Project Summary: Sandy Bay Ojibway First Nation (SBOFN) Reserve No. 283 is located on the south basin of Lake Manitoba in the Westlake Region of Manitoba, 120 km northwest of Winnipeg and 60 km northwest of Portage la Prairie. The reserve is accessed by an all-weather provincial road grid system via PTH 50. SBOFN has a total registered population of 6,781 people. The estimated on reserve population including both registered and unregistered persons is 4,909. The reserve contains 601 residences and 30 FN owned buildings and facilities. The existing treatment system does not comply with applicable guidelines including the ISC, Health Canada, or Manitoba Provincial requirements for surface water treatment. Furthermore, the system requires additional storage capacity to meet future community demands, provide for the fire protection needs, and meet the disinfection requirements for a surface water source. The proposed project includes construction of a new Water Treatment Plant (WTP), installation of a new raw water intake pipe and screen into Lake Manitoba, zebra mussel control system for the raw water intake system, new raw water intake pumphouse and intake line to the WTP, one new remote truckfill, one retrofitted truckfill, new water supply line rom the WTP to the school, and connections to the existing distribution and sewer system for the community. The existing WTP, school pumphouse, and westend pumphouse will be decommissioned. The new truckfill is proposed to be located at the corner of South Boundary road and South Ridge road complete with a reservoir to provide convenience for trucked delivery and reduce traffic in the core area. Whereas the retrofitted truckfill is proposed to be located at the soon to be decommissioned existing WTP, intended to service to the homes in the northern portion of the reserve. Infrastructure: The new WTP will require a new building within the community adjacent the arena, community centre, and school. A new raw water intake and screen into Lake Manitoba will be required. The new raw water supply line will be routed alongside an existing road to the new WTP. It is proposed that the new intake line be placed in the vicinity of the existing intake which is proposed to be capped (to be confirmed at detailed design) and will include a zebra mussel chemical control system and copper fish screen (DFO compliant). Power will be provided through the existing electrical lines with new electrical service provided at the WTP via existing 3-phase service available by the Arena located adjacent to the project site. The existing distribution lines within the community will be incorporated in the project with new connections including: connection of the WTP distribution line to existing, connection to the school and connection to the new truckfill. A connection and line to the existing sewage lagoon via a manhole will be added to discharge of WTP process wastewater. A new truckfill station complete with a reservoir is also proposed.
Activities: Planning: SBOFN has conducted a feasibility study and design is currently underway. The
planning team includes community representation. Site Preparation: Existing infrastructure (current
WTP, school pumphouse, westend pumphouse) will be decommissioned and equipment removed from these buildings. The building structures will likely stay in their current location(s) for repurposing or be demolished, as agreed upon with the Nation. The new WTP will be installed in a currently undeveloped plot of land, adjacent to the arena, located on the south side of Main Road within the community of Sandy Bay. The site will be leveled through cut and fill. Gravel and/or another fill will be purchased and delivered to site from an off-reserve source. Excavated material will be utilized to the extent possible. Based on the Geotechnical Investigations conducted in March/April 2019, the need for blasting is not anticipated as the testholes did not indicate bedrock presence. If required, it will be conducted by a licenced contractor and utilize blast mats to mitigate flyrock. Construction – The contract for construction will be tendered and a successful bidder will be chosen by SBOFN and the planning team. Construction will occur in over a one-year period anticipated to start in Fall 2019. A Health and Safety Plan will be developed to ensure that the active site does not become a hazard considering its central location within the community. Operation – SBOFN will be responsible for the operation of the WTP after commissioning is completed. The WTP is being designed to accommodate a projected population of 8,001 people over the next 20 years. Decommissioning - Decommissioning is only planned for the current WTP, school pumphouse, westend pumphouse. The new WTP is expected to be in operation for at least 20 years.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination for the Sandy Bay First Nation New Water Treatment Plant | - | November 18, 2020 |
Contacts
Indigenous Services CanadaDan Benoit, Sr Environmental Specialist
365 Hargrave Street
Winnipeg, Manitoba R3B 3A3
Telephone: 204-599-8579
Fax: 204-983-2936
Email: daniel.benoit@canada.ca
-
Location
- Sandy Bay First Nation (Manitoba)
-
Nature of Activity
- Water Management
-
Assessment Status
Completed -
Start Date
2020-11-27 -
Proponent
Sandy Bay First NAtion -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
81180
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Sandy Bay First Nation CFS Prevention Center Temporary Facilities (10 RTMs)
Sandy Bay First Nation -
Lake Manitoba - South Access Road Upgrades - 2324
Lake Manitoba -
New Broadband Communications North Inc. Telecommunication Tower at Lake Manitoba First Nation on Dog Creek Reserve No. 46
Lake Manitoba First Nation, MB -
Lake Manitoba First Nation - CHRT41 FNCFS Prevention Centre
Lake Manitoba First Nation -
Xplornet Inc. Radiocommunication Antenna Addition on Ebb and Flow First Nation Reserve No. 280
Ebb and Flow First Nation Reserve No. 280 -
Ebb and Flow First Nation - Road and Drainage Upgrades
Ebb and Flow First Nation -
East Trails Project - East Gate
Riding Mountain National Park -
New Staff Campground for Riding Mountain National Park
Riding Mountain National Park -
Clear Lake Cabin Area Kayak Launch Site
Riding Mountain National Park -
Dakota Tipi First Nation - New Jordan's Principle Facility
Dakota Tipi First Nation -
Escarpment Trailhead Sign Replacement and New vault Privy
Riding Mountain National Park -
Highway 19 Roadway Rehabilitation Addendum 2 Swanson Creek Culvert
Riding Mountain National Park -
Long Plain - CHRT41 - Prevention Centre - P055810 - 2324
Long Plain First Nation -
Long Plain School Renovation & Addition
Long Plain First Nation -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake Manitoba Outlet Channel inlet in Lake Manitoba -
Long Plain First Nation - Water Treatment Plant Upgrades
Long Plain First Nation -
Dakota Women's Lodge (Winyan Tipi)
Portage la Prairie -
Highway 19 Urgent Maintenance, Ditch Development and Culvert Replacements
Riding Mountain National Park of Canada -
Grey Owl Parking Lot Privy and Reroute
Riding Mountain National Park -
Clear Lake Golf Course Clubhouse Patio
Riding Mountain National Park of Canada -
Wasagaming Wildfire Risk Reduction 2023-2026
Riding Mountain National Park -
New Fibre Installation
Riding Mountain National Park -
Westman Communications Fibre Optic throughout Wasagaming
Riding Mountain National Park of Canada -
Mooswa East Water Line
Riding Mountain National Park -
Hydro - North Shore Line Project
Riding Mountain National Park of Canada -
Lakeshore Trail Re-design
Riding Mountain National Park of Canada -
Clear Lake Pier Repairs
Riding Mountain National Park of Canada -
Westman Communications Fiber Optic Cable
Riding Mountain National Park -
Tiger Salamander Crossing
Riding Mountain National Park -
Westman Communications Fiber - Phase 2 - Clear Lake Cabin Area
Riding Mountain National Park of Canada -
Northeast end of Clear Lake Cabin area storm water catch basin, drainage pipe and dissipation pool
Riding Mountain National Park -
New Cabin 56-4th St. S. Clear Lake Cabin Area
Riding Mountain National Park of Canada -
Management of Zebra Mussels in Clear Lake in Riding Mountain National Park
Riding Mountain National Park of Canada -
Rolling River First Nation - Construction of Three Bridges
Rolling River Reserve 67 -
Research, Monitoring and Management of Invasive Smallmouth Bass in Clear Lake, Riding Mountain National Park
Riding Mountain National Park -
Ominnik Marsh Trail Accessibility Reroute
Riding Mountain National Park -
South Lake Prescribed Fire
Riding Mountain National Park of Canada -
Smallmouth Bass Project
Riding Mountain National Park -
New Fibre Installation - RFNOW
Project site 1: CA12:CARBS-SLFN-23 -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake Manitoba Outlet Channel outlet on Lake St. Martin -
MB Hydro Pole and Arm Replacement
Riding Mountain National Park of Canada -
Utility Service Agreement BELL MTS Inc. Moon Lake Telecommunications Tower
Riding Mountain National Park -
Railway Crossings Upgrade - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Royal Avenue Reconstruction - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Construction of Land Vehicle Crew Training System Building - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Larkhill Avenue Reconstruction - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
N132 Petroleum, Oils and Lubricants (POL) Revitalization - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Ortona Road Fireguard Expansion - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Area A Security Fence - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Building Construction - Canadian Forces Base Shilo
Canadian Forces Base - Shilo -
Manitoba-Minnesota Transmission Project
Riel Converter Station, near Dorsey, Manitoba -
Construction of New Supply Well- Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Housing Renovations (HAYSL80) - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Construct Transition Centre - Canadian Forces Base (CFB) Shilo
Canadian Forces Base (CFB) Shilo -
Installation of Running Trail - Canadian Forces Base Shilo
Canadian Forces Base Shilo -
Construction of Land Vehicle Crew Training System Building
Canadian Forces Base/Area Support Unit Shilo -
Boreal Trail Reconstruction
Riding Mountain National Park of Canada -
Base Refueling Point Tank Replacement
CFB/ASU Shilo -
Rockwood National Wildlife Area Water Control Structure Re-naturalization Project
Rockwood National Wildlife Area -
Extension of Bison Enclosure South onto Plains Rough Fescue Grassland Restoration Area
Riding Mountain National Park -
Jackfish Creek Prescribed Fire
Riding Mountain National Park of Canada -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Peguis First Nation Reserve No. 269
Peguis First Nation Reserve No. 269 -
Demolition of Unnamed Building at Waggle Springs - Canadian Forces Base Shilo
Waggle Springs -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Keeseekoowenin First Nation (Indian Reserve 61) Project site 1 -
Peguis First Nation Recreation Centre Soil Remediation
Peguis First Nation Recreation Centre Soil Remediation -
Pinaymootang First Nation Water Treatment Upgrades
Pinaymootang First Nation -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Keeseekoowenin First Nation (Indian Reserve 61) Project site 2 -
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades
O-Chi-Chak-Ko-Sipi First Nation Water Treatment Plant Upgrades -
Pine Creek and Ebb and Flow - Anishinaabe Aki Petro-Can Gas Bar in Dauphin, MB - 2425
Dauphin -
Waywayseecappo First Nation Elton Property Gas Bar
Waywayseecappo First Nation -
Gimli Harbour Launch Ramp Reconstruction - Gimli, MB - Winter 2021/22
Gimli Harbour, Gimli, MB -
Hydrometric Station Decommissioning - Fisher River, Manitoba
Fisher River, Manitoba -
Generator Replacement and Fire Panel Upgrade at existing Hangar building
Winnipeg Richardson International Airport (YWG) -
Arnes Harbour Manitoba - Routine Maintenance Dredging of the Drunken River at Lake Winnipeg - Winter 2019
Arnes Harbour -
Runway 18-36 Rehabilitation at YWG
Winnipeg Richardson International Airport -
17 Wing Winnipeg - V6600 Disposal of 13 RHUs and 18 Garages (South Site)
17 Wing Winnipeg -
Hnausa Harbour, Manitoba - FFMC Barge Loading Ramp Construction - Winter 2021
Hnausa Harbour -
Hnausa Harbour Manitoba - Harbour Dredging of Lake Winnipeg at Hnausa - Winter 2020-21
Hnausa Harbour -
2023 YWG Airfield Improvements Project
Winnipeg Richardson International Airport -
East Side Air Cargo Development at Winnipeg Richardson International Airport (YWG)
Winnipeg Richardson International Airport -
New electrical service to existing building at 80 Hangar Line Road
Winnipeg Richardson International Airport (YWG) -
Hangar Line Road Extension - 17 Wing Winnipeg
17 Wing Winnipeg -
YWG Groundside Roadway Infrastructure Upgrade Project
Winnipeg Richardson International Airport -
Keewatin Air T-216 Hanger - Medevac Facility Addition
Winnipeg Richardson International Airport -
Perimeter Aviation T-5 Hangar Door Replacement
Winnipeg Richardson International Airport -
Perimeter Aviation Terminal Building Expansion
Winnipeg Richardson International Airport -
Launch Ramp Reconstruction - Riverton, Manitoba
Riverton, Manitoba -
Little Saskatchewan First Nation - Mino-Aya-Win Centre
Little Saskatchewan First Nation -
Naawi Oodena - Subdivision - Parcel A - 2324
Naawi Oodena -
Energy East Project
Winnipeg -
Swan Lake First Nation Youth & Prevention Centre
Swan Lake First Nation -
New (Multiple) Tower Construction & New Fibre Installation
Mosakahiken Cree Nation (Moose Lake), Northern Manitoba -
Temporary Dock - The Forks National Historic Site, Red River, MB
The Forks National Historic Site, Winnipeg -
Lower Fort Gary Wastewater Treatment Plant Outflow Pipe Replacement
Lower Fort Garry National Historic Site -
St. Andrews Lock and Dam Bridge Deck Replacement
St. Andrews Lock and Dam -
Fisher River Used Oil Burner Installation
Fisher River Cree Nation -
Lake St. Martin - Water Treatment Plant Zebra Mussels Control
Lake St. Martin -
Pond and Landscape Upgrade at the Winnipeg Tax Centre
Winnipeg -
Fisher River Cree Nation East Road Replacement Project
Fisher River Cree Nation Reserve no. 44 -
Sugar Creek Peat Harvesting Project
Fisher River Cree Nation -
Selkirk CCG Asphalt paving
Selkirk Coast Guard Base -
Freshwater Institute Underground Chilled Water Piping Replacement
Freshwater Institute in Winnipeg, MB -
Menzies Prescribed Fire
Riding Mountain National Park of Canada -
City of Winnipeg Insect Control Branch and Heliport Relocation Project
City of Winnipeg -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake St. Martin Outlet Channel inlet on Lake St. Martin -
Brokenhead Ojibway Nation - Elder's Lodge - 2324
Brokenhead Ojibway Nation - Elder's Lodge - 2324 -
Multi-use Arbour & Powwow Grounds on Brokenhead Reserve
Scanterbury on the Brokenhead Reserve -
Brokenhead - CHRT41 - Jordan's Principle Building/Centre for BON - 2324
Brokenhead Jordan's Principle Centre -
Vehicle and Equipment Management Agency Radiocommunication Antenna Addition in Manitou, MB
Manitou -
Launch Ramp Replacement, Balsam Bay, Manitoba
Balsam Bay, Manitoba -
Victoria Beach Hydrometric Stilling Well Removal - Winter 2024
Victoria Beach Harbour -
Victoria Beach Harbour Manitoba - Routine Maintenance Dredging of Lake Winnipeg at Victoria Beach - Winter 2019
Victoria Beach Harbour -
Launch Ramp Reconstruction - Mossey River, MB - Fall 2021
Mossey River Harbour -
Erosion Control on Hales Creek within the Lake Winnipeg Basin with Sioux Valley Dakota Nation
Sioux Valley Dakota Nation -
Pope National Wildlife Area Water Control Structure Renaturalization Project
Pope National Wildlife Area -
Water Retention within the Lake Winnipeg Basin with Sioux Valley Dakota Nation
Sioux Valley Dakota Nation -
Float Replacement, Hecla, Manitoba
Hecla, Manitoba -
Morden Pesticide and Chemical Building Project
Morden -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Morden -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southeast -
Lake Manitoba and Lake St. Martin Outlet Channels Project
Lake St. Martin Outlet Channel outlet on Lake Winnipeg -
Waywayseecappo - New Water Treatment Plant - 2324
Waywayseecappo WTP -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northeast -
Wharf Reconstruction - Little Grindstone, MB - Winter/Spring 2020
Little Grindstone Harbour -
PARKS CANADA AGENCY - Riding Mountain National Park (West Side) Addition of New Site Known as Tower Hill
PARKS CANADA AGENCY - Riding Mountain National Park (West Side) -
Launch Ramp Reconstruction - Gull Harbour, MB - Fall 2021
Gull Harbour -
Tower Hill VHF Tower
Riding Mountain National Park -
Dauphin River Harbour Manitoba - Routine Maintenance Dredging of the Dauphin River at Lake Winnipeg - Winter 2019
Dauphin River Harbour -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Southwest -
New Telecommunication Towers on the Waywayseecappo First Nation Reserve
Waywayseecappo First Nation Northwest -
Sagkeeng (Fort Alexander) Assisted Living Complex
Sagkeeng First Nation -
Black River First Nation Watermain Renewal Project
Black River First Nation -
Xplornet Communications Inc. Radiocommunication Antenna Addition on Black River First Nation Reserve No. 260
Black River First Nation Reserve No. 260 -
New Fibre Installation
Black River First Nation no. 9 -
Black River First Nation - Transitional Housing
Black River First Nation -
Vivian Sand Project
Springfield -
Launch Ramp Reconstruction - Calders Dock, MB - Fall 2021
Calders Dock Harbour -
ENV - 268 - EA - ERP - Kinonjeoshtegon - CHRT 41 - JP New Building and Renovation - P057361 - 2425
Kinonjeoshtegon First Nation -
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324
Tootinaowaziibeeng - CHRT 41 - Jordan's Principle - Multiple Buildings - 2324 -
Tootinaowaziibeeng - CHRT 41 - Wellness Centre
Tootinaowaziibeeng -
Birdtail Sioux Dakota Nation Prevention Centre for the Delivery of FNCFS
Birdtail Sioux Dakota Nation -
Xplornet Communications Inc. Telecommunication Tower at Canada Border Services Agency - Cartwright Port of Entry, MB
Cartwright, MB -
Cartwright Port of Entry Redevelopment
Cartwright Port of Entry -
Hollow Water - CHRT 41 - Staff Accommodations - 2324
Hollow Water - CHRT 41 - Staff Accommodations - 2324 -
Hollow Water First Nation Prevention Centre
Hollow Water First Nation -
New Fibre Installation
Hollow Water First Nation no.10 -
Hollow Water Wharf Construction
Hollow Water -
Winkler Port of Entry Redevelopment
Winkler Port of Entry -
Birdtail Sioux First Nation Aerated Lagoon Project
Birdtail Lagoon First Nation -
Lena Port of Entry Redevelopment
Lena Port of Entry -
Roseau River Anishinaabe First Nation Waste Transfer Station
Roseau River Anishinaabe First Nation -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Gretna -
In Situ Decommissioning of the Whiteshell Reactor #1
Pinawa -
Pine Creek First Nation - New Access Road (Phase 1 Road and School Area Road)
Road A - Phase I Road -
McBeth Point Harbour Improvements
McBeth Point Harbour -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 2: BCN-BLD-TW2 -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein River Airport Wildlife Fencing
Bloodvein River -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 1: BCN-BLD-TW1 -
Bloodvein First Nation School
Bloodvein School -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation Environmental Remedial Actions - 5 PHC Sites
Bloodvein First Nation -
Bloodvein First Nation CFS Prevention Building
Bloodvein First Nation -
Bloodvein First Nation Staff Housing
Bloodvein First Nation -
Bell MTS Radiocommunication Tower on Bloodvein Reserve No. 12
Bloodvein Reserve No. 12 -
New (Multiple) Tower Construction or Upgrade & New Fibre Installation
Project site 3: BCN-BLD-TW3 -
Vehicle and Equipment Management Agency Radio Services Radiocommunication Antenna Addition on Pine Creek First Nation Reserve No. 66A
Pine Creek First Nation, MB -
New Broadband Communications North Inc. Telecommunication Tower on Pine Creek First Nation Reserve No. 66A
Pine Creek First Nation, MB -
Pine Creek First Nation - New Access Road (Phase 1 Road and School Area Road)
Road B - School Area Road -
PADCOM Potash Solution Mining Project
16 kilometres west of Russell -
Boissevaine Port of Entry: Paving Replacement
Boissevain Port of Entry