Sunchild Gas Distribution Line

Sunchild Utilities plans to construct a 6" diameter natural gas distribution pipeline from a well pad located in NW24-23-10W5 to the community distribution line located in NW12-23-10W5M.  A small building on an area 10m2 will be constructed beside the well pad to allow for dehydrating/processing of the gas prior to distribution.  The pipeline will be approximately 3.2 to 3.4 km.  The pipeline will cross a creek and surrounding wetland through directional drilling during winter months.  The pipeline will follow existing cutlines and road allowences where possible. 


Latest update

October 6, 2020 – Indigenous Services Canada issued its notice of determination and determined that the project is not likely to cause significant adverse environmental effects.

 

.

Participate

Key documents

Key documents
Document Number Document Title File Date
3 Notice of Determination for the Sunchild Gas Distribution Line - October 6, 2020
2 Public Comment Period on Intent to Make a Determination DOCX (14 KB) June 16, 2020
1 434-Sunchild Gas Distribution Line - Project Description - 2020.06.04 PDF (593 KB) June 4, 2020

Contacts

Indigenous Services Canada
Stacey LeBlanc, Sr. Environment Officer
630 Canada Place, 9700 Jasper Ave
Edmonton, Alberta T5J 4G2
Telephone: 780-782-8350
Email: stacey.leblanc@canada.ca


  • Location

    • Sunchild (Alberta)
  • Nature of Activity

    • Oil and Gas
  • Assessment Status

    Completed
  • Start Date

    2020-06-16
  • Proponent

    Sunchild Utilities
  • Authorities

    • Indigenous Services Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    80787
Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Nearby assessments

...within 200 kilometres
Date modified: