Poplar River First Nation School
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Indigenous Services Canada (ISC), in partnership with the Poplar River First Nation (PRFN), are proposing to construct a new K-12 school and associated sporting/recreational facilities within the PRFN community on Indian Reserve (IR. 16) land (the Project). Once completed, the school will be owned and operated by the PRFN. The Project is generally located on the east side of the PRFN community and approximately 150 m from adjacent residences and the main community road (see Attachment A).
Coordinates of the project location are: 618134.56E, 5873038.47N (UTM Zone 14U)
The Project will require clearing an area of approximately 5 hectares of forest within Indian Reservation land (IR. 16) adjacent to the existing community of the Poplar River First Nation. The school will consist of a reinforced concrete foundation with piles to bedrock, a steel framed superstructure with concrete block and steel stud infill walls, finished with masonry and metal cladding and modified bitumen roof. NDL Construction was awarded the design-build contract to complete the architecture and engineering
design of the school and to lead its construction planning and delivery.
Number Ten Architecture Group is responsible for the design component of this project and, Dillon Consulting Ltd. is providing environmental and civil engineering services in support of Number Ten Architecture Group.
Latest update
Participate
Key documents
| Document Number | Document Title | File | Date |
|---|---|---|---|
| 1 | Notice of Determination for the Poplar River First Nation School | - | June 2, 2020 |
Contacts
Indigenous Services CanadaAngela Bidinosti, Senior Environmental Officer
200-365 Hargrave Street
Winnipeg, Manitoba R3B 3A3
Telephone: 204-984-0964
Fax: 204-983-2936
Email: angela.bidinosti@canada.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- Poplar River Manitoba School (Manitoba)
-
Nature of Activity
- Building and Property Development
-
Assessment Status
Completed -
Start Date
2019-12-11 -
Proponent
Poplar River First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
80374
Nearby assessments
...within 200 kilometres-
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 1: Poplar River 16 Tower 1 -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 2: Poplar River 16 Tower 2 -
Teacherages Project (Site Servicing)
Poplar River First Nation -
Project 4 - All-Season Road Connecting Berens River to Poplar River First Nation
-
Poplar River Bridge Replacement
Poplar River First Nation -
New (Multiple) and Upgrades (Multiple) Radiocommunications Towers
Poplar River -
Modification to Poplar River First Nation Radiocommunication Tower at Poplar River, MB
Poplar River -
Poplar River First Nation - Community Wharf
Poplar River First Nation -
Poplar River First Nation Lagoon Expansion
Poplar River First Nation -
Poplar River - Harbour Improvements
Poplar River -
Poplar River Harbour Manitoba - Routine Maintenance Dredging of the Poplar River at Lake Winnipeg - Winter 2019
Poplar River Harbour -
Poplar River First Nation Water Treatment Plant
Poplar River First Nation -
Wharf Demolition and Reconstruction - George Island, MB - Summer 2020/Winter 2021
George Island Harbour -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 6: BCN-BRR-TW3 -
Berens River Small Craft Harbour Breakwater Repairs and Pile Installation
Berens River - Sigurdsson Island Small Craft Harbour -
Berens River Harbour Launch Ramp Reconstruction
Berens River Small Craft Harbours -
Harbour Improvements - Berens River - Sigurdsson Island, MB
Berens River -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 4: BCN-BRR-TW1 -
New Tower Construction, Upgrade single tower & New Fibre Installation
Project site 3: Berens River 13 -
Berens River Water Treatment Plant Upgrade
Berens River First Nation -
Berens River First Nation Road Upgrades
Berens River -
Berens River Bridge Replacement
Berens River First Nation -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 5: BCN-BRR-TW2 -
Project 4 - All-Season Road Connecting Berens River to Poplar River First Nation
East side of Lake Winnipeg, between Poplar and Berens Rivers -
Chief Elsie Bouchie Culture Camp
Pigeon River 13A -
Berens River 13 Rapid Housing Fourplexes
Berens River 13 -
McBeth Point Harbour Improvements
McBeth Point Harbour -
Rossville Small Craft Harbour Improvements
Rossville (Mission Island) Small Craft Harbour -
Norway House Cree Nation School Renovation and Playground CSC28
Norway House Cree Nation -
Norway House Cree Nation Water Intake Replacement and Lagoon Cell Decommissioning
Norway House Cree Nation -
New Tower Construction, Upgrade Towers & New Fibre Installation
Project site 1: Norway House Cree Nation -
Norway House Cree Nation Business Center
Norway House Cree Nation -
Norway House Dock Removal
Norway House -
ENV - 268 - EA - ERP - Kinonjeoshtegon - CHRT 41 - JP New Building and Renovation - P057361 - 2425
Kinonjeoshtegon First Nation -
New Fibre Installation - Dauphin River
Project site 1: Anama Bay -
Dauphin River Small Craft Harbour Dredging and Pile Installation
Dauphin River Small Craft Harbour -
Dauphin River Harbour Manitoba - Routine Maintenance Dredging of the Dauphin River at Lake Winnipeg - Winter 2019
Dauphin River Harbour -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake St. Martin Outlet Channel outlet on Lake Winnipeg -
Misipawistik Cree Nation Cultural Centre
Misipawistik Cree Nation -
Misipawistik Cree Nation Cultural Centre
Grand Rapids -
Misipawistik - CHRT41 - P053203 - Phase 2 JP Project - 2324
Misipawistik Cree Nation -
New Fibre Installation
Grand Rapids (Misipawistik Cree Nation) -
Misipawistik Cree Nation - Water Treatment Plant Upgrade and Expansion Project
Misipawistik Cree Nation -
Bell MTS Radiocommunication Tower on Bloodvein Reserve No. 12
Bloodvein Reserve No. 12 -
New (Multiple) and Upgrades (Multiple) Radiocommunications Towers
Bloodvein -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 1: BCN-BLD-TW1 -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation CFS Prevention Building
Bloodvein First Nation -
Bloodvein First Nation Staff Housing
Bloodvein First Nation -
Bloodvein River Airport Wildlife Fencing
Bloodvein River -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation School
Bloodvein School -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 2: BCN-BLD-TW2 -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 3: BCN-BLD-TW3 -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake St. Martin Outlet Channel inlet on Lake St. Martin -
Pauingassi First Nation Child and Family Services Prevention Building and Staff Housing
Pauingassi First Nation -
Lake St. Martin - Water Treatment Plant Zebra Mussels Control
Lake St. Martin -
Little Grand Rapids Submarine Cable Installation Project
Little Grand Rapids -
Aboveground Fuel Storage Replacement in Little Grand Rapids, Manitoba
Little Grand Rapids -
New Fibre Installation - Dauphin River
Project site 2: Obushkudayang Indian Reserve -
Launch Ramp Reconstruction - Calders Dock, MB - Fall 2021
Calders Dock Harbour -
Little Grand Rapids Dock & Dock Foundation Posts
Little Grand Rapids -
Little Grand Rapids RCMP New Living Quarters
Little Grand Rapids -
Southeast CFS Little Grand Rapids Staff Housing (Personnel and Visiting Professionals) and Prevention Centre
Little Grand Rapids First Nation -
Little Grand Rapids First Nation School
Little Grand Rapids First Nation School -
Little Grand Rapids First Nation Transitional Housing (Temporary Housing)
Little Grand Rapids First Nation -
Launch Ramp Reconstruction - Whiskey Jack Portage, MB - Fall 2021
Whiskey Jack Portage -
Little Saskatchewan First Nation - Mino-Aya-Win Centre
Little Saskatchewan First Nation -
Chemawawin Cree Nation Water Treatment Plant Project
Chemawawin Cree Nation -
Fisher River Cree Nation East Road Replacement Project
Fisher River Cree Nation Reserve no. 44 -
Fisher River Cree Nation Jordan Principle Building
Fisher River Cree Nation -
Chemawawin Cree Nation Transitional Housing Building
Chemawawin Cree Nation -
Easterville Harbour Wharf and Launch Ramp Reconstruction
Easterville, Manitoba -
Fisher River Used Oil Burner Installation
Fisher River Cree Nation -
Wasagamack First Nation Leachate Management Upgrades (Engineered Wetlands) - 2021
Wasagamack First Nation -
STPFN Wastewater Treatment Plant Upgrade and Expansion Project
St. Theresa Point First Nation -
Hydrometric Station Decommissioning - Fisher River, Manitoba
Fisher River, Manitoba -
New Nursing Station
Wasagamack First Nation -
Wasagamack - Fuel Tank Relocation - 2324
Wasagamack Fuel Tanks -
St. Theresa Point First Nation - Old Bulk Fuels Decommissioning
St. Theresa Point First Nation -
Cross Lake Band of Indians - 14 Portable Classrooms
Cross Lake Band of Indians -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, and New Fibre Installation
Project Site 06: Island Lake region - Wasagamack Band Office -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, and New Fibre Installation
Project Site 14: Island Lake region - Theresa Point Band Office -
Pinaymootang First Nation Water Treatment Upgrades
Pinaymootang First Nation -
St Theresa Point Northern Store Contamination Remediation
St Theresa Point Former Bulk Fuel Plant -
STPFN Wastewater Treatment Plant Upgrade and Expansion Project
St. Theresa Point First Nation -
CLCOI Road B Sewer and Water
Cross Lake Band of Indians -
St Theresa Point First Nation road re-construction
St Theresa Pt First Nation -
Cross Lake Band of Indians - Nikan Awasiska Agency Administration Office & Site Development
Cross Lake -
Cross Lake Women's Shelter
Cross Lake Women's Shelter -
Cross Lake Band of Indians Wastewater Lagoon Upgrade
Cross Lake -
New Fibre Installation
Project site 1 - Cross Lake First Nation -
Cross Lake Band of Indians - CHRT41 - Jordan Principle Building
Cross Lake Band of Indians -
Cross Lake Youth Centre
Cross Lake Band of Indians -
Sugar Creek Peat Harvesting Project
Fisher River Cree Nation -
Peguis First Nation Recreation Centre Soil Remediation
Peguis First Nation Recreation Centre Soil Remediation -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake Manitoba Outlet Channel outlet on Lake St. Martin -
New Peguis First Nation Radiocommunication Tower in Peguis, MB
Peguis, MB -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Peguis First Nation Reserve No. 269
Peguis First Nation Reserve No. 269 -
Wharf Reconstruction - Little Grindstone, MB - Winter/Spring 2020
Little Grindstone Harbour -
NAV CANADA Radiocommunication Antenna Addition in Island Lake, MB
Island Lake Tower 3, MB -
NAV CANADA Radiocommunication Antenna Addition in Island Lake, MB
Island Lake Tower 2, MB -
NAV CANADA Radiocommunication Antenna Addition in Island Lake, MB
Island Lake Tower 1, MB -
Skownan New Child and Family Services Prevention Building
Skownan First Nation -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, and New Fibre Installation
Project Site 22: Island Lake region - Garden Hill Band Office -
Aboveground Fuel Storage Replacement in Island Lake, Manitoba
Island Lake -
Garden Hill First Nation Road Upgrades
Garden Hill -
Skownan First Nation Waste Site Closure and Eco-Depot Facility
Skownan First Nation