibre Installation - Sandy Bay
Project site: Sandy Bay -
Sandy Bay First Nation CFS Prevention Center Temporary Facilities (10 RTMs)
Sandy Bay First Nation -
Little Grand Rapids First Nation Transitional Housing (Temporary Housing)
Little Grand Rapids First Nation -
Northwest Angle 33 First Nation Water Treatment Project - Angle Inlet
Northwest Angle #33 FN -
Aboveground Fuel Storage Replacement in Little Grand Rapids, Manitoba
Little Grand Rapids -
Little Grand Rapids Submarine Cable Installation Project
Little Grand Rapids -
Grassy Narrows First Nation 20-unit Apartment Complex
Grassy Narrows First Nation -
Grassy Narrows Mercury Care Home - additional Federal Authority
Grassy Narrows First Nation -
Grassy Narrows Long-term Care and Treatment Facility Construction
Grassy Narrows Long-term Care and Treatment Facility Construction -
Grassy Narrows First Nation Mercury Care Home Paapiiwaaniimaan Healing Trail - Additional Federal Authority
Grassy Narrows First Nation -
Long Plain FN - Directional Drilling - Water and Sewer Pipeline
Long Plain First Nation -
Grassy Narrows First Nation Family Services Building Construction
Grassy Narrows First Nation -
Grassy Narrows First Nation Water and Wastewater System Upgrades
Grassy Narrows First Nation -
Grassy Narrows - Health Centre Renewal
Grassy Narrows -
Windigo Island Dock Replacement Project
Animakee Wa Zhing #37 -
Windigo Island Water Treatment Project
Animakee Wa Zhing First Nation - Windigo Island -
Upgrade of the Windigo Island Docking Infrastructure Accessibility
Windigo Islands -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake Manitoba Outlet Channel inlet in Lake Manitoba -
Long Plain - CHRT41 - Prevention Centre - P055810 - 2324
Long Plain First Nation -
Long Plain School Renovation & Addition
Long Plain First Nation -
Long Plain First Nation - Water Treatment Plant Upgrades
Long Plain First Nation -
Roseau River AFN Riverbank Stabilization Project
Roseau River AFN Riverbank Stabilization Project -
Berens River 13 Rapid Housing Fourplexes
Berens River 13 -
Roseau River Anishinaabe First Nation Waste Transfer Station
Roseau River Anishinaabe First Nation -
Dakota Women's Lodge (Winyan Tipi)
Portage la Prairie -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake Manitoba Outlet Channel outlet on Lake St. Martin -
Xplornet Communications Inc. - XCS - Antenna Structure - Piney Port Border Crossing, Hwy 89, Piney Port, MB
Piney Port Border Crossing -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake St. Martin Outlet Channel outlet on Lake Winnipeg -
Pauingassi First Nation Child and Family Services Prevention Building and Staff Housing
Pauingassi First Nation -
South Junction Port of Entry Redevelopment
South Junction Port of Entry -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake St. Martin Outlet Channel inlet on Lake St. Martin -
Chief Elsie Bouchie Culture Camp
Pigeon River 13A -
McBeth Point Harbour Improvements
McBeth Point Harbour -
Great Bear Gold Project
23 kilometres southeast of Red Lake -
Great Bear Advanced Exploration Project
25 kilometres southeast of Red Lake -
Dauphin River Harbour Manitoba - Routine Maintenance Dredging of the Dauphin River at Lake Winnipeg - Winter 2019
Dauphin River Harbour -
Dauphin River Small Craft Harbour Dredging and Pile Installation
Dauphin River Small Craft Harbour -
Sprague Port of Entry Redevelopment
Sprague Port of Entry -
Lake St. Martin - Water Treatment Plant Zebra Mussels Control
Lake St. Martin -
New Fibre Installation - Dauphin River
Project site 1: Anama Bay -
Project 4 - All-Season Road Connecting Berens River to Poplar River First Nation
East side of Lake Winnipeg, between Poplar and Berens Rivers -
Addition to Buffalo Point First Nation Radiocommunication Tower at Buffalo Point, MB.
Buffalo Point, MB -
Ebb and Flow First Nation - Road and Drainage Upgrades
Ebb and Flow First Nation -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 5: BCN-BRR-TW2 -
Berens River Bridge Replacement
Berens River First Nation -
Xplornet Inc. Radiocommunication Antenna Addition on Ebb and Flow First Nation Reserve No. 280
Ebb and Flow First Nation Reserve No. 280 -
Berens River First Nation Road Upgrades
Berens River -
CSC97 - Ebb and Flow First Nation Water Supply Line Project
Ebb and Flow First Nation -
Berens River Water Treatment Plant Upgrade
Berens River First Nation -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 3: Berens River 13 -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 4: BCN-BRR-TW1 -
Pinaymootang First Nation Water Treatment Upgrades
Pinaymootang First Nation -
Berens River Emergency Temporary School
Berens River First Nation -
Harbour Improvements - Berens River - Sigurdsson Island, MB
Berens River -
Berens River Harbour Launch Ramp Reconstruction
Berens River Small Craft Harbours -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Gretna -
Valley Fiber Limited Radiocommunication Tower on Fairford First Nation Reserve No. 50
Fairford First Nation Reserve No. 50 -
New Fibre Installation - Dauphin River
Project site 2: Obushkudayang Indian Reserve