French River Boathouse, Wharf, and Workshop
This project will involve work at three structures at the French River Dam office site in Dokis, Ontario: the boathouse, wharf, and workshop. The boathouse will be replaced with a new light wood framed boathouse. This will include a new watercraft lifting system, concrete pier off-shore foundations and on-shore foundations. The wharf will be replaced with a new cast-in-place concrete earth retaining structure. The foundation of the workshop will be replaced with cast-in-place concrete piers.
The comment period has now ended.
Latest update
Participate
Key documents
| Document number | Document title | File | Date |
|---|---|---|---|
| 1 | Public Notice - French River Boathouse, Wharf, and Workshop | DOCX (13 KB) | November 24, 2020 |
Contacts
Environment, Health and SafetyPublic Services and Procurement Canada
11 Laurier Street
Portage III, Place du Portage
Gatineau, Quebec K1A 0S5
Email: TPSGC.RCNLVEEListedeControle-NCRECMPChecklist.PWGSC@tpsgc-pwgsc.gc.ca
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
-
Location
- French River Dam Office (Ontario)
-
Nature of activity
- Other, not otherwise specified
-
Assessment status
Completed -
Start date
2021-06-01 -
Proponent
PSPC -
Authorities
- Public Services and Procurement Canada
-
Assessment type
Project on federal lands -
Reference number
81171
Nearby assessments
...within 200 kilometres-
French River Septic Replacement
French River Dam Office -
French River Dams - Bearing Repairs
French River Dams -
Roof Replacement - French River Dams Office
French River Dam -
Portage Dam Concrete Storage Pad
Portage Dam -
Portage Channel Bridge Replacement - Keso Bay Road
Dokis -
Dokis First Nation - Chaudière Bridge Replacement Project
Dokis First Nation -
Dokis First Nation Water Treatment Plant
Dokis First Nation -
Dokis First Nation Hydro Line Servicing
Dokis First Nation -
Dokis First Nation - Lagoon Expansion
Dokis First Nation Reserve -
Sagamok Anishnawbek Water Infrastructure
Sagamok First Nation Reserve -
Nipissing First Nation - Cultural Center Construction
Nipissing First Nation -
Nipissing First Nation - Upgrades and Expansion of Garden Village Water Treatment Plant
Nipissing First Nation -
Nipissing First Nation - 20 Unit Subdivision Project
Nipissing First Nation -
VLA Water Plant Replacement
Nipissing -
Mnogin Constructed Wetland to Support Sustainable Water Treatment
Mnogin Constructed Wetland to Support Sustainable Water Treatment -
Short Range Development Road Upgrades and Bridge Replacement - 22 Wing North Bay
22 Wing North Bay -
New Fibre Installation - North Bay ON
Project site 1 - Lake Nipissing -
Short Range Development (SRD) Fence Installation – 22 Wing North Bay
22 Wing North Bay -
New Fibre Installation - North Bay ON
Project site 2 - Ruth Lake -
Nipissing First Nation - New Road Development: Yellek to Duchesnay
Nipissing First Nation - New Road Development: Yellek to Duchesnay -
New Fibre Installation
NIPISSING INDIAN RESERVE NO. 10 -
North Bay – Pile replacement project
North Bay -
North Bay Small Craft Harbour Rehabilitation
North Bay -
Highway 69 Four-laning from north of Magnetawan River to north of Highway 607 (Project 4)
-
Energy East Project
North Bay -
Chippewa Barracks Perimeter Security Fence, Fort Chippewa Barracks, 540 Chippewa St W, in North Bay Ontario
Fort Chippewa Barracks, 540 Chippewa St W, in North Bay -
Underground Complex Substation Replacement, North Bay, ON
Approximately 1.8 km south of 22 Wing's Main Base -
Shared Services Canada Upgrades - 22 Wing North Bay
22 Wing North Bay -
Manston Crescent Municipal Upgrades, Canadian Forces Base North Bay, Ontario
Manston Crescent is located on the north end of Canadian Forces Base, 22 Wing, in North Bay -
Upgrade Underground Municipal Services - 22 Wing North Bay
22 Wing North Bay -
Wahnapitae First Nation
Wahnapitae First Nation -
Installation of a Permeable Adsorptive Barrier (PAB) at 22 Wing North Bay
22 Wing North Bay -
Highway 69 Four-Laning from north of Harris Lake Road to north of Magnetawan River (Project 3)
-
Highway 69 Four-laning from north of Magnetawan River to north of Highway 607 (Project 4)
Henvey, Mason, Mowat -
Magnetawan First Nation - Wastewater System Upgrades
Magnetawan First Nation -
Magnetawan First Nation - Water Treatment Plant and Storage Upgrades
Magnetawan First Nation -
Replacement of the Britt Weather Radar
8 Station Road, Britt, Ontario, P0G 1A0 -
Magnetawan First Nation Underground Storage Tank Removal - Band Office
Magnetawan First Nation -
Highway 69 Four-Laning from north of Woods Road to north of Harris Lake Road (Project 2)
-
Highway 69 Four-Laning from north of Harris Lake Road to north of Magnetawan River (Project 3)
Wallbridge -
Highway 69 Four-Laning from north of Woods Road to north of Harris Lake Road (Project 2)
Harrison, Shawanaga, Wallbridge -
Highway 69 Four-Laning from North of Highway 559 to North of Woods Road (Project 1)
-
Shawanaga First Nation - Water Treatment Plant Upgrades
Shawanaga First Nation -
Shawanaga First Nation- Construction of Three (3) New Homes
Shawanaga First Nation -
Shawanaga First Nation - Lot Servicing for future houses
Shawanaga First Nation -
New Fibre Installation
Project site 1: Spottswood Bay, Lake Talon -
Highway 69 Four-Laning from North of Highway 559 to North of Woods Road (Project 1)
Carling -
New Fibre Installation
Project Site 2: Kaibuskong Bay -
Foundation Rehabilitation
19 Lisgar Street, Sudbury, Ontario -
Canadian Coast Guard Parry Sound Base Helipad Area Repair Project
Parry Sound -
Hard Surface Replacement
1050 Notre Dame Avenue, Sudbury, Ontario -
Wasauksing First Nation Peatland Wastewater System Design & Construction
Wasauksing First Nation Peatland Wastewater System Design & Construction -
Wasauksing First Nation - 10 Unit Residential Construction Project
Wasauksing First Nation -
Wasauksing First Nation - Lot Servicing for future houses
Wasauksing First Nation -
Wasauksing First Nation - Supply Island Lighthouse Demolition and Remediation
Supply Island Lighthouse -
New Fibre Installation
Project site 1: Ella Lake -
Atikameksheng By-Pass Road Construction - additional Federal Authority
Naughton -
Temagami First Nation Outdoor Cultural Spaces
Bear Island -
Wahnapitae First Nation - Prevention and Wellness Centre
Wahnapitae First Nation -
Wahnapitae First Nation New Housing Project - 5 New Homes and 7 Lots Servicing
Wahnapitae First Nation -
New Fibre Installation
Wahnapitae Indian Reserve No. 11 -
Wahnapitae First Nation Aggregate Project
location -
Atikameksheng Anishnawbek First Nation Business Park
Atikameksheng Anishnawbek First Nation -
Wahnapitae FN Micro Subdivision Project
Wahnapitae First Nation -
Atikameksheng By-Pass Road Construction
Naughton -
Atikameksheng Anishnawbek Septic & Watermain Upgrade
Naughton -
Atikameksheng Anishnawbek On Reserve New Housing
Atikameksheng Anishnawbek First Nation -
Wahnapitae New Subdivision Lot Servicing and Pre-Construction Activities
Wahnapitae First Nation -
Timiskaming Dams Complex - Buildings Replacement
Timiskaming Dams Complex in Long Sault Island, Temiscaming, ON -
Not Applicable
Timiskaming Dam -
Wahnapitae First Nation - Landfill Closure and Waste Transfer Station Construction
Wahnapitae First Nation -
Timiskaming Dam-Bridge of Quebec Replacement Project
Temiscaming -
Marina Construction Project
Kebaowek -
Development of four new streets in Kebaowek
Development of four new streets in Kebaowek -
Victoria Mine Project
Southwest of Sudbury -
New Fibre Installation
Project site 12: WHITEFISH LAKE INDIAN RESERVE NO. 6 -
Wahta Mohawk Housing Subdivision Project
Wahta Mohawk -
Wahta Mohawks - Waste Transfer Station and Landfill Closure
Wahta Mohawks -
Bala North Dam Waterpower, Lake Muskoka, Township of Muskoka Lakes
Bala -
Soil Remediation at Jannacks Narrows Minor Shore Light, Bala Park Island, Ontario
Jannacks Narrows Minor Shore Light, Ontario -
Longspur (Lang Lake) - Wharf Reconstruction
Longspur (Lang Lake) -
98 Manitoba Street Environmental Remediation
98 Manitoba Street, Bracebridge -
WRFN New Lagoon and Septic Bed Assessment/Replacement Program
Whitefish River First Nation -
Whitefish River First Nation - Waste Transfer Station Construction and Landfill Closure
Whitefish River First Nation -
Permanent Waterway Barriers for Latchford Dam
Latchford Dam -
Latchford Dam - Public Safety Fencing
Latchford Dam -
Bank Stabilization at Latchford Dam
Latchford Dam -
New Stoplog Lifter Latchford Dam
Latchford Dam -
New Fibre Installation
Project site 05: WIKWEMIKONG UNCEDED RESERVE -
New Fibre Installation
Project site 04: WHITEFISH RIVER INDIAN RESERVE NO. 4 -
Exterior Abatement and Soil Remediation at the Kagawong Lighthouse, Kagawong, Ontario
Kagawong, Ontario -
WRFN New Lagoon and Septic Bed Assessment/Replacement Program
Whitefish River First Nation -
WRFN New Lagoon and Septic Bed Assessment/Replacement Program
Whitefish River First Nation -
15 Lot Subdivision Expansion- Whitefish River First Nation
Whitefish River First Nation -
WRFN Septic Bed Assessment/Replacement Program
WRFN Septic Bed Assessment/Replacement Program -
Camp Queen Elizabeth Dining Hall and Wellness Cabin Improvement Project, Beausoleil Island
Georgian Bay Islands National Park of Canada -
YMCA Camp Queen Elizabeth Cabin Improvement Project
Georgian Bay Islands National Park -
New Fibre Installation
Project Site 03: Muskoka Lake -
Wikwemikong First Nation - Elders Home Redevelopment
Wikwemikong First Nation -
Wikwemikong First Nation - Lot Servicing
Wikwemikong Unceded Territory -
New Fibre Installation
Project site 11: WIKWEMIKONG UNCEDED RESERVE -
New Fibre Installation
Project site 06: WIKWEMIKONG UNCEDED RESERVE -
New Fibre Installation
Project Site 07: Pine Lake -
Kipawa Rare Earths Project
Kipawa -
Pretty Channel Dams Stabilization
Trent-Severn Waterway National Historic Site of Canada -
Ontario Waterways, Six Mile Lake Dams Rehabilitation
Trent-Severn Waterway National Historic Site of Canada -
YMCA Camp Kitchikewana Pumphouse Replacement Project
Georgian Bay Islands National Park of Canada -
Impeed the Reed
Georgian Bay Islands National Park -
White's Portage Dam Replacement, Trent-Severn Waterway
Trent-Severn Waterway National Historic Site -
Honey Harbour Parking Lot
Georgian Bay Islands National Park of Canada -
Private Property boathouse dredge, Severn River, Trent-Severn Waterway
Trent-Severn Waterway National Historic Site -
Tobey Dock Reconstruction
Georgian Bay Islands National Park -
New Fibre Installation
Project Site 04: Loon Lake -
Beaver Creek Institution - Parking Expansion
Beaver Creek Institution -
New Fibre Installation
Project Site 05: Middle Mildrew Lake -
New Fibre Installation
Project Site 06: North Muldrew Lake -
Dock Removal - Georgian Bay Islands National Park
Georgian Bay Islands National Park -
New Fibre Installation
Project Site 11: South Muldrew Lake -
Upgrading of Roadways in Beausoleil First Nation
Beausoleil First Nation Reserve -
Beausoleil First Nation - Stormwater System Upgrade and Existing Drainage Rehabilitation
Beausoleil First Nation Reserve -
New Fibre Installation
Project Site 10: Silver Lake -
Little Brother Lake Dam Replacement
Trent-Severn Waterway National Historic Site of Canada -
New Fibre Installation - Kawarta
Project site 5: Kennisis Lake -
Dyer's Bay Small Craft Harbour - Wharf Repair
Dyer's Bay -
Septic (Holding Tank) Installation at Port Severn ON Post Office
3280 Port Severn Road South, Port Severn, Ontario -
Chippewas of Nawash First Nation Water System Upgrades
Chippewas of Nawash -
New Fibre Installation
Project Site 12: Sparrow Lake -
Haileybury Bin Wall Repairs - Summer 2021
Haileybury -
New Fibre Installation
Project site 17: Sheguandah Indian Reserve No.24 -
Shaw Farm Decommission
Bruce Peninsula National Park of Canada -
Gima Kwe Nong Parking Area
Bruce Peninsula National Park of Canada -
Gima Kwe Nong Dock Replacement
Bruce Peninsula National Park -
New Fibre Installation
Project Site 02: Kahshe Lake -
New Fibre Installation
Project site 10: WIKWEMIKONG UNCEDED RESERVE -
New Fibre Installation
Project Site 01: Bass Lake -
Chippewas of Nawash Lot Servicing
Chippewas of Nawash First Nation -
New Fibre Installation
Project site 18: Sucker Creek Indian Reserve No.23 -
Chippewas of Nawash Multi-use Building
Chippewas of Nawash First Nation -
Reconstruction of Nawash Unceded First Nation Roads and Culverts
Neyaashiinigmiig -
Hidden Valley Road Box Culvert
Bruce Peninsula National Park -
Aundeck Omni Kaning First Nation New Housing
Aundeck Omni Kaning First Nation -
Chippewas of Nawash Community Centre Renovations and Additions
Neyaashiinigmiing Reserve No. 27 -
Flowerpot Marl Bed Trail Restoration
Fathom Five National Marine Park of Canada -
Private Landowner Shoreline stabilization, Trent-Severn Waterway, Shoreline Works Permit 210241, Sparrow Lake, ON
Trent-Severn Waterway National Historic Site -
Resurface & Upgrade Paths to Improve Accessibility - Wye Marsh National Wildlife Area
Wye Marsh National Wildlife Area -
Rebuild Raptor Enclosure Structure - Wye Marsh National Wildlife Area
Wye Marsh National Wildlife Area -
Cyprus/Cameron Pedestrian Bridge Replacement
Bruce Peninsula National Park of Canada -
New Fibre Installation
Project Site 08: Riley Lake -
Private Landowner Shoreline stabilization, Shore wall, Trent-Severn Waterway, Shoreline Works Permit 200013
Trent-Severn Waterway National Historic Site -
Private Landowner Shoreline stabilization, Shore wall, Trent-Severn Waterway, Shoreline Works Permit 200127
Trent-Severn Waterway National Historic Site -
New Fibre Installation
Project Site 09: Severn River - Severn Waterway -
Lion's Head Harbour Dredging Project - Spring 2021
Lion's Head Harbour -
Couchiching Lock 42 and Bridge 56 Rehabilitation
Trent-Severn Waterway National Historic Site -
Canadian Coast Guard - Otter Islands Helipad Installations Project
North Otter island -
Kimball Cottage Decommission
Bruce Peninsula National Park of Canada -
Davis Cabin Relocation
Bruce Peninsula National Park of Canada -
New Fibre Installation - Kawarta
Project site 1: Bob Lake -
Canadian Coast Guard - Otter Islands Helipad Installations Project
South Otter Island -
Tobermory (Little Tub) Harbour - North and West Wall Rehabilitation
Tobermory -
Sagamok Anishnawbek - Family Hub Complex Construction
Sagamok Anishnawbek -
Sagamok First Nation- Tree Clearing and School Construction Project
Sagamok New School -
New Fibre Installation - Kawarta
Project site 2: Minden Lake -
Widjikiwe Gas Bar
Timiskaming -
Ontario Pumped Storage Hydropower Project
5 km north of Meaford -
Army Training Centre – Central (ATC-C) Meaford Staff Accommodation (M-202) Upgrades
ATC-C Meaford -
Melfa Range Drainage Improvements - 4th Canadian Division Training Centre (Meaford)
4th Canadian Division Training Centre (Meaford) -
Guardrail Installations at select Culverts on Lower Spring Road and 11th Line at 4 CDTC Meaford
4 CDTC Meaford -
DND Relocated Infrastructure Project at the 4th Canadian Division Training Center (4 CDTC) in Meaford, Ontario
4th Canadian Division Training Center -
Cassino Range Improvements - 4th Canadian Division Training Centre (Meaford)
4th Canadian Division Training Centre (Meaford) -
Paardeberg Range Improvements - 4th Canadian Division Training Centre (Meaford)
4th Canadian Division Training Centre (Meaford) -
4th Canadian Division Training Centre (Meaford) North Shore Road Erosion Control
4th Canadian Division Training Centre (Meaford) -
New Fibre Installation
Project site 20: M'chigeeng Indian Reserve No. 22 -
Sanitary Sewer Repairs - Phase 2
Timiskaming -
Replace Culverts on Lower Spring Road and 11th Line - 4th Canadian Division Training Centre (Meaford)
4th Canadian Division Training Centre (Meaford) -
Waste Transfer Station Construction
M'Chigeeng -
Ammunition Compound Control Gate - 4th Canadian Division Training Centre (Meaford)
4th Canadian Division Training Centre (Meaford) -
New Fibre Installation - Kawarta
Project site 4: Drag Lake -
Chippewas of Rama - Landfill Decommissioning/Transfer Station Construction
Chippewas of Rama -
Shilling Subdivision Chippewas of Rama First Nation
Chippewas of Rama First Nation -
Meaford Harbour Fuel Tank System Installation - 2021
Meaford -
Meaford Harbour - Dock Expansion Project
Meaford -
Gull River Dam 2 Repair, TSW, Minden Hills, Ontario
Trent-Severn Waterway National Historic Site of Canada -
Construction of six prefabricated housing units
Algonquins of Barrière Lake -
New Fibre Installation - Kawarta
Project site 9: Koshlong Lake -
Long Lake Dam Replacement
Trent-Severn Waterway National Historic Site of Canada -
Thornbury Harbour Fuel System Removal and Replacement - 2021
Thornbury Harbour -
Thornbury West Pier Deck Repairs - 2021
Thornbury -
Wiarton Breakwater Replacement
Wiarton Launch Ramp -
Dockside Dredge Trent-Severn In-Water and Shoreline Works Permit 190113
Trent-Severn Waterway National Historic Site -
New Fibre Installation - Kawarta
Project site 3: Little Dudmon Lake -
Canadian Nuclear Laboratories, Nuclear Power Demonstration Waste Facility Modification to Building Crawl Space
Canadian Nuclear Laboratories, Nuclear Power Demonstration Waste Facility, Rolphton, Ontario -
Canadian Nuclear Laboratories Nuclear Power Demonstration Waste Facility: Modification to Crawl Space
Canadian Nuclear Laboratories, Nuclear Power Demonstration Waste Facility, Rolphton, Ontario -
Break Wall Repairs by private home owner - 318433 Grey Rd 1, Owen Sound Harbour, ON
Owen Sound Harbour -
Construction of the Arctic Over-the-Horizon Radar (A-OTHR) Capability at 0 Thistle Trail, Kirkfield, Ontario
0 Thistle Trail, Kirkfield -
Potable Water Well Installation; private residence well.
Public Port of Owen Sound -
Nuclear Power Demonstration Closure Project
Rolphton -
Beaver Creek Institution - New/Existing Pump Station Upgrade
Beaver Creek -
Esson Lake Main dam and Side Dam Replacement
Trent-Severn Waterway National Historic Site of Canada -
Trent-Severn Waterway, Esson Lake Earth Dam Rehabilitation
Trent-Severn Waterway National Historic Site of Canada -
10th Street Bridge Reconstruction, Owen Sound
Owen Sound -
Ontario Waterways-Trent-Severn Waterway Kirkfield Shops Expansion
Trent-Severn Waterway National Historic Site -
Private Property dock side dredge Balsam Lake Trent-Severn Waterway
Trent-Severn Waterway National Historic Site -
Serpent River First Nation - Cutler Acid Remediation Project
Serpent River First Nation -
Rehabilitation of Algonquin Trail/OVRT
County of Renfrew -
New Fibre Installation - Kawarta
Project site 7: Four Mile Lake -
Serpent River First Nation - Micro Subdivision Development
Serpent River First Nation -
Replace Culvert on Orange Road, Garrison Petawawa Range and Training Area
Range and Training Area of Garrison Petawawa -
New Fibre Installation - Kawarta
Project site 6: Mitchell Lake -
Breaching Range Development in Areas 7 and 8, Range and Training Area, Garrison Petawawa
Range and Training Area, Garrison Petawawa (Area 7) -
Private Resident - Shoreline Stabilization
Trent-Severn Waterway National Historic Site of Canada -
Private Landowner Shoreline stabilization, Trent-Severn Waterway, Shoreline Works Permit 190274
Trent-Severn Waterway National Historic Site -
Construction of the Arctic Over-the-Horizon Radar (A-OTHR) Capability at 2225 15/16 Sideroad, Clearview Township, Ontario
2225 15/16 Sideroad, Clearview Township, Ontario -
Arctic Over-the-Horizon Radar Project — Clearview Receiver Site
Clearview Township -
New Fibre Installation
Project site: Various parts of Ontario -
Breaching Range Development in Areas 7 and 8, Range and Training Area, Garrison Petawawa
Range and Training Area, Garrison Petawawa (Area 8) -
Trent-Severn Waterway Durham Regional Road 50 Bridge
Trent-Severn Waterway National Historic Site -
Boundary Road Bridge Disposal, TSW, Mara-Eldon Boundary Road/Simcoe Street, Bolsover, Ontario
Trent-Severn Waterway National Historic Site of Canada -
Dredging Projects for Six (6) Properties Bordering the Trent-Severn Waterway: (1), Balsam Lake, (2) Buckhorn Lake, (3) Stoney Lake, (4) Pigeon Lake, (5) Balsam Lake, and (6) Sparrow Lake
(6) 3500 Lauderdale Point Cres, Severn, Sparrow Lake, O -
Replace Selected Exterior Hardscape, Retaining Wall and Fence
48 Owen Street, Barrie, Ontario -
New Fibre Installation
Project site 1: Dam Lake -
Construction of Two Temporary Buildings at Killaloe/Bonnechere Airport, Killaloe, Ontario
Killaloe -
New Fibre Installation
Project site 19: Sagamok Indian Reserve -
New Fibre Installation
Project site 09: SERPENT RIVER INDIAN RESERVE NO. 7 -
New Fibre Installation
Project site 13: SERPENT RIVER INDIAN RESERVE NO. 7 -
New Fibre Installation - Kawarta
Project site 8: Burnt River -
New Fibre Installation
Saugeen Indian Reserve No. 29 -
Construct Canadian Forces Housing Agency Housing Complexes - Garrison Petawawa
Garrison Petawawa -
Various Culvert Replacements 2022, Range and Training Area - Garrison Petawawa
Garrison Petawawa -
Construction of Petawawa Military Family Resource Centre - Garrison Petawawa
Garrison Petawawa -
Construction of Wildland Fire Fighting Training Building - Garrison Petawawa
Garrison Petawawa -
Expansion of Training Centre Infrastructure – Garrison Petawawa
Garrison Petawawa -
Construction of a Fire Access Road - Excalibur Pad- Garrison Petawawa
Garrison Petawawa -
Demolition of L-001 and Building L-054- Garrison Petawawa
Garrison Petawawa -
Repave Various Roads, Garrison Petawawa
4 CDSG, Garrison Petawawa -
Construction of a New Facility for 2 Service Battalion - Garrison Petawawa
Garrison Petawawa -
Range and Training Area Culvert Replacements and Maintenance 2023 - Garrison Petawawa
Garrison Petawawa -
Beaverton Small Craft Harbour Platform Removal
Beaverton, ON