Upgrading of Roadways in Beausoleil First Nation

The project will upgrade approximately 17.2 kilometres of roadway in Beausoleil, Ontario. The upgrades will involve the installation of sidewalks and a ditching system, rehabilitation of the sub-grade, and asphalt surfacing of the roadway and shoulders from O-Gema Road to Kate Kegwin Road (0.35 kilometres), with the remaining roads and shoulders (16.85 kilometres) paved with a double surface treatment. The project will improve road safety and reliability for drivers, cyclists and pedestrians, support better traffic flow, facilitate active transportation, reduce operation and maintenance costs, and extend the life of the assets.


Latest update

Notice of Determination

2020-08-17 – Infrastructure Canada issued its Notice of Determination and determined that the project is not likely to cause significant adverse environmental effects.

Participate

Contacts

Aboriginal Consultation and Environmental Services
1100 - 180 Kent St
Ottawa, Ontario K1P 0B6
Email: infc.aboriginalconsultenv-consultautochtonesenv.infc@canada.ca

Infrastructure Canada
Meng Koh, Senior Environmental Review and Approvals Officer
180 Kent Street
Ottawa, Ontario K1P 0B6
Telephone: 343-551-0418
Email: meng.koh@infc.gc.ca


  • Location

    • Beausoleil First Nation Reserve (Ontario)
  • Nature of Activity

    • Highways and Roads
  • Assessment Status

    Completed
  • Start Date

    2020-05-27
  • Proponent

    Beausoleil First Nation
  • Authorities

    • Infrastructure Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    80721
Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

Nearby assessments

...within 200 kilometres
Date modified: