Septic System Replacement - 2024

The purpose of this project is to decommission a failing septic system and install a new septic system on a residential property in Rouge National Urban Park. The project works will include site preparation, excavation, installation of the septic tank, and revegetation. During this work, proper erosion and sediment control practices will be installed as required, equipment will be driven in the area around the excavation, and fill will be stockpiled on site. The new septic system will be in compliance with the 2012 Ontario Building Code, as amended.


Latest update

June 24, 2024 – Parks Canada intends to make a determination regarding whether the carrying out of the project is likely to cause significant adverse environmental effects. To help inform this determination, Parks Canada is inviting public comments until July 24, 2024 respecting that determination.

Participate

Key documents

Key documents
Document Number Document Title File Date
1 New project being assessed by Parks Canada - Public comments invited from June 24 to July 24, 2024 - June 24, 2024

Contacts

Rouge National Urban Park
3545 Kingston Road, Floor #2
Scarborough, Ontario M1M 1R6
Telephone: 416-264-2020
Fax: 416-264-2167
Email: rouge@pc.gc.ca


  • Location

    • Rouge National Urban Park (Ontario)
  • Nature of Activity

    • Waste Management
  • Assessment Status

    In progress
  • Start Date

    2024-06-24
  • Proponent

    Parks Canada
  • Authorities

    • Parks Canada Agency
  • Assessment Type

    Project on federal lands
  • Reference Number

    88662
Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Nearby assessments

...within 200 kilometres
Date modified: