New (Multiple) Tower Construction or Upgrade & New Fibre Installation
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
New (Multiple) Tower Construction
Southeast Resource Development Council Corp. is proposing the construction of 4 telecommunication towers to provide high-speed internet access to the communities of Bloodvein First Nation and Berens River First Nation . The towers will be between 10 to 36.5 meters tall. Antennas will be mounted at the top of these towers. These antennas will operate in the 5 and 60 GHz frequency bands. All of the equipment necessary to operate this facility will be housed in a small equipment cabinet located on site. These towers may undergo future modifications or the addition/replacement of antennas.
Upgrade (Multiple) Tower
Southeast Resource Development Council Corp. is proposing to the addition of 0.152m and 0.333m antennas, in the 5 and 60 GHz frequency bands, mounted at the top of an existing 36.5m towers which is located on Bloodvein and Berens River First Nations. The antennas will be installed to improve network access to high-speed internet. In the future, the existing tower may have other antennas and other radiocommunication equipment added or replaced.
New Fibre Installation
Southeast Resource Development Council Corp. plans to install underground fiber optic cabling, for Internet purposes, to all residential homes in the communities of Bloodvein and Berens River First Nations. The project involves the installation of approximately 176 km of underground and aerial fiber optic cable from the Manitoba Hydro Vault near Hollow Water along Provincial Highway 304 to the Broadband Communications North Central Office in Hollow Water and from the intersection of Provincial Road 304 and Rice River Road all the way through Bloodvein First Nation and continues into the Berens River First Nation.
The cable will be buried by directional drilling, trenching, or using existing conduits, or a combination of these methods in existing roadway alignments, but will be suspended on support structures to connect to residential homes and businesses.
Latest update
March 04, 2024 - Innovation, Science and Economic Development Canada has determined that the proposed project is not likely to cause significant adverse environmental effects.
This determination was based on a consideration of the following factors:
- relevant potential environmental effects;
- comments received from the public; and
- technically and economically feasible mitigation measures.
Mitigation and monitoring measures taken into account for this determination included active and adaptive management measures that would be implemented for the protection of the local environment. Based on the consideration of these measures, Innovation, Science and Economic Development Canada is satisfied that that the carrying out of the project is not likely to cause significant adverse environmental effects.
Therefore, Innovation, Science and Economic Development Canada may carry out the project, exercise any power, perform any duty or function, or provide financial assistance to enable the project to be carried out in whole or in part.
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination | - | March 4, 2024 |
1 | Notice of Intent to Make a Determination - Start of Public Comment Period | - | January 31, 2024 |
Contacts
Innovation Science Economic Development CanadaNATHALIE MARTEL, Program Officer
C.D. Howe Building
235 Queen Street
Ottawa, Ontario K1A 0H5
Email: Get-connected-brachez-vous@ised-isde.gc.ca
-
Location
- Project site 1: BCN-BLD-TW1 (British Columbia)
- Project site 2: BCN-BLD-TW2 (British Columbia)
- Project site 3: BCN-BLD-TW3 (British Columbia)
- Project site 4: BCN-BRR-TW1 (British Columbia)
- Project site 5: BCN-BRR-TW2 (British Columbia)
- Project site 6: BCN-BRR-TW3 (British Columbia)
-
Nature of Activity
- Other, not otherwise specified
-
Assessment Status
Completed -
Start Date
2024-01-31 -
Proponent
SOUTHEAST RESOURCE DEVELOPMENT COUNCIL CORP. -
Authorities
- Innovation, Science and Economic Development
-
Assessment Type
Project on federal lands -
Reference Number
87281
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Berens River Harbour Launch Ramp Reconstruction
Berens River Small Craft Harbours -
Harbour Improvements - Berens River - Sigurdsson Island, MB
Berens River -
Berens River Water Treatment Plant Upgrade
Berens River First Nation -
Berens River First Nation Road Upgrades
Berens River -
Berens River Bridge Replacement
Berens River First Nation -
Project 4 - All-Season Road Connecting Berens River to Poplar River First Nation
East side of Lake Winnipeg, between Poplar and Berens Rivers -
Chief Elsie Bouchie Culture Camp
Pigeon River 13A -
Berens River 13 Rapid Housing Fourplexes
Berens River 13 -
McBeth Point Harbour Improvements
McBeth Point Harbour -
Poplar River First Nation
Poplar River First Nation -
Wharf Demolition and Reconstruction - George Island, MB - Summer 2020/Winter 2021
George Island Harbour -
Bell MTS Radiocommunication Tower on Bloodvein Reserve No. 12
Bloodvein Reserve No. 12 -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein River Airport Wildlife Fencing
Bloodvein River -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein Band
Bloodvein School -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Project 4 — All-Season Road Connecting Berens River to Poplar River First Nation
-
Poplar River First Nation School
Poplar River Manitoba School -
Teacherages Project (Site Servicing)
Poplar River First Nation -
Poplar River Bridge Replacement
Poplar River First Nation -
Poplar River First Nation - Community Wharf - 2022/2023
Poplar River First Nation -
Poplar River - Harbour Improvements
Poplar River -
Poplar River Harbour Manitoba - Routine Maintenance Dredging of the Poplar River at Lake Winnipeg - Winter 2019
Poplar River Harbour -
Modification to Poplar River First Nation Radiocommunication Tower at Poplar River, MB
Poplar River -
Poplar River First Nation Lagoon Expansion
Poplar River First Nation -
Lake Manitoba and Lake St. Martin Outlet Channels Project
-
Dauphin River Harbour Manitoba - Routine Maintenance Dredging of the Dauphin River at Lake Winnipeg - Winter 2019
Dauphin River Harbour -
Launch Ramp Reconstruction - Calders Dock, MB - Fall 2021
Calders Dock Harbour -
Lake Manitoba and Lake St. Martin Outlet Channels Project
-
Fisher River Cree Nation East Road Replacement Project
Fisher River Cree Nation Reserve no. 44 -
Fisher River Used Oil Burner Installation
Fisher River Cree Nation -
Little Grand Rapids Submarine Cable Installation Project
Little Grand Rapids -
Aboveground Fuel Storage Replacement in Little Grand Rapids, Manitoba
Little Grand Rapids -
Little Grand Rapids First Nation School
Little Grand Rapids First Nation School -
Sugar Creek Peat Harvesting Project
Fisher River Cree Nation -
Hydrometric Station Decommissioning - Fisher River, Manitoba
Fisher River, Manitoba -
Peguis First Nation Recreation Centre Soil Remediation
Peguis First Nation Recreation Centre Soil Remediation -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Peguis First Nation Reserve No. 269
Peguis First Nation Reserve No. 269 -
Wharf Reconstruction - Little Grindstone, MB - Winter/Spring 2020
Little Grindstone Harbour -
Launch Ramp Reconstruction - Gull Harbour, MB - Fall 2021
Gull Harbour -
Cancelled
Hollow Water -
Lake Manitoba and Lake St. Martin Outlet Channels Project
-
New Fibre Installation
Hollow Water First Nation no.10 -
Hollow Water - CHRT 41 - Staff Accommodations - 2324
Hollow Water - CHRT 41 - Staff Accommodations - 2324 -
Pinaymootang First Nation Water Treatment Upgrades
Pinaymootang First Nation -
Launch Ramp Reconstruction - Riverton, Manitoba
Riverton, Manitoba -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Interlake Region -
Hnausa Harbour, Manitoba - FFMC Barge Loading Ramp Construction - Winter 2021
Hnausa Harbour -
Hnausa Harbour Manitoba - Harbour Dredging of Lake Winnipeg at Hnausa - Winter 2020-21
Hnausa Harbour -
Arnes Harbour Manitoba - Routine Maintenance Dredging of the Drunken River at Lake Winnipeg - Winter 2019
Arnes Harbour -
Misipawistik Cree Nation Cultural Centre
Misipawistik Cree Nation -
Misipawistik Cree Nation Cultural Centre
Grand Rapids -
Misipawistik - CHRT41 - P053203 - Phase 2 JP Project - 2324
Misipawistik Cree Nation -
Misipawistik Cree Nation - Water Treatment Plant Upgrade and Expansion Project
Misipawistik Cree Nation -
Black River First Nation Watermain Renewal Project
Black River First Nation -
New Fibre Installation
Black River First Nation no. 9 -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Black River First Nation Reserve No. 260
Black River First Nation Reserve No. 260 -
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades -
Norway House Cree Nation Water Intake Replacement and Lagoon Cell Decommissioning
Norway House Cree Nation -
New Tower Construction, Upgrade Towers & New Fibre Installation
Project site 1: Norway House Cree Nation -
Norway House Cree Nation Business Center
Norway House Cree Nation -
Victoria Beach Hydrometric Stilling Well Removal - Winter 2023 - Public Comments Invited
Victoria Beach Harbour -
Victoria Beach Harbour Manitoba - Routine Maintenance Dredging of Lake Winnipeg at Victoria Beach - Winter 2019
Victoria Beach Harbour -
New Fibre Installation / Upgrade Multiple Towers
Kewaywin PoP -
Lake Manitoba - South Access Road Upgrades - 2324
Lake Manitoba -
Gimli Harbour Launch Ramp Reconstruction - Gimli, MB - Winter 2021/22
Gimli Harbour, Gimli, MB -
New Broadband Communications North Inc. Telecommunication Tower at Lake Manitoba First Nation on Dog Creek Reserve No. 46
Lake Manitoba First Nation, MB -
Sagkeeng (Fort Alexander) Assisted Living Complex
Sagkeeng First Nation -
Deer Lake First Nation Small Business Center Project
Deer Lake First Nation -
Xplornet Inc. Radiocommunication Antenna Addition on Ebb and Flow First Nation Reserve No. 280
Ebb and Flow First Nation Reserve No. 280 -
Pikangikum Rapid Housing Initiative
Pikangikum First Nation -
New Fibre Installation / Upgrade Multiple Towers
Wunnumin Lake PoP -
New Fibre Installation / Upgrade Multiple Towers
Kasabonika Lake PoP -
Pikangikum First Nation - Nursing Station Fuel Storage Tank System Repairs
Pikangikum First Nation -
Pikangikum Cultural Learning and Community Centre
Pikangikum First Nation -
Pikangikum Remediation
Pikangikum First Nation -
Brokenhead - CHRT41 - Jordan's Principle Building/Centre for BON - 2324
Brokenhead Jordan's Principle Centre -
Brokenhead Ojibway Nation - Elder's Lodge - 2324
Brokenhead Ojibway Nation - Elder's Lodge - 2324 -
Multi-use Arbour & Powwow Grounds on Brokenhead Reserve
Scanterbury on the Brokenhead Reserve -
Sandy Bay First Nation New Water Treatment Plant
Sandy Bay First Nation -
Rockwood National Wildlife Area Water Control Structure Re-naturalization Project
Rockwood National Wildlife Area -
Selkirk CCG Asphalt paving
Selkirk Coast Guard Base -
Lower Fort Gary Wastewater Treatment Plant Outflow Pipe Replacement
Lower Fort Garry National Historic Site -
In Situ Decommissioning of the Whiteshell Reactor #1
Pinawa -
St. Andrews Lock and Dam Bridge Deck Replacement
St. Andrews Lock and Dam