Reconstruction of Nawash Unceded First Nation Roads and Culverts

 

The project will replace 23 culverts and reconstruct and resurface sections of roads in Chippewas of Nawash First Nation, Ontario. A total of 15 crossing culverts and 8 driveway culverts will be replaced and possibly upsized, which will also include cleaning out and regrading ditches, applying measures to prevent erosion of drainage inlets and outlets, relocating utilities, and reconstructing (2000 square metres) and resurfacing (400 square metres) sections of roads. The project will improve road safety and reliability, prevent future flooding and road washouts, and increase the service life of assets.


Latest update

03/01/2024 - The authorities have determined that the proposed project is not likely to cause significant adverse environmental effects. Therefore, the authorities may carry out the project, exercise any power, perform any duty or function, or provide financial assistance to enable the project to be carried out in whole or in part.

Participate

Key documents

Key documents
Document Number Document Title File Date
2 Notice of Determination - March 1, 2024

Contacts

Aboriginal Consultation and Environmental Services
1100 - 180 Kent St
Ottawa, Ontario K1P 0B6
Email: infc.aboriginalconsultenv-consultautochtonesenv.infc@canada.ca


  • Location

    • Neyaashiinigmiig (Ontario)
  • Nature of Activity

    • Highways and Roads
  • Assessment Status

    Completed
  • Start Date

    2020-05-29
  • Proponent

    Chippewas of Nawash Unceded First Nation
  • Authorities

    • Infrastructure Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    80739
Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

Nearby assessments

...within 200 kilometres
Date modified: