Launch Ramp Reconstruction - Calders Dock, MB - Fall 2021
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Calders Dock Harbour, Manitoba is located approximately 17km South of the town of Pine Dock, approximately 203km North of Winnipeg, MB. The harbour is an active commercial fishing facility under the administration of Fisheries and Oceans Canada (DFO) Small Craft Harbours Branch (SCH).
Small Craft Harbours Branch, (SCH) is proposing to reconstruct the launch ramp at Calders Dock Harbour, MB. The scope of work includes the demolition and removal of the existing pre-cast launch ramp pads and reinforced concrete slab, and the construction of a new launch ramp using pre-cast launch ramp pads. The work area at Calders Dock Harbour is approximately 175 m2. The work will be done in open water conditions using shore-based equipment and is scheduled for October 2021.
Latest update
July 27, 2021 – Fisheries and Oceans Canada issued its Notice of Determination and determined that the project is not likely to cause significant adverse environmental effects.
Participate
Contacts
Fisheries and Oceans Canada, Small Craft Harbours BranchStephen Mazur, Senior Project Technologist
501 University Crescent
Winnipeg, Manitoba R3T 2N6
Telephone: 204-984-5610
Email: stephen.mazur@dfo-mpo.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Calders Dock Harbour (Manitoba)
-
Nature of Activity
- Ports and Harbours
-
Assessment Status
Completed -
Start Date
2021-06-23 -
Proponent
Fisheries and Oceans Canada, Small Craft Harbours Branch -
Authorities
- Fisheries and Oceans Canada
-
Assessment Type
Project on federal lands -
Reference Number
81730
Nearby assessments
...within 200 kilometres-
Launch Ramp Replacement, Pine Dock, Manitoba
Pine Dock -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 3: BCN-BLD-TW3 -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 2: BCN-BLD-TW2 -
Launch Ramp Replacement, Matheson Island, Manitoba
Matheson Island -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation School
Bloodvein School -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein River Airport Wildlife Fencing
Bloodvein River -
Bloodvein First Nation Staff Housing
Bloodvein First Nation -
Bloodvein First Nation CFS Prevention Building
Bloodvein First Nation -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 1: BCN-BLD-TW1 -
New (Multiple) and Upgrades (Multiple) Radiocommunications Towers
Bloodvein -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bell MTS Radiocommunication Tower on Bloodvein Reserve No. 12
Bloodvein Reserve No. 12 -
Wharf Reconstruction - Little Grindstone, MB - Winter/Spring 2020
Little Grindstone Harbour -
Sugar Creek Peat Harvesting Project
Fisher River Cree Nation -
Launch Ramp Reconstruction - Gull Harbour, MB - Fall 2021
Gull Harbour -
Gull Harbour Lighthouse Rebuild
Gull Harbour -
Fisher River Cree Nation East Road Replacement Project
Fisher River Cree Nation Reserve no. 44 -
Fisher River Used Oil Burner Installation
Fisher River Cree Nation -
Fisher River Cree Nation Jordan Principle Building
Fisher River Cree Nation -
Float Replacement, Hecla, Manitoba
Hecla, Manitoba -
Hollow Water Wharf Construction
Hollow Water -
New Fibre Installation
Hollow Water First Nation no.10 -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 4: Hollow Water No. 10 -
Hollow Water - CHRT 41 - Staff Accommodations - 2324
Hollow Water - CHRT 41 - Staff Accommodations - 2324 -
Hollow Water First Nation Prevention Centre
Hollow Water First Nation -
Hollow Water First Nation Transitional Spaces
Hollow Water First Nation -
ENV - 268 - EA - ERP - Kinonjeoshtegon - CHRT 41 - JP New Building and Renovation - P057361 - 2425
Kinonjeoshtegon First Nation -
Hydrometric Station Decommissioning - Fisher River, Manitoba
Fisher River, Manitoba -
Peguis First Nation Recreation Centre Soil Remediation
Peguis First Nation Recreation Centre Soil Remediation -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Peguis First Nation Reserve No. 269
Peguis First Nation Reserve No. 269 -
New Peguis First Nation Radiocommunication Tower in Peguis, MB
Peguis, MB -
Launch Ramp Reconstruction - Riverton, Manitoba
Riverton, Manitoba -
Berens River 13 Rapid Housing Fourplexes
Berens River 13 -
Hnausa – Wharf Replacement Project
Hnausa -
Hnausa Harbour Manitoba - Harbour Dredging of Lake Winnipeg at Hnausa - Winter 2020-21
Hnausa Harbour -
Hnausa Harbour, Manitoba - FFMC Barge Loading Ramp Construction - Winter 2021
Hnausa Harbour -
Chief Elsie Bouchie Culture Camp
Pigeon River 13A -
McBeth Point Harbour Improvements
McBeth Point Harbour -
Project 4 - All-Season Road Connecting Berens River to Poplar River First Nation
East side of Lake Winnipeg, between Poplar and Berens Rivers -
Arnes Harbour Manitoba - Routine Maintenance Dredging of the Drunken River at Lake Winnipeg - Winter 2019
Arnes Harbour -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 5: BCN-BRR-TW2 -
Berens River Bridge Replacement
Berens River First Nation -
Berens River First Nation Road Upgrades
Berens River -
Black River Waste Transfer Station
Black River Reserve -
Black River First Nation Watermain Renewal Project
Black River First Nation -
New Fibre Installation
Black River First Nation no. 9 -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Black River First Nation Reserve No. 260
Black River First Nation Reserve No. 260 -
Black River First Nation Prevention Centre
Black River First Nation -
Berens River Water Treatment Plant Upgrade
Berens River First Nation -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 3: Berens River 13 -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 4: BCN-BRR-TW1 -
Black River First Nation - Transitional Housing
Black River First Nation -
Harbour Improvements - Berens River - Sigurdsson Island, MB
Berens River -
Berens River Harbour Launch Ramp Reconstruction
Berens River Small Craft Harbours -
Berens River Small Craft Harbour Breakwater Repairs and Pile Installation
Berens River - Sigurdsson Island Small Craft Harbour -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 6: BCN-BRR-TW3 -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake St. Martin Outlet Channel outlet on Lake Winnipeg -
Victoria Beach Hydrometric Stilling Well Removal - Winter 2024
Victoria Beach Harbour -
Victoria Beach Harbour Manitoba - Routine Maintenance Dredging of Lake Winnipeg at Victoria Beach - Winter 2019
Victoria Beach Harbour -
Little Grand Rapids Dock & Dock Foundation Posts
Little Grand Rapids -
Little Grand Rapids RCMP New Living Quarters
Little Grand Rapids -
Southeast CFS Little Grand Rapids Staff Housing (Personnel and Visiting Professionals) and Prevention Centre
Little Grand Rapids First Nation -
Little Grand Rapids First Nation School
Little Grand Rapids First Nation School -
Dauphin River Harbour Manitoba - Routine Maintenance Dredging of the Dauphin River at Lake Winnipeg - Winter 2019
Dauphin River Harbour -
Dauphin River Small Craft Harbour Dredging and Pile Installation
Dauphin River Small Craft Harbour -
Aboveground Fuel Storage Replacement in Little Grand Rapids, Manitoba
Little Grand Rapids -
New Fibre Installation - Dauphin River
Project site 1: Anama Bay -
Little Grand Rapids Submarine Cable Installation Project
Little Grand Rapids -
Little Grand Rapids First Nation Transitional Housing (Temporary Housing)
Little Grand Rapids First Nation -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake St. Martin Outlet Channel inlet on Lake St. Martin -
Gimli Harbour Launch Ramp Reconstruction - Gimli, MB - Winter 2021/22
Gimli Harbour, Gimli, MB -
Sagkeeng First Nation - Shoreline Stabilization - Segment 4
Sagkeeng First Nation -
Traverse Bay Shoreline Stabilization - Site A (North Shoreline)
Traverse Bay North Shoreline - Fort Alexander Reserve -
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection
Sagkeeng First Nation - Hybrid Green Infrastructure Shoreline Protection -
Sagkeeng (Fort Alexander) Assisted Living Complex
Sagkeeng First Nation -
Pauingassi First Nation Child and Family Services Prevention Building and Staff Housing
Pauingassi First Nation -
Lake St. Martin - Water Treatment Plant Zebra Mussels Control
Lake St. Martin -
Launch Ramp Replacement, Balsam Bay, Manitoba
Balsam Bay, Manitoba -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake Manitoba Outlet Channel outlet on Lake St. Martin -
New Fibre Installation - Dauphin River
Project site 2: Obushkudayang Indian Reserve -
Little Saskatchewan First Nation - Mino-Aya-Win Centre
Little Saskatchewan First Nation -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake Manitoba Outlet Channel inlet in Lake Manitoba -
Brokenhead - CHRT41 - Jordan's Principle Building/Centre for BON - 2324
Brokenhead Jordan's Principle Centre -
Brokenhead Ojibway Nation - Elder's Lodge - 2324
Brokenhead Ojibway Nation - Elder's Lodge - 2324 -
Brokenhead Ojibway Nation Elders Lodge Project
Brokenhead Ojibway Nation -
Multi-use Arbour & Powwow Grounds on Brokenhead Reserve
Scanterbury on the Brokenhead Reserve -
Pinaymootang First Nation Water Treatment Upgrades
Pinaymootang First Nation -
Brokenhead Ojibway Nation Land Base Building
Brokenhead Ojibway Nation - Reserve No. 4 -
Brokenhead Ojibway Nation - Cultural Healing Lodge Development
Brokenhead Ojibway Nation -
Lake Manitoba - South Access Road Upgrades - 2324
Lake Manitoba -
Rockwood National Wildlife Area Water Control Structure Re-naturalization Project
Rockwood National Wildlife Area -
Lake Manitoba First Nation - CHRT41 FNCFS Prevention Centre
Lake Manitoba First Nation -
New Fibre Installation
Project site: Various parts of Manitoba -
New Broadband Communications North Inc. Telecommunication Tower at Lake Manitoba First Nation on Dog Creek Reserve No. 46
Lake Manitoba First Nation, MB -
Wharf Demolition and Reconstruction - George Island, MB - Summer 2020/Winter 2021
George Island Harbour -
Poplar River First Nation Water Treatment Plant
Poplar River First Nation -
Selkirk CCG Asphalt paving
Selkirk Coast Guard Base -
Project 4 - All-Season Road Connecting Berens River to Poplar River First Nation
-
Poplar River First Nation School
Poplar River Manitoba School -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 1: Poplar River 16 Tower 1 -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 2: Poplar River 16 Tower 2 -
In Situ Decommissioning of the Whiteshell Reactor #1
Pinawa -
Teacherages Project (Site Servicing)
Poplar River First Nation -
Poplar River Bridge Replacement
Poplar River First Nation -
Poplar River First Nation - Community Wharf
Poplar River First Nation -
New (Multiple) and Upgrades (Multiple) Radiocommunications Towers
Poplar River -
Poplar River - Harbour Improvements
Poplar River -
Poplar River Harbour Manitoba - Routine Maintenance Dredging of the Poplar River at Lake Winnipeg - Winter 2019
Poplar River Harbour -
Lower Fort Gary Wastewater Treatment Plant Outflow Pipe Replacement
Lower Fort Garry National Historic Site -
Modification to Poplar River First Nation Radiocommunication Tower at Poplar River, MB
Poplar River -
Poplar River First Nation Lagoon Expansion
Poplar River First Nation -
St. Andrews Lock and Dam Bridge Deck Replacement
St. Andrews Lock and Dam -
Ebb and Flow First Nation - Road and Drainage Upgrades
Ebb and Flow First Nation -
Xplornet Inc. Radiocommunication Antenna Addition on Ebb and Flow First Nation Reserve No. 280
Ebb and Flow First Nation Reserve No. 280 -
CSC97 - Ebb and Flow First Nation Water Supply Line Project
Ebb and Flow First Nation -
Sandy Bay First Nation New Water Treatment Plant
Sandy Bay First Nation -
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades -
New Fibre Installation - Sandy Bay
Project site: Sandy Bay -
New Fibre Installation / Upgrade Multiple Towers
Kewaywin PoP -
Sandy Bay First Nation CFS Prevention Center Temporary Facilities (10 RTMs)
Sandy Bay First Nation -
Manitoba-Minnesota Transmission Project
Riel Converter Station, near Dorsey, Manitoba -
T-91 VORTAC Site Decommissioning
Winnipeg Richardson International Airport -
Pond and Landscape Upgrade at the Winnipeg Tax Centre
Winnipeg -
Avis overflow storage compound Sherwin Road - Decommissioning
Winnipeg Richardson International Airport -
Energy East Project
Winnipeg -
Airport West Perimeter Road and Primary Security Line Relocation
Winnipeg Richardson International Airport -
New (Multiple) Tower Construction & New Fibre Installation
Mosakahiken Cree Nation (Moose Lake), Northern Manitoba -
Electric Bus Charging Station Removal and Demolition
Winnipeg Richardson International Airport -
Runway 18-36 Rehabilitation at YWG
Winnipeg Richardson International Airport -
Winnipeg Airport West Lands Moray Street Extension and Site Servicing
Winnipeg Richardson International Airport -
Generator Replacement and Fire Panel Upgrade at existing Hangar building
Winnipeg Richardson International Airport (YWG) -
T-201 Standard Aero Plant 6 Building Expansion
Winnipeg Richardson International Airport -
T-283 SkyNorth Air Apron Pavement Expansion project
Winnipeg Richardson International Airport -
T-145 STARS Hangar Addition
Winnipeg Richardson International Airport -
YWG Groundside Roadway Infrastructure Upgrade Project
Winnipeg Richardson International Airport -
Temporary Dock - The Forks National Historic Site, Red River, MB
The Forks National Historic Site, Winnipeg -
Vivian Sand Project
Springfield -
T-149 & T-150 Air Canada Hangar, Petroleum Storage System Upgrades
Winnipeg Richardson International Airport -
Air Canada Hangar T-149 water supply refurbishment project
Winnipeg Richardson International Airport -
East Side Air Cargo Development at Winnipeg Richardson International Airport (YWG)
Winnipeg Richardson International Airport -
2023 YWG Airfield Improvements Project
Winnipeg Richardson International Airport -
Upgrade of 17 Wing Vehicle Fuel Farm - 17 Wing Winnipeg
17 Wing Winnipeg -
2026 Airfield Improvements Project
Winnipeg Richardson International Airport -
Perimeter Aviation T-5 Hangar Door Replacement
Winnipeg Richardson International Airport -
Perimeter Aviation Terminal Building Expansion
Winnipeg Richardson International Airport -
Keewatin Air T-216 Hanger - Medevac Facility Addition
Winnipeg Richardson International Airport -
17 Wing Winnipeg - V6600 Disposal of 13 RHUs and 18 Garages (South Site)
17 Wing Winnipeg -
Perimeter Aviation LP Parking Lot
Winnipeg Richardson International Airport -
New electrical service to existing building at 80 Hangar Line Road
Winnipeg Richardson International Airport (YWG) -
Hangar Line Road Extension - 17 Wing Winnipeg
17 Wing Winnipeg -
New Fibre Installation / Upgrade Multiple Towers
Kasabonika Lake PoP -
New Fibre Installation / Upgrade Multiple Towers
Wunnumin Lake PoP -
Pikangikum Rapid Housing Initiative
Pikangikum First Nation -
Pikangikum First Nation - Nursing Station Fuel Storage Tank System Repairs
Pikangikum First Nation -
Pikangikum Cultural Learning and Community Centre
Pikangikum First Nation -
Pikangikum Remediation
Pikangikum First Nation -
Pikangikum First Nation - 10 Unit Residential Construction Project
Pikangikum First Nation -
Naawi Oodena - Subdivision - Parcel A - 2324
Naawi Oodena -
Freshwater Institute Underground Chilled Water Piping Replacement
Freshwater Institute in Winnipeg, MB