Lake Diefenbaker Irrigation Expansion Projects
The Saskatchewan Water Security Agency is proposing to construct and operate irrigation projects surrounding Lake Diefenbaker, Saskatchewan. The Lake Diefenbaker Irrigation Expansion Projects would be completed in three separate phases and would dig about 500 km of canals, build four balancing reservoirs and an outfall structure into Buffalo Pound Lake. The proposed infrastructure would irrigate of up to 186,155 hectares (460,000 acres) of land and provide water for other uses. Phases 1 and 2 would take place northwest of Lake Diefenbaker and would complete the Westside Irrigation Canal System while Phase 3 is the development of the Qu'Appelle South Irrigation System to the south of Lake Diefenbaker.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
3 | Analysis Report | PDF (1.2 MB) | November 4, 2021 |
2 | Minister's Response | - | November 4, 2021 |
1 | Request for Designation of Project | PDF (1.2 MB) | June 16, 2021 |
Contacts
Lake Diefenbaker Irrigation Expansion ProjectsImpact Assessment Agency of Canada
Canada Place
9700 Jasper Avenue, Suite 1145
Edmonton, Alberta T5J 4C3
Telephone: 780-495-2037
Fax: 780-495-2876
Email: diefenbaker@iaac-aeic.gc.ca
-
Location
- Lake Diefenbaker (Saskatchewan)
-
Nature of Activity
- Water Management
-
Assessment Status
Completed -
Proponent
Saskatchewan Water Security Agency -
Authorities
- Impact Assessment Agency of Canada
-
Assessment Type
Assessment not applicable -
Reference Number
82781
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Nearby assessments
...within 200 kilometres-
Fishing Lake First Nation Sewage Pumping Station Upgrades
Fishing Lake First Nation -
Magazine Area Recapitalization Canadian Forces Ammunition Depot (CFAD) - 17 Wing Detachment Dundurn
Canadian Forces Ammunition Depot Dundurn,17 Wing Detachment Dundurn -
Woods Trail Intersection Realignment
17 Wing Detachment Dundurn's Range and Training Area -
Replacement of the Fuel Transfer Station and Fuel Tank Systems
17 Wing Detachment Dundurn -
Install Security Fence along Pryor Road at 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Stalwart National Wildlife Area Water Control Structure Re-naturalization Project
Stalwart National Wildlife Area -
Upgrade Woods Trail - 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Whitecap Dakota First Nation Subdivision Stage 4
NE 35-33-6 W3M -
Whitecap Dakota First Nation Sewage Pumping Station 3
Whitecap Dakota First Nation No 94 -
Dakota Springs Spa
Whitecap IR #94 -
Buffalo Berry Culvert Work
Whitecap IR #94 -
Whitecap Dakota First Nation Community Drainage
Whitecap Dakota First Nation No 94 -
North Creek Trail Realignment
17 Wing Detachment - Dundurn's Range and Training Area -
Construction and Installation of a Clear Span Acrow Panel Bridge at 17 Wing Detachment Dundurn
17 Wing Detachment Dundurn -
Last Mountain Lake National Wildlife Area Observation Tower II
Last Mountain Lake National Wildlife Area -
Gas Station Construction Saskatoon
Kahkewistahaw Indian Reserve No. 72A-2 -
Grasswoods Reserve Septage Receiving Station, Retention Pond and Final Disposal to City of Saskatoon Forcemain
Grasswoods IR 192J -
Last Mountain Lake National Wildlife Area Water Control Structure Re-naturalization Project
Last Mountain Lake National Wildlife Area -
125 Aspen Place Infrastructure & New Building Construction Project
125 Aspen Place, Saskatoon -
Moose Jaw Combined Cycle Power Station Project
Moose Jaw -
Sanitary Force Main Pipeline Replacement Design and Construction - 15 Wing Moose Jaw
15 Wing Moose Jaw -
Water Distribution Network Replacement and Storm and Sanitary Network Rehabilitation at 15 Wing Moose Jaw
15 Wing Moose Jaw -
Remediate Sites and Construct Buildings for Future Aircrew Training (FAcT) Program- 15 Wing Moose Jaw
15 Wing Moose Jaw -
Runway Rehabilitation - 15 Wing Moose Jaw
15 Wing Moose Jaw -
Muskeg Lake Cree Nation - Construction of commercial/retail building
ASIMAKANISEEKAN ASKIY 102A -
Kahkewistahaw First Nation - Mamawi Business Center
Kahkewistahaw No. 72A -
Kahkewistahaw Landing Infrastructure Construction
Kahkewistahaw IR 72A - 2 -
Regional Psychiatric Centre
Regional Psychiatric Centre -
Nutrien Aviation Hangar Expansion
STARS Saskatoon Base -
Saskatchewan Indian Institute of Technologies Hangar Expansion
Saskatchewan Indian Institute of Technologies -
Apron III infill
Saskatoon International Airport YXE -
General Aviation Hangars Development
Saskatoon International Airport YXE -
Chinook Power Station Project
Approximately 11 kilometres northwest of Swift Current -
Great Plains Generating Station Project
Northwest of Swift Current -
Aspen Power Station Project
Lanigan -
Ocean Man Indian Reserve 69E Pipeline
Ocean Man Indian Reserve 69E -
West Land Road and Sewer Extension
Sakimay IR 74-6 -
Saskatchewan Indigenous Enterprise Foundation Inc. Southern Office Complex
Lot 19 Plan 112422, NE 1/4 Sec. 20-17-20, W.2 M -
Piapot First Nation Road to Community Wells
Piapot IR 75 -
Beardy's & Okemasis Cree Nation Sewage Lagoon and Pumping Station Upgrades
Beardy's and Okemasis IR No. 96 & 97 -
Runway 13-31 Rehabilitation
Regina -
Runway De-Icing Liquid Storage Tank
Regina -
Piapot Lagoon, Forcemain and Sewage Pumping Station
Piapot IR 75 -
1201 Angus Street - Cowessess First Nation - Building Development for parking
Cowessess IR No. 73 -
Cowessess Urban Indigenous Health centre
Cowessess Indian reserve No. 73 -
1236 Albert Street - Cowessess First Nation - Building Development
Cowessess IR No. 73 -
Albert Street Building Development
1246 Albert Street, Regina, Saskatchewan -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Regina -
Kawacatoose First Nation Water Treatment Plant Upgrade and Expansion
Kawacatoose IR 88 -
Awasis Solar Project
SE 7-17-18 W2 -
Awasis Solar - 10 MW Project
Cowessess IR #73 -
Muscowpetung Powwow Arbour
Muscowpetung Saulteaux Nation -
Cowessess 10 MW Solar Project
Cowessess IR #73 -
New (Multiple) Tower Construction
Muscowpetung Saulteaux Nation - South Tower -
New (Multiple) Tower Construction
Muscowpetung Saulteaux Nation - North Tower -
New (Multiple) Tower Construction
School Tower -
Saskatchewan Agriculture Drainage Network - Wascana Block A Drainage Network Project
25 kilometres southeast of Regina -
Pasqua First Nation Elders's Centre
Pasqua First Nation -
Muskowekwan Lagoon & Sewage Pumping Station
Muskowekwan IR 85 -
Muskowekwan Gas Bar & Convenience Store
Muskowekwan IR 85 -
Muskowekwan Water Treatment Plant Upgrades
Muskowekwan IR 85 -
Muskowekwan Solid Waste Transfer Station
Muskowekwan IR 85 -
Grazing Permits on Saskatchewan First Nations Reserve Lands
Saskatchewan First Nation Communities -
Agricultural permits on Saskatchewan First Nation Reserve Lands
Saskatchewan First Nations -
Remediation of One Arrow First Nation River Lot 62
One Arrow IR 95 -
Muskowekwan Potash Mine Project
Lestock -
Batoche Drainage Improvement
Grasslands National Park -
Fuel Reduction Program for Batoche National Historic Site
Batoche National Historic Site -
Muscowpetung Powwow Arbour
Muscowpetung IR 80 -
Pasqua First Nation - New Spray Park
Pasqua 79 -
Mosquito Grizzly Bear's Head Lean Man First Nation - Core Area Subdivision
Mosquito Grizzly Bear's Head Lean Man First Nation -
On hold - Piapot Wind Farm Project
Piapot Indian Reserve 75 -
Mosquito First Nation Lagoon Upgrades
Mosquito First Nation -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 1 -
Willow Cree Healing Lodge - Construction of Ready to Move (RTM) Buildings
Willow Cree Healing Lodge -
Beardy's and Okemasis Cree Nation Water Treatment Plant Upgrades Project
Beardy's and Okemasis Cree Nation -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 2 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Tower 3 -
Hutterite Brethren Church of Twin Creek Inc. - Grazing Permit - Muskowekwan First Nation - 2019-2023
Muskowekwan 85-10 and 85-15 -
New (Multiple) Tower Construction, Upgrade (Single) Tower, New Fibre Installation
Point of presence -
Beardy's & Okemasis Cree Nation Stage 4 Subdivision
Beardy's & Okemasis Cree Nation -
Standing Buffalo Dakota Nation - Water Treatment Plant Upgrade
Standing Buffalo IR 78 -
Standing Buffalo Gas Station Expansion
Standing Buffalo Dakota Nation -
Standing Buffalo Dakota Nation - Solid Waste Transfer Station
Standing Buffalo IR 78 -
Enbridge Pipelines Inc. - Line 3 Replacement Program
Kerrobert -
On hold - Muskowekwan Wind Farm Project
Muskowekwan Indian Reserve 85-43, 85-49, 85-50, 85-63, 85-64, 85-65