French River Septic Replacement

Disconnect the septic tank from the dam keeper residence and PSPC office. Remove the septic tank and leaching bed. Install new septic system composed of new septic tank and wastewater treatment systems or raised leaching bed. The configuration of the system will be decided with the aid of a specialist given restrictions of the location. Restore connection of the office to the septic system.

The comment period has now ended. 

 

More


Latest update

January 11, 2021 - The assessment decision statement has been issued to the proponent.

Participate

Contacts

PSPC
Michelle Fairbrother, Environmental Analyst
Telephone: 613-736-3274
Email: michelle.fairbrother@tpsgc-pwgsc.gc.ca


  • Location

    • French River Dam Office (Ontario)
  • Nature of Activity

    • Other, not otherwise specified
  • Assessment Status

    Completed
  • Start Date

    2020-09-01
  • Proponent

    PSPC
  • Authorities

    • Public Services and Procurement Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    80994