Hard Surface Replacement

Replace the existing interlocking and damaged concrete on the sidewalks, curbs and walkways. Addition of a ramp that is compliant with AODA requirements. New layout of the MI parking lot to improve barrier-free accessibility and increase the number of parking spaces involving repainting of parking lines and some repaving. Through the preliminary design phase of this project, it was determined that the footprint of the above noted areas exceeded 1,000m2 (Approximately 1240m2 for paved walkways, approximately 1700m2 for interlocking paving, and approximately 3800m2 for barrier free parking areas).


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Latest update

July 29, 2022 – The public comment period on the project is closed. The authority is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects.

Key documents

Key documents
Document Number Document Title File Date
1 Public Notice - Hard Surface Replacement - June 29, 2022

List all records

Contacts

Public Services and Procurement Canada
Joseph Nguyen, Environmental Specialist
Toronto, Ontario M3L 2B5
Telephone: 437-992-4353
Email: Joseph.Nguyen@pwgsc-tpsgc.gc.ca


  • Location

    • 1050 Notre Dame Avenue, Sudbury, Ontario (Ontario)
  • Nature of Activity

    • Building and Property Development
  • Assessment Status

    In progress
  • Start Date

    2022-06-29
  • Proponent

    Public Services and Procurement Canada
  • Authorities

    • Public Services and Procurement Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    83752

Nearby assessments

..within 200 kilometres
Date modified: